To view the PDF file, sign up for a MySharenet subscription.

EUROPA METALS LIMITED - Assay Results for HolesTOD-024 and TOD-025, Toral Pb, Zn & Ag Project, Spain

Release Date: 11/03/2020 09:00
Code(s): EUZ     PDF:  
Wrap Text
Assay Results for HolesTOD-024 and TOD-025, Toral Pb, Zn & Ag Project, Spain

Europa Metals Ltd
(Formerly Ferrum Crescent Limited)
(Incorporated and registered in Australia
and registered as an external company in
the Republic of South Africa)
(Registration number 4459850)
(External company registration number 2011/116305/10)
Share code on the ASX: EUZ
Share code on AIM: EUZ
Share code on the JSE: EUZ
ISIN: AU0000014342
("the Company")


Assay Results for HolesTOD-024 and TOD-025, Toral Pb, Zn & Ag Project, Spain

Europa Metals, the European focused lead-zinc and silver developer, is pleased to announce that
the assay results for the remaining drill holes TOD-024 and TOD-025 have now been received from
ALS Laboratories. These results contain the highest-grade intersection obtained by the Company to
date from its drilling campaigns on its wholly owned Toral lead, zinc and silver project (“Toral” or the
“Toral Project”) situated in the region of Castilla y León, north-west Spain.

Highlights:
   -   Assay results received for the remaining drill holes TOD-024 and TOD-025;
   -   Thick, high-grade zone confirmed outside of the current Indicated resource area in hole TOD-
       025:
           -   7.70m @ 17.3% ZnEq(PbAg) from 483.6m to 491.3m, including 4.3m @ 25.6%
               ZnEq(PbAg) from 486.3m to 490.6m;
           -   Highest grade intersection returned by Europa Metals to date from its drilling
               campaigns at Toral;
           -   Encouraging results that extend the current known high-grade area of the deposit and
               establish consistency with the historic grades encountered at the Toral Project from
               third-party drilling activities undertaken in the 1980s;
   -   Mineralisation confirmed above current Indicated resource area in hole TOD-024:
           o   1.7m @ 5.1% ZnEq(PbAg) from 280.8m to 282.5m;
   -   Copper results identified in hole TOD-024:
           o   0.9m @ 1.5% Cu from 278.9m to 279.8m;
   -   On conclusion of the current metallurgical testwork (expected during March 2020), the
       significant material recovered from drill hole TOD-025 will be utilised in a further phase of
       metallurgical testwork, to be undertaken by Wardell Armstrong International.


Laurence Read, Executive Director of Europa Metals, commented:
“Today’s high-grade assay results from hole TOD-025 are the highest obtained by Europa Metals
since we commenced drilling activities at Toral in 2017 and serve to establish continuity with the
results of historic third-party drilling campaigns in the 1980s. The intersections have enabled us to
obtain further mineralised core to continue with the metallurgical work programme, once the results
from the current testwork are received and reported. As previously announced, we shall not obtain
a further resource update at this stage, but will instead focus on establishing recoveries and potential
future saleable concentrate product types of zinc, lead and silver from the high-grade mining profile
being developed at Toral.”




Myles Campion, Technical Director of Europa Metals, further commented:
“The drilling of hole TOD-025 was an exciting process as we were able to visually identify coarse-
grained mineralisation. It is highly encouraging that this initial visual identification has now been
verified via today’s assay results. It represents the most significant hole drilled by the Company to
date at Toral and also ranks highly in comparison with the historic higher-grade intersections
returned across the deposit. In addition, importantly, the thickness of the high-grade intersection
obtained from hole TOD-025 confirms the continuity of thickness evident in the Indicated resource
area.”

Drill Campaign’s Objective
The key objective of the Company’s most recent drilling campaign, which completed in January
2020, was to infill gaps in the resource drilling pattern, around the current known Indicated resource
between the 300 - 600 metre horizon. The target area was purposefully located within the high-grade
core of the Toral Project in order to provide further data to support the extension of the Indicated
resource, when the next update is commissioned, and thereby increase confidence in the underlying
project economics. The drilling was conducted using the largest core size possible (PQ) to enable
the retrieval of a new sample for metallurgical testwork, with a view to delivering metallurgical data
across an increased area of the Toral deposit in order to provide a greater degree of spatial
representivity.

Key Drilling Data
Hole TOD-025 was drilled to intersect an area approximately 120m to the west of the current
Indicated resource area, designed to link up the Indicated zone to the east with a further zone of
concentrated data points to the west. Hole TOD-025 intersected a significant width of visually high-
grade mineralisation with coarse grained sphalerite and galena being present.

The intersection encountered in hole TOD-025 is of the highest grade that the Company has
obtained from its drilling activities to date, which commenced in 2017. The encouraging assay results
extend the current known high-grade area and are consistent with the grades obtained from historic
drilling activities by third parties at Toral in the 1980s.

Diagram 1, which can be viewed via the link below, illustrates the location of holes TOD-024 and
TOD-025 within the Toral block model:
http://www.rns-pdf.londonstockexchange.com/rns/6936F_1-2020-3-10.pdf

Hole TOD-024 was drilled higher up in the block model sequence than hole TOD-025 and was
designed to infill an area between known data points and possibly extend the current Indicated
resource area. Drilling parameters for the 2019/20 diamond drilling campaign, which concluded in
January 2020, are presented in Table 1 below.
  HOLE_ID      EASTING          NORTHING     COOR_SYS       RL (m)        Depth (m)       AZIMUTH         DIP
  TOD-024       681195          4710031     ETRS89utm29      532            302.4           212           -58
  TOD-025       681195          4710031     ETRS89utm29      532            497.2           212           -68.5



Drilling Results
Core obtained from holes TOD-024 and TOD-025 was sampled and sent to ALS Laboratories in
Spain, with initial results confirming the visual mineralisation as high-grade, with certain samples
having to be re-assayed due to the Pb content being above the detection limit at the laboratory.
Table 2 below shows the intercepts returned from the final assay results for hole TOD-025.
               From To
   Hole ID                 Interval Ag_ppm_Total Pb_%_Total Zn_%_total ZnEq(PbAg)% ZnEq(Pb)%
                (m)   (m)
  TOD-025      479.9 480.8   0.9        1.9         0.30       1.82        2.12       2.09
  TOD-025      480.8 481.3        0.5        0.2           0.02            0.06            0.08           0.07
  TOD-025      481.3  482         0.7        0.2           0.01            0.03            0.05           0.04
  TOD-025       482   482.5       0.5        0.2           0.01            0.03            0.05           0.04
  TOD-025      482.5 483.6        1.1        31.1          0.09            0.11            0.78           0.19
  TOD-025      483.6 484.2        0.6        5.6           0.98            4.31            5.30           5.19
  TOD-025      484.2 485.2        1          0.2           0.01            0.02            0.03           0.03
  TOD-025      485.2 486.3        1.1        13.8          2.81            0.27            3.07           2.81
  TOD-025      486.3  487         0.7        228           29.80          16.15           47.42           43.09
  TOD-025       487   487.5      0.5        174           12.65          10.60           25.34           22.04
  TOD-025      487.5 487.9        0.4        301           32.10           2.51           37.25           31.53
  TOD-025      487.9 488.4        0.5        80.2          13.25           0.06           13.56           12.04
  TOD-025      488.4 489         0.6         35           3.24           24.50           28.09           27.43
  TOD-025       489  489.8        0.8        16.6          2.53            3.35            5.95           5.64
  TOD-025      489.8 490.6        0.8        26.8          5.08           16.60           21.70           21.19
  TOD-025      490.6 491.3        0.7        4.6           1.01            1.88            2.87           2.78
  TOD-025      491.3 492.3        1          0.6           0.17            0.07            0.23           0.22
  TOD-025      492.3 493.3        1          0.6           0.01            0.05            0.07           0.05
  TOD-025      493.3 494.3        1          0.2           0.00            0.01            0.01           0.01



Table 3 below highlights the significant intercepts returned from the final assay results for hole TOD-
025:

             From        To
  Hole ID                        Interval   Ag_ppm_Total    Pb_%_Total Zn_%_total            ZnEq(PbAg)%
              (m)       (m)
 TOD-025     483.6     491.3       7.70        80.53               9.40           7.29            17.33
 TOD-025     485.2     491.3       6.10        97.78              11.39           8.43            20.58
 TOD-025     486.30    491.30      5.00        108.28             12.46           9.46            22.77
 TOD-025     486.30    490.60      4.30        123.09             14.09           10.54           25.62



Notes for table 2 and 3:
   •   Significant Zn Eq intercepts were generated using a 2% Zn Eq trigger value, minimum width of 1m, maximum
       consecutive waste interval of 2m, minimum average Zn Eq grade less than 2%.
   •   Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal
       Exchange and London Bullion Market Association giving an average Zn price of US$2,780/t, Pb price of
       US$2,200/t and Ag price of US$16.4/Oz. Recovery and selling factors were incorporated into the calculation of
       Zn Eq values. It is the company’s opinion that all the elements included in the metal equivalents calculation (Zinc,
       Lead and Silver) have a reasonable potential to be recovered and sold.
   •   Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter
       used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.904 + Ag*0.019).
   •   Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter
       used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.904 + Ag*0.019).
   •   No top cutting was applied to Zn, Pb, Ag or Cu grades.
   •   Interval widths reported are the downhole length and are unlikely to reflect true widths owing to the mineralisation
       style at the project. True thickness is approximately 70% of the drill thickness.




Metallurgical Programme
The current second phase of the metallurgical testwork, being undertaken by Wardell Armstrong
International, is nearing completion of the final lock cycle testwork and concentrate analysis.
Conclusion of this second phase is expected this month, with results expected to be announced
shortly thereafter.
On conclusion of the second phase, the significant material recovered from hole TOD-025 will be
utilised for a third phase of testwork by Wardell Armstrong International in order to provide a greater
degree of spatial representivity across the Toral deposit.

Competent Person’s Statement
The exploration results and activity reported in this announcement have been compiled and reviewed
by Mr Luis J. Pérez who is a Member of the Australian Institute of Geoscientists (AIG) and a
European Geologist (EurGeol). Mr Pérez has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to
be regarded as a qualified person under the AIM Note for Mining and Oil & Gas Companies dated
June 2009. Mr Pérez consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.

For further information on the Company, please visit www.europametals.com or contact:

Europa Metals Ltd
Dan Smith, Non-Executive Director and Company Secretary (Australia)
T: +61 417 978 955
Laurence Read, Executive Director (UK)
T: +44 (0)20 3289 9923

Strand Hanson Limited (Nominated Adviser)
Rory Murphy/Matthew Chandler
T: +44 (0)20 7409 3494

Turner Pope Investments (TPI) Limited (Broker)
Andy Thacker/Zoe Alexander
T: +44 (0)20 3657 0050
Sasfin Capital Proprietary Limited (a member of the Sasfin group)
Sharon Owens
T (direct): +27 11 809 7762

United Kingdom
11 March 2020

The information contained within this announcement is deemed by the Company to constitute inside
information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.




Appendix: Further information on the Toral Project

JORC (2012) Mineral Resource Estimate
The Toral Project is a traditional polymetallic (lead-zinc-silver) deposit, which is hosted over 6km of strike length of the prospective Lower
Cambrian Vegadeo Limestone formation, that is regionally mineralised along more than 40km of its extent. The deposit represents a
carbonate hosted, structurally controlled deposit type, demonstrating fault-controlled contact, vein, carbonate replacement and breccia
styles of mineralisation situated close to and along the boundary between footwall slates and hanging wall limestones and dolomites. Sub-
ordinate lead-zinc-silver mineralisation also occurs wholly within the hanging wall limestones and dolomites, approaching the contact with
the slates.

Historic drill hole re-logging undertaken by the Company in 2018 provided improved geological, structure, alteration and
weathering/oxidation information, which was incorporated into the interpreted geological and mineralised models for the current JORC
(2012) mineral resource estimate. Surface mapping and remote data interpretation by Europa Metals has enabled the development of an
interpreted fault model, also incorporated into the aforementioned updated geological and mineralised models used in the mineral resource
estimate.

The latest mineral resource estimate (as of 25 October 2019) for the Toral deposit comprised, at a 4% cut-off:

     •       An Indicated resource of approximately 2.7Mt @ 8.9% Zn Equivalent (including Pb credits), 5% Zn, 4.2% Pb and 32g/t Ag
                  -    Including 130,000 tonnes of zinc, 110,000 tonnes of lead and 2.8 million ounces of silver
     •       An Inferred resource of approximately 16Mt @ 7.2% Zn Equivalent (including Pb credits), 4.5% Zn, 2.9% Pb and 22g/t Ag
                  -    Including 690,000 tonnes of zinc, 450,000 tonnes of lead and 11 million ounces of silver
     •       Total Resources of approximately 18Mt @ 7.4% Zn Equivalent (including Pb credits), 4.5% Zn, 3.1% Pb and 24g/t Ag
                  -   Including 830,000 tonnes of zinc, 570,000 tonnes of lead and 14 million ounces of silver

The latest resource update identified potentially economic mineralisation ranging from surface to approximately 1,100m below surface.
The block model currently extends for a strike length of 3,600m and is still open to the east and west along strike and also at depth where
it has not yet been closed off.


    Cut-Off                                                                                   Contained        Contained         Ag Troy
                    Tonnes                   Zn Eq        Zn Eq       Zn     Pb       Ag
     Zn Eq                      Density                                                       Zn Tonnes        Pb Tonnes           Oz
                   (Millions)                (Pb)%      (PbAg)%       %      %        g/t
   (PbAg)%                                                                                      (000s)           (000s)         (Millions)

                                                                 Indicated
         6            2.1           3          10          11          6     4.7      35          120              100             2.4
         5            2.3          2.9        9.6          10          5     4.5      34          130              100             2.6
         4            2.7          2.9        8.9          9.5         5     4.2      32          130              110             2.8
         3            3.0          2.9        8.3          8.9         5     3.9      31          140              120             2.9
                                                                  Inferred
         6            11           2.9        8.4          8.9         5     3.5      26          550              360             8.8
         5            12           2.9        7.9          8.4         5     3.2      24          610              400             9.7
         4            16           2.9        7.2          7.6         5     2.9      22          690              450              11
         3            18           2.9        6.7          7.1         4     2.7      21          740              480              12
                                                                    Total
         6            13           2.9        8.7          9.2         5     3.7      28          670              460              11
         5             15           2.9        8.2          8.6         5     3.4      26            740             510              12
         4             18           2.9        7.4          7.9         5     3.1      24            830             570              14
         3             21           2.9        6.9          7.3         4     2.9      22            880             600              15
                                                     Transitional Oxide Material Total
         4             3            2.9        5.8          6.3         3     3.2      27            87               97             2.6
                                                      Unweathered Fresh Rock Total
         4             15           2.9        7.8          8.2         5     3.1      23            740             470              11

Table 4: Summary of mineral resources for the Toral property reported at a 4.0% Zn equivalent cut-off grade (including Pb and Ag
credits) and estimated grade and tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimate and
as such totals may not cast.

Notes for table 4:
1. No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have demonstrated
   economic viability.
2. Numbers are rounded to reflect the fact that an Estimate of Resources was reported as stipulated by JORC 2012. Rounding of
   numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.
3. Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal Exchange and
   London Bullion Market Association giving an average Zn price of US$2,780/t, Pb price of US$2,200/t and Ag price of US$16.4/oz.
   Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company’s opinion that all the elements
   included in the metal equivalents calculation (Zinc, Lead and Silver) have a reasonable potential to be recovered and sold.
4. Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-
   off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.935 + Ag*0.018).
5. Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.935).
6. The mineral resource estimate set out above for the zinc, lead and silver mineralisation in the Toral Project area is based on a 3D
   geologic model and wireframe restricted block model that integrated the exploration work on the Toral Project up to 30 September
   2019. The block model used uniform cell size of 50x4x50m to best suit the orientation of the mineralisation and sample spacing. The
   block model was rotated by 20° in plan view to best match the trend of mineralisation. Sub cells were applied to better fit the wireframe
   solid models and preserve accurate volume as much as possible. Cells were interpolated at the parent block scale using an ordinary
   kriging.
7. Top cuts were applied to the composite assay grades for 20% Zn, 17% Pb and 125 g/t Ag, any value above the top cut value was
   reduced to that grade.
8. The Indicated and Inferred mineral resource category for the Toral lead-zinc-silver project set out in Table 2 (at cut-off grades less
   than 4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for the Reporting of Exploration
   Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of
   The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).
9. The tonnes and grades reported at a cut-off grade of 3% Zn equivalent are below the economic cut-off grade of 4% and as such
   should not be considered mineral resources, they are shown here for comparison purposes only.

Bulk density
The resource database contains 2,373 bulk density measurements, with a total of 177 within the mineralised wireframe.

The mean for the mineralised domain transitional zone is 2.75 g/cm3 and the mean for the mineralised domain fresh material is 2.85 g/cm3.
A broad linear relationship between Pb+Zn grade and bulk density was identified from scattergrams and the formula 2.75 + 0.02(Pb+Zn%)
used to estimate block density within the block model.

Preliminary independent metallurgical test results from Wardell Armstrong International (“WAI”) (December 2019).
Overview of sample and metallurgical testwork carried out by WAI:
     •       Grind calibration tests to assess the Bond Abrasion, Rod and Ball work indices and uniaxial compressive strength;
     •       First open flotation tests, optimisation of grind size, float cleaning tests and rougher regrind testing;
     •       Petrographic/mineralogical and scanning electron microscope (SEM) work;
     •       First/single locked cycle testing; and
     •       A series of comminution tests were undertaken to investigate the crushing and grinding characteristics of the sample. The
             testing conducted investigated conventional crushing technologies, the results of which are summarised in the following table:

                                     Comminution Testwork Results
                                     Comminution Test                               Units   Value
                                     Unconfined Compressive Strength (UCS)          MPa     51.8
                                     Bond Abrasion Index                            -       0.5227
                                     Bond Rod Mill Work Index                       kWh/t   12.69
                                     Bond Ball Mill Work Index                      kWh/t   9.83
Flotation Testwork
A series of tests were undertaken to investigate the recovery of lead and zinc to separate concentrates by means of froth flotation. The
testing conducted consisted of: eight rougher flotation tests, four first-stage cleaner flotation tests, six three-stage cleaner flotation tests
and a single locked cycle flotation test.
The results of the locked cycle test are summarised below.

Table 2: Locked cycle flotation test results

                                                        Assay                                            Recovery (%)


Product           Mass (%)          Pb (%)          Zn (%)               Ag (ppm)           Pb             Zn                 Ag


Pb Cl 3 Conc      2.5                57.47          10.06                 1,457           84.30            9.65              90.35


Zn Cl 3 Conc      3.4                 1.16          55.78                  38.6            2.25           70.71               3.17


Zn Cl 1 Scav      5.3                 1.74           2.89                  28.8            5.36            5.82               3.76
Tailings

Zn Ro             88.8                0.16           0.41                  1.3             8.09           13.82               2.73
Tailings

Feed              100.0               1.73           2.65                  40.9           100.00         100.00             100.00


The locked cycle test achieved a lead recovery of 84.3% to a concentrate grading 57.5% Pb and a zinc recovery of 70.7% to a concentrate
grading 55.8% Zn. 90.3% of the silver was also recovered to the lead concentrate at a grade of 1,457ppm Ag.

Economic highlights from the Company’s selected development scenario

Estimated economic forecasts for the Toral Project based on the current level of work (+/-30%) from the Scoping Study (December 2018)
comprise:
•   US$110 million net present value (NPV) using a discount rate of 8%;
•   24.4% internal rate of return (IRR);
•   Estimated US$33 million CAPEX for a proposed 450ktpa design capacity plant, including associated auxiliary costs, with infrastructure
    being situated near portal entrance on the north side of the deposit;
•   Estimated total CAPEX of US$110 million;
•   US$25 per tonne indicative OPEX processing cost at steady state conditions;
•   US$36 per tonne indicative OPEX mining cost utilising mechanised cut and fill; and
•   15-year production plan, with significant potential for extension.

Basis for announcing economics

The factors that lead the Company to believe that it has a reasonable basis for announcing a production target and forecast financial
information are detailed in the Scoping Study and can be summarised as follows:

Three conceptual underground mining development and production scenarios were considered and developed throughout the Scoping
Study, resulting in the identification of a preferred scenario, highlights from which are set out below:
•   decline ramp access to the north of the deposit, targeting mine production within the higher-grade core towards the centre of the
    planned mining blocks;
•   entry to mine via a principal decline reaching various levels;
•   series of internal mining inclined ramps constructed to access levels;
•   mechanised cut and fill (MCAF) mining method proposed;
•   4x4 metre mine standard development size;
•   a ventilation raise would be drilled (raise-bored) to provide both adequate ambient conditions underground and a second, emergency
    means of access/egress into the mine;
•   ore transported to a flotation process plant by conveyor or haul truck from the mine and crushed to a suitable product for milling;
•   milled ore floated by standard flotation technology to provide lead and zinc concentrate, with silver probably reporting to the lead
    concentrate for sale as a combined product; and
•   4% Zn Eq cut-off used with potential for mine life extension.

Date: 11-03-2020 09:00:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story