To view the PDF file, sign up for a MySharenet subscription.

THARISA PLC - Minerals releases updated Competent Persons Report

Release Date: 07/06/2016 16:30
Code(s): THA     PDF:  
Wrap Text
Minerals releases updated Competent Person’s Report

Tharisa plc
(Incorporated in the Republic of Cyprus with limited liability)
(Registration number HE223412)
JSE share code: THA
LSE share code: THS
ISIN: CY0103562118
('Tharisa')


Tharisa Minerals releases updated Competent Person’s Report

Tharisa, the platinum group metals and chrome co-producer, today announced the release of an
updated Competent Persons Report (‘CPR’) prepared by Coffey Mining (SA) Pty Ltd (‘Coffey’), dated
31 December 2015.

A copy of the CPR, which is included in the prospectus for the purposes of applying for the admission
of its ordinary shares to the Official List (by way of a Standard Listing) and to trading on the London
Stock Exchange’s Main Market for listed securities, dated 2 June 2016, is available on Tharisa’s
website: www.tharisa.com.

A summary of the findings include:

    -   Mineral Resources remain unchanged at 829.0 Mt containing 1.56 g/t PGMs (6 PGE + Au)
        and 20.38 % Cr2O3
    -   Mineral Reserves of 106.4 Mt containing 1.45 g/t PGMs (5 PGE + Au) and 18.6% Cr2O3
        relating to the open pit only
    -   Tharisa Minerals’ steady state production of PGMs at 147.4 kozpa is up from the previous
        144.0 kozpa
    -   With the improved optimisation of the chrome processing spiral plant, the proportion of
        higher value speciality grade chrome concentrates increases from approximately 10.1% of
        chrome production for the financial year ended 30 September 2015 to approximately 23.4%
        of chrome production at steady state. This has resulted in a volumetric change of chrome
        concentrate steady state production from 1.5 Mt to 1.33 Mt.

Tharisa Minerals’ open pit life of mine remains approximately 20 years with the potential to extend
operations underground for a further 40 years out to FY2076.

The principal variances from the 2014 Mineral Reserve estimate prepared by Coffey, as disclosed in
the Tharisa annual financial statements for the financial year ended 30 September 2014 of 123.0 Mt
include:

    -   A change in mining methodology resulted in a reduction in the rate of dilution. This
        contributed a 1.9 Mt addition to the reserve
    -   The exclusion of the MG0 chromitite layer, due to practical and economic considerations,
        accounted for a 4.5 Mt decrease in the reserve
    -   A volume variance due to structural updates resulted in a 5.4 Mt decrease in the reserve
    -   Reserve depletions from mining for the intervening period reduced the reserve by an
        estimated 6.5 Mt
    -   Local design changes accounted for a decrease of 2.1 Mt based on the addition of a highwall
        ramp and the exclusion of steeper dipping areas in the far west pit.

The table below, as extracted from the CPR, details the steady state production of Tharisa Minerals
both excluding and including current optimisation initiatives being evaluated by Tharisa:




                              Tharisa Mine Technical Economic Model
                                      Steady State Production


                                                                        Excluding       Including
         Product                                          Unit
                                                                       Optimisation    Optimisation
Metallurgical grade chrome concentrate 42% Cr2O3           tpa         1 014 000       1 492 000
Chemical grade chrome concentrate 44% Cr2O3                tpa           256 800         154 000
Foundry grade chrome concentrate                           tpa            15 000           8 900
Chemical grade chrome concentrate 45% Cr2O3                tpa            40 013          34 000
(ArxMetals ) Concentrate
Total Chrome                                               tpa         1 330 000       1 689 000
PGMs in PGM concentrate                              5PGE+Au oz pa       147 399         159 000


Tharisa Minerals’ production drive is to optimise the recovery of higher value chrome concentrate
products (chemical and foundry grade concentrates) while minimising the impact on the production
of the metallurgical grade concentrate resulting in a reduction in the steady state target to 1.33 Mt
of chrome concentrates albeit with a higher sales value.

In the six months to end March 2016, the Group increased its production of specialty grade chrome
concentrates three fold to 105.8 Mt, while metallurgical chrome production stayed relatively steady
at almost 500 Mt.



By order of the Board

Paphos, Cyprus
7 June 2016

JSE Sponsor
Investec Bank Limited



For further information, contact:
Tharisa Plc                                      ir@tharisa.com
Sherilee Lakmidas



About Tharisa

Tharisa is an integrated resources group incorporating mining, processing, beneficiation, marketing,
sales and logistics of platinum group metals (‘PGMs’) and chrome concentrates. The Company’s
primary asset, the Tharisa Mine, which is located on the southwestern limb of South Africa’s
Bushveld Complex, has an estimated open pit life-of-mine of approximately 20 years, and a further
estimated underground life of mine of approximately 40 years.

The Tharisa Mine’s processing facilities comprise the Genesis Plant and the Voyager Plant, both PGM
and chrome concentrators, with a design capacity for processing a total of 400 ktpm of ROM ore. In
the financial year ended 30 September 2015 the Tharisa Mine produced PGM concentrates
containing 118 koz of 6E concentrate and chrome concentrates of 1.1 Mt including 112 kt of higher
value specialised chrome products, generating a consolidated EBITDA for Tharisa of US$29.0 million
and a profit before tax of US$9.6 million.

The quarter ended 31 March 2016 saw the Group record improvements in a number of key areas,
including reef mined exceeding the steady state required run rate of 4.8 Mtpa, mill throughput
performing at nameplate design capacity of 400 ktpm and contained PGM production on a 6E basis
meeting the steady state production level of 144 koz (all on an annualised basis).

Following a period of weak commodity prices subsequent to the end of FY2015, both chrome
concentrate prices and demand have recorded a recovery during Q3 FY2016 as demand returns to
previous levels with current transaction prices at approximately US$145 per tonne versus an average
of US$106 per tonne for H1 FY2016.

Not for publication, distribution or release in or into the United States of America, Canada,
Australia or Japan or any other jurisdiction in which publication or distribution would be unlawful.

Date: 07/06/2016 04:30:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story