BHP Billiton Production Report for the Nine Months Ended 31 March 2013
BHP BILLITON
NEWS RELEASE
Release Time IMMEDIATE
Date 17 April 2013
Number 05/13
BHP BILLITON PRODUCTION REPORT FOR THE NINE MONTHS ENDED 31 MARCH 2013
- Full year production guidance is retained for our major businesses following another quarter of robust
operating performance.
- Western Australia Iron Ore achieved record production for the nine month period ended March 2013.
Production guidance of 183 million tonnes (100% basis) for the 2013 financial year remains unchanged,
despite cyclone related downtime during the period. An annualised production rate approaching
200 million tonnes (100% basis) is anticipated for the June 2013 quarter.
- Onshore US produced more than five million barrels of liquids during the March 2013 quarter and the
Eagle Ford is now our single largest liquids producing field. Petroleum production guidance for the
2013 financial year remains unchanged at approximately 240 million barrels of oil equivalent.
- Copper in concentrate production at Escondida increased by 61% during the nine month period ended
March 2013. Total Escondida copper production remains on track to increase by at least 20% in the 2013
financial year.
- Queensland Coal production was affected by adverse weather conditions during the March 2013
quarter. However, recently installed flood mitigation infrastructure enabled a rapid recovery in
performance and the business was operating at full supply chain capacity at the end of the period.
Petroleum
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Crude oil, condensate and natural gas liquids (‘000 boe) 66,610 20,871 1% -4% -10%
Natural gas (bcf) 659.78 207.27 10% -1% -6%
Total petroleum products (million boe) 176.57 55.42 6% -2% -7%
Total petroleum production – An average production rate of 644 thousand barrels of oil equivalent per day was
achieved during the nine month period ended March 2013. Guidance for the 2013 financial year remains
unchanged at approximately 240 million barrels of oil equivalent.
Crude oil, condensate and natural gas liquids – A 15 per cent increase in liquids production at our Onshore US
business during the March 2013 quarter partially offset cyclone related downtime at our Western Australian
operations, extended maintenance and drilling delays at our non-operated facilities in the Gulf of Mexico (US) and
natural field decline.
Onshore US produced more than five million barrels of liquids during the March 2013 quarter and the Eagle Ford is
now our single largest liquids producing field. These record volumes are expected to grow further in the June 2013
quarter as additional wells come online and infrastructure projects are completed.
Natural gas – A reduction in gas production in the March 2013 quarter reflected lower levels of drilling activity in
our dry gas Haynesville and Fayetteville fields (US) and a seasonal reduction in natural gas demand at Bass Strait
(Australia).
Aluminium and Nickel
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Alumina ('000 tonnes) 3,615 1,213 16% 15% -2%
Aluminium ('000 tonnes) 871 304 -4% 10% 2%
Nickel ('000 tonnes) 113.8 42.1 -1% 1% 21%
Alumina – The continued ramp up of the Efficiency and Growth project at Worsley (Australia) contributed to record
alumina production for the nine month period ended March 2013.
Aluminium – An increase in metal production from the March 2012 quarter reflected a return to full technical
capacity at Hillside (South Africa).
Nickel – Nickel production increased by 21 per cent from the December 2012 quarter as the Nickel West smelter
and refinery (Australia) returned to full capacity following the successful completion of planned maintenance in the
prior period. Total nickel production was further supported by strong performance at Cerro Matoso (Colombia).
Base Metals
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Copper (‘000 tonnes) 876.2 307.1 12% 9% 4%
Lead (tonnes) 147,398 49,080 -16% -8% 6%
Zinc (tonnes) 82,324 30,193 1% 2% 15%
Silver (‘000 ounces) 26,565 8,843 -11% -9% 3%
Uranium oxide concentrate (Uranium) (tonnes) 2,989 933 7% 4% -8%
Copper – Copper in concentrate production at Escondida (Chile) increased by 61 per cent during the nine month
period ended March 2013. Production benefited from an increase in the average copper grade mined to 1.4 per
cent. Total Escondida copper production remains on track to increase by at least 20 per cent in the 2013 financial
year.
Antamina (Peru) achieved record production for the nine month period ended March 2013, despite a temporary
reduction in the copper to zinc ore grade ratio during the recent quarter. Olympic Dam (Australia) production
increased by 42 per cent in the March 2013 quarter following the completion of major planned maintenance in the
prior period.
Lead/silver – Lead and silver production decreased at Cannington (Australia) during the nine month period ended
March 2013 due to lower average ore grades.
Zinc – Production increased by 15 per cent from the December 2012 quarter and reflected a temporary increase in
the grade profile at Antamina.
Uranium – Uranium production increased by seven per cent during the nine month period ended March 2013 due
to higher recoveries and increased plant availability at Olympic Dam.
BHP Billiton Production Report for the nine months ended 31 March 2013 2
Diamonds and Specialty Products
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Diamonds (‘000 carats) 930 322 -32% -26% 9%
Diamonds – On 10 April 2013, BHP Billiton completed the sale of its diamonds business, comprising its interests in
the EKATI Diamond Mine and Diamonds Marketing operations, to Dominion Diamond Corporation for an aggregate
cash consideration of US$553 million (after adjustments).
Iron Ore
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Iron ore (‘000 tonnes) 122,167 40,205 3% 6% -5%
Iron ore – Western Australia Iron Ore (WAIO) achieved record production for the nine month period ended March
2013. Production guidance of 183 million tonnes (100 per cent basis) for the 2013 financial year remains
unchanged, despite cyclone related downtime during the period. An annualised production rate approaching
200 million tonnes (100 per cent basis) is anticipated for the June 2013 quarter.
The Jimblebar Mine Expansion is on schedule for first production in the March 2014 quarter and will broadly match
mine and port capacity at 220 million tonnes per annum (100 per cent basis). The progressive debottlenecking of
the supply chain is expected to underpin substantial low cost, longer term growth in our WAIO business.
Samarco (Brazil) continued to operate at capacity during the March 2013 quarter.
Manganese
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Manganese ore (‘000 tonnes) 6,271 2,008 7% -2% -5%
Manganese alloy (‘000 tonnes) 426 143 -19% 4% -7%
Manganese ore – Record ore production for the nine month period ended March 2013 reflected a substantial
improvement in plant availability at GEMCO (Australia), the world’s largest and lowest cost manganese operation.
Manganese alloy – The decrease in alloy volumes during the nine month period ended March 2013 was largely
attributable to the permanent closure of energy intensive silicomanganese production at Metalloys (South Africa) in
January 2012.
Metallurgical Coal
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Metallurgical coal (‘000 tonnes) 26,792 8,966 7% 22% 1%
Metallurgical coal – Queensland Coal (Australia) production was affected by adverse weather conditions during
the March 2013 quarter. However, recently installed flood mitigation infrastructure enabled a rapid recovery in
performance and the business was operating at full supply chain capacity at the end of the period. South Walker
Creek achieved record quarterly production following the completion of a wash plant upgrade in the prior period.
BHP Billiton Production Report for the nine months ended 31 March 2013 3
Our Queensland Coal operations achieved a significant milestone during the quarter with first production achieved
at the Daunia mine, ahead of schedule. The ramp up of this mine and future commissioning of Caval Ridge will
underpin an increase in the capacity of our Queensland Coal business to 66 million tonnes per annum (100 per
cent basis) by the end of the 2014 calendar year.
A planned longwall move at the Dendrobium mine resulted in lower production at Illawarra Coal (Australia) in the
March 2013 quarter. A longwall move is scheduled at the West Cliff mine during the June 2013 quarter.
Energy Coal
MAR MAR MAR YTD13 MAR Q13 MAR Q13
2013 2013 vs vs vs
YTD QTR MAR YTD12 MAR Q12 DEC Q12
Energy coal (‘000 tonnes) 53,349 15,486 1% -10% -15%
Energy coal – New South Wales Energy Coal (Australia) continued to benefit from the ramp up of the RX1 project
with record production achieved for the nine month period ended March 2013. Production in the March 2013
quarter was affected by adverse weather conditions on the east coast of Australia and industrial action at Cerrejon
Coal (Colombia) that preceded successful resolution of a new three year Enterprise Agreement.
BHP Billiton Production Report for the nine months ended 31 March 2013 4
This report, together with the Exploration and Development Report, represents the Interim Management Statement
for the purposes of the UK Listing Authority’s Disclosure and Transparency Rules. There have been no significant
changes in the financial position of the Group in the quarter ended 31 March 2013.
Further information on BHP Billiton can be found at: www.bhpbilliton.com
Media Relations Investor Relations
Australia Australia
Gabrielle Notley James Agar
Tel: +61 3 9609 3830 Mobile: +61 477 325 803 Tel: +61 3 9609 2222 Mobile: +61 467 807 064
email: Gabrielle.Notley@bhpbilliton.com email: James.Agar@bhpbilliton.com
Fiona Hadley Andrew Gunn
Tel: +61 3 9609 2211 Mobile: +61 427 777 908 Tel: +61 3 9609 3575 Mobile: +61 402 087 354
email: Fiona.Hadley@bhpbilliton.com email: Andrew.Gunn@bhpbilliton.com
Eleanor Nichols United Kingdom and South Africa
Tel: +61 3 9609 2360 Mobile: +61 407 064 748
email: Eleanor.Nichols@bhpbilliton.com Tara Dines
Tel: +44 20 7802 7113 Mobile: +44 7825 342 232
United Kingdom Email: Tara.Dines@bhpbilliton.com
Ruban Yogarajah Americas
Tel: +44 20 7802 4033 Mobile: +44 7827 082 022
email: Ruban.Yogarajah@bhpbilliton.com Brendan Harris
Tel: +44 20 7802 4131 Mobile: +44 7990 527 726
Jennifer White email: Brendan.Harris@bhpbilliton.com
Tel: +44 20 7802 7462 Mobile: +44 7827 253 764
email: Jennifer.White@bhpbilliton.com Matt Chism
Tel: +1 71 359 96158 Mobile: +1 281 782 2238
Americas email: Matt.E.Chism@bhpbilliton.com
Jaryl Strong
Tel: +1 713 499 5548 Mobile: +1 281 222 6627
email: Jaryl.Strong@bhpbilliton.com
BHP Billiton Limited ABN 49 004 028 077 BHP Billiton Plc Registration number 3196209
Registered in Australia Registered in England and Wales
Registered Office: 180 Lonsdale Street Registered Office: Neathouse Place
Melbourne Victoria 3000 Australia London SW1V 1BH United Kingdom
Tel +61 1300 55 4757 Fax +61 3 9609 3015 Tel +44 20 7802 4000 Fax +44 20 7802 4111
Members of the BHP Billiton Group which is headquartered in Australia
Sponsor: Absa Capital (the investment banking division of Absa Bank Limited, affiliated with Barclays)
BHP Billiton Production Report for the nine months ended 31 March 2013 5
BHP BILLITON PRODUCTION SUMMARY
QUARTER ENDED YEAR TO DATE % CHANGE
MAR YTD13 MAR Q13 MAR Q13
MAR DEC MAR MAR MAR vs vs vs
2012 2012 2013 2013 2012 MAR YTD12 MAR Q12 DEC Q12
PETROLEUM
Crude oil & condensate ('000 bbl) 18,127 19,228 16,689 53,953 55,475 -3% -8% -13%
Natural gas (bcf) 209.17 219.66 207.27 659.78 601.01 10% -1% -6%
NGL ('000 boe) 3,609 4,064 4,182 12,657 10,327 23% 16% 3%
Total petroleum products (million boe) 56.60 59.90 55.42 176.57 165.98 6% -2% -7%
ALUMINIUM AND NICKEL
Alumina ('000 tonnes) 1,052 1,232 1,213 3,615 3,113 16% 15% -2%
Aluminium ('000 tonnes) 277 297 304 871 905 -4% 10% 2%
Nickel ('000 tonnes) 41.7 34.7 42.1 113.8 115.2 -1% 1% 21%
BASE METALS
Copper ('000 tonnes) 281.4 295.2 307.1 876.2 782.0 12% 9% 4%
Lead (tonnes) 53,560 46,135 49,080 147,398 176,211 -16% -8% 6%
Zinc (tonnes) 29,727 26,209 30,193 82,324 81,469 1% 2% 15%
Gold (ounces) 44,684 38,092 42,076 112,604 128,130 -12% -6% 10%
Silver ('000 ounces) 9,715 8,557 8,843 26,565 29,769 -11% -9% 3%
Uranium oxide concentrate (tonnes) 896 1,014 933 2,989 2,805 7% 4% -8%
Molybdenum (tonnes) 521 410 321 1,185 1,882 -37% -38% -22%
DIAMONDS AND SPECIALTY PRODUCTS
Diamonds ('000 carats) 433 295 322 930 1,371 -32% -26% 9%
IRON ORE
Iron ore ('000 tonnes) 37,943 42,190 40,205 122,167 118,587 3% 6% -5%
MANGANESE
Manganese ore ('000 tonnes) 2,040 2,117 2,008 6,271 5,865 7% -2% -5%
Manganese alloy ('000 tonnes) 138 153 143 426 527 -19% 4% -7%
METALLURGICAL COAL
Metallurgical coal ('000 tonnes) 7,337 8,888 8,966 26,792 25,121 7% 22% 1%
ENERGY COAL
Energy coal ('000 tonnes) 17,248 18,256 15,486 53,349 52,627 1% -10% -15%
Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 1
BHP BILLITON ATTRIBUTABLE PRODUCTION
QUARTER ENDED YEAR TO DATE
BHP Billiton MAR JUN SEP DEC MAR MAR MAR
interest 2012 2012 2012 2012 2013 2013 2012
PETROLEUM
Production
Crude oil & condensate ('000 bbl) 18,127 15,726 18,036 19,228 16,689 53,953 55,475
Natural gas (bcf) 209.17 221.25 232.85 219.66 207.27 659.78 601.01
NGL ('000 boe) (a) 3,609 3,758 4,411 4,064 4,182 12,657 10,327
Total petroleum products (million boe) 56.60 56.36 61.25 59.90 55.42 176.57 165.98
ALUMINIUM AND NICKEL
ALUMINA
Saleable production ('000 tonnes)
Worsley 86% 741 730 859 944 911 2,714 2,187
Alumar 36% 311 309 311 288 302 901 926
Total 1,052 1,039 1,170 1,232 1,213 3,615 3,113
ALUMINIUM
Production ('000 tonnes)
Hillside 100% 144 117 139 166 177 482 504
Bayside 100% 26 23 25 25 26 76 75
Alumar 40% 42 42 39 39 37 115 128
Mozal 47% 65 66 67 67 64 198 198
Total 277 248 270 297 304 871 905
NICKEL
Saleable production ('000 tonnes)
Cerro Matoso 99.9% 13.4 12.8 13.3 12.4 12.3 38.0 36.1
Nickel West 100% 28.3 29.9 23.7 22.3 29.8 75.8 79.1
Total 41.7 42.7 37.0 34.7 42.1 113.8 115.2
BASE METALS (b)
COPPER
Payable metal in concentrate ('000 tonnes)
Escondida 57.5% 87.7 115.8 101.2 120.7 128.0 349.9 218.0
Antamina 33.8% 30.9 34.9 40.2 39.6 25.2 105.0 92.1
Pinto Valley 100% - - - 0.5 5.3 5.8 -
Total 118.6 150.7 141.4 160.8 158.5 460.7 310.1
Cathode ('000 tonnes)
Escondida 57.5% 47.4 48.7 41.6 40.8 43.3 125.7 123.3
Pampa Norte (c) 100% 66.2 62.1 52.7 58.8 56.4 167.9 201.6
Pinto Valley 100% 1.4 1.2 1.2 1.2 1.2 3.6 4.2
Olympic Dam 100% 47.8 49.8 37.0 33.6 47.7 118.3 142.8
Total 162.8 161.8 132.5 134.4 148.6 415.5 471.9
Total Copper 281.4 312.5 273.9 295.2 307.1 876.2 782.0
LEAD
Payable metal in concentrate (tonnes)
Cannington 100% 53,412 63,334 51,923 45,937 48,899 146,759 175,756
Antamina 33.8% 148 333 260 198 181 639 455
Total 53,560 63,667 52,183 46,135 49,080 147,398 176,211
ZINC
Payable metal in concentrate (tonnes)
Cannington 100% 12,904 12,540 11,408 13,622 11,045 36,075 42,137
Antamina 33.8% 16,823 18,208 14,514 12,587 19,148 46,249 39,332
Total 29,727 30,748 25,922 26,209 30,193 82,324 81,469
Refer footnotes on page 4.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 2
BHP BILLITON ATTRIBUTABLE PRODUCTION
QUARTER ENDED YEAR TO DATE
BHP Billiton MAR JUN SEP DEC MAR MAR MAR
interest 2012 2012 2012 2012 2013 2013 2012
BASE METALS (continued)
GOLD
Payable metal in concentrate (ounces)
Escondida 57.5% 12,732 12,817 9,419 13,877 14,545 37,841 38,037
Olympic Dam (refined gold) 100% 31,952 27,752 23,017 24,215 27,531 74,763 90,093
Total 44,684 40,569 32,436 38,092 42,076 112,604 128,130
SILVER
Payable metal in concentrate ('000 ounces)
Escondida 57.5% 481 488 350 481 493 1,324 1,433
Antamina 33.8% 1,170 1,043 919 934 802 2,655 3,229
Cannington 100% 7,836 9,757 7,689 6,949 7,323 21,961 24,451
Olympic Dam (refined silver) 100% 228 251 207 193 214 614 656
Pinto Valley 100% - - - - 11 11 -
Total 9,715 11,539 9,165 8,557 8,843 26,565 29,769
URANIUM OXIDE CONCENTRATE
Payable metal in concentrate (tonnes)
Olympic Dam 100% 896 1,080 1,042 1,014 933 2,989 2,805
Total 896 1,080 1,042 1,014 933 2,989 2,805
MOLYBDENUM
Payable metal in concentrate (tonnes)
Antamina 33.8% 521 464 454 410 321 1,185 1,882
Total 521 464 454 410 321 1,185 1,882
DIAMONDS AND SPECIALTY PRODUCTS
DIAMONDS
Production ('000 carats)
EKATI™ 80% 433 413 313 295 322 930 1,371
Refer footnotes on page 4.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 3
BHP BILLITON ATTRIBUTABLE PRODUCTION
QUARTER ENDED YEAR TO DATE
BHP Billiton MAR JUN SEP DEC MAR MAR MAR
interest 2012 2012 2012 2012 2013 2013 2012
IRON ORE
Production ('000 tonnes) (d)
Newman (e) 85% 11,789 13,132 11,752 12,809 13,028 37,589 38,194
Goldsworthy Joint Venture 85% 37 143 432 378 296 1,106 625
Area C Joint Venture 85% 10,343 11,166 10,937 10,245 10,983 32,165 31,259
Yandi Joint Venture 85% 13,063 13,595 13,771 15,954 13,302 43,027 39,941
Samarco 50% 2,711 2,855 2,880 2,804 2,596 8,280 8,568
Total 37,943 40,891 39,772 42,190 40,205 122,167 118,587
MANGANESE
MANGANESE ORES
Saleable production ('000 tonnes)
South Africa (f) 44.4% 917 989 858 834 859 2,551 2,636
Australia (f) 60% 1,123 1,077 1,288 1,283 1,149 3,720 3,229
Total 2,040 2,066 2,146 2,117 2,008 6,271 5,865
MANGANESE ALLOYS
Saleable production ('000 tonnes)
South Africa (f) (g) 60% 81 75 93 91 86 270 329
Australia (f) 60% 57 - 37 62 57 156 198
Total 138 75 130 153 143 426 527
METALLURGICAL COAL
Production ('000 tonnes) (h)
BMA 50% 4,226 4,105 5,182 5,440 5,327 15,949 14,506
BHP Mitsui Coal (i) 80% 1,649 1,661 1,766 1,589 1,862 5,217 5,032
Illawarra 100% 1,462 2,343 1,990 1,859 1,777 5,626 5,583
Total 7,337 8,109 8,938 8,888 8,966 26,792 25,121
ENERGY COAL
Production ('000 tonnes)
South Africa 100% 7,895 8,313 8,454 7,969 7,302 23,725 24,966
USA 100% 2,109 2,673 3,871 2,798 2,835 9,504 6,739
Australia 100% 4,291 4,393 4,453 4,827 3,837 13,117 12,364
Colombia 33% 2,953 3,105 2,829 2,662 1,512 7,003 8,558
Total 17,248 18,484 19,607 18,256 15,486 53,349 52,627
(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels
of oil equivalent (boe).
(b) Metal production is reported on the basis of payable metal.
(c) Includes Cerro Colorado and Spence.
(d) Iron ore production is reported on a wet tonnes basis.
(e) Newman includes Mt Newman Joint Venture and Jimblebar.
(f) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(g) Production includes Medium Carbon Ferro Manganese.
(h) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 4
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
PETROLEUM
BHP Billiton attributable production unless otherwise stated.
CRUDE OIL & CONDENSATE ('000 barrels)
Bass Strait 2,285 2,357 2,569 2,081 1,934 6,584 7,002
North West Shelf 1,671 1,587 1,867 1,829 1,526 5,222 4,757
Stybarrow 618 635 534 464 323 1,321 2,625
Pyrenees 2,540 2,482 2,605 2,379 1,659 6,643 9,648
Other Australia (a) 13 13 17 15 15 47 39
Atlantis (b) 2,262 39 1,554 2,376 1,471 5,401 6,733
Mad Dog (b) - - 369 906 791 2,066 -
Shenzi (b) 4,071 3,607 3,783 4,008 3,580 11,371 12,038
Onshore US (c) 2,202 2,434 2,358 2,658 3,071 8,087 4,505
Trinidad/Tobago 453 488 376 362 331 1,069 1,385
Other Americas (b) (d) 373 348 367 410 384 1,161 1,120
UK 328 367 260 355 326 941 1,208
Algeria (e) 1,236 1,291 1,309 1,316 1,207 3,832 4,171
Pakistan 75 78 68 69 71 208 244
Total 18,127 15,726 18,036 19,228 16,689 53,953 55,475
NATURAL GAS (billion cubic feet)
Bass Strait 19.74 31.47 40.06 26.67 23.38 90.11 75.27
North West Shelf 29.60 29.80 35.33 34.09 31.29 100.71 95.13
Other Australia (a) 4.42 4.87 6.20 5.48 5.17 16.85 13.43
Atlantis (b) 1.18 0.01 0.59 0.89 0.54 2.02 2.49
Mad Dog (b) - - 0.06 0.18 0.15 0.39 -
Shenzi (b) 0.56 0.47 2.11 0.94 0.81 3.86 1.75
Onshore US (c) 124.17 124.53 122.59 123.03 115.69 361.31 323.39
Trinidad/Tobago 9.50 9.54 9.21 9.15 8.84 27.20 28.53
Other Americas (b) (d) 1.09 0.79 0.35 0.48 0.59 1.42 3.26
UK 5.03 5.54 3.29 5.26 6.44 14.99 14.45
Pakistan 13.88 14.23 13.06 13.49 14.37 40.92 43.31
Total 209.17 221.25 232.85 219.66 207.27 659.78 601.01
NGL ('000 barrels of oil equivalent)
Bass Strait 1,355 1,738 2,053 1,342 1,405 4,800 4,585
North West Shelf 421 342 385 354 323 1,062 1,278
Atlantis (b) 221 1 54 209 96 359 464
Mad Dog (b) - - 16 72 55 143 -
Shenzi (b) 291 244 370 324 269 963 880
Onshore US (c) 1,275 1,388 1,516 1,736 2,004 5,256 2,634
Other Americas (b) (d) 34 24 17 16 13 46 109
UK 12 21 - 11 17 28 75
Algeria (e) - - - - - - 302
Total 3,609 3,758 4,411 4,064 4,182 12,657 10,327
TOTAL PETROLEUM PRODUCTS 56.60 56.36 61.25 59.90 55.42 176.57 165.98
(million barrels of oil equivalent) (f)
(a) Other Australia includes Minerva.
(b) Gulf of Mexico volumes are net of royalties.
(c) Petrohawk Energy Corporation acquisition completed on 20 August 2011. Onshore US volumes are net of mineral holder royalties.
(d) Other Americas includes Neptune, West Cameron 76, Genesis and Starlifter. West Cameron 76 and Starlifter were divested in May 2012.
(e) Algeria includes ROD and Ohanet. The Ohanet Risk Sharing Contract expired in October 2011.
(f) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 5
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
ALUMINIUM AND NICKEL
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
ALUMINA
Saleable production
Worsley, Australia 741 730 859 944 911 2,714 2,187
Alumar, Brazil 311 309 311 288 302 901 926
Total 1,052 1,039 1,170 1,232 1,213 3,615 3,113
Sales
Worsley, Australia 713 750 820 916 910 2,646 2,178
Alumar, Brazil 216 356 352 298 296 946 845
Total 929 1,106 1,172 1,214 1,206 3,592 3,023
ALUMINIUM
Production
Hillside, South Africa 144 117 139 166 177 482 504
Bayside, South Africa 26 23 25 25 26 76 75
Alumar, Brazil 42 42 39 39 37 115 128
Mozal, Mozambique 65 66 67 67 64 198 198
Total 277 248 270 297 304 871 905
Sales
Hillside, South Africa 141 126 139 171 166 476 490
Bayside, South Africa 27 21 26 26 27 79 76
Alumar, Brazil 31 45 46 41 39 126 118
Mozal, Mozambique 66 54 58 65 76 199 211
Total 265 246 269 303 308 880 895
NICKEL
Cerro Matoso, Colombia
Production 13.4 12.8 13.3 12.4 12.3 38.0 36.1
Sales 13.8 12.9 12.3 13.7 13.0 39.0 34.6
Nickel West, Australia
Saleable production
Nickel contained in concentrate 2.3 2.3 1.3 4.1 3.1 8.5 6.7
Nickel contained in finished matte 10.5 14.2 5.8 7.6 9.7 23.1 34.7
Nickel metal 15.5 13.4 16.6 10.6 17.0 44.2 37.7
Nickel production 28.3 29.9 23.7 22.3 29.8 75.8 79.1
Sales
Nickel contained in concentrate 1.5 3.6 1.6 2.9 3.1 7.6 5.3
Nickel contained in finished matte 10.2 16.7 6.7 7.0 9.0 22.7 34.2
Nickel metal 14.2 15.7 14.2 12.8 19.5 46.5 34.5
Nickel sales 25.9 36.0 22.5 22.7 31.6 76.8 74.0
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 6
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
BASE METALS
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.
Escondida, Chile
Material mined (100%) ('000 tonnes) 103,321 109,724 102,499 96,938 94,567 294,004 268,479
Sulphide ore milled (100%) ('000 tonnes) 16,449 18,640 16,850 18,796 18,964 54,610 47,141
Average copper grade (%) 1.14% 1.37% 1.35% 1.39% 1.44% 1.40% 1.03%
Production ex mill (100%) ('000 tonnes) 153.1 211.7 185.2 216.6 229.3 631.1 389.3
Production
Payable copper ('000 tonnes) 87.7 115.8 101.2 120.7 128.0 349.9 218.0
Payable gold concentrate (fine ounces) 12,732 12,817 9,419 13,877 14,545 37,841 38,037
Copper cathode (EW) ('000 tonnes) 47.4 48.7 41.6 40.8 43.3 125.7 123.3
Payable silver concentrate ('000 ounces) 481 488 350 481 493 1,324 1,433
Sales
Payable copper ('000 tonnes) 82.6 113.1 95.7 134.7 123.8 354.2 213.9
Payable gold concentrate (fine ounces) 11,998 12,683 8,999 11,060 10,537 30,596 37,407
Copper cathode (EW) ('000 tonnes) 44.3 53.4 38.8 46.8 34.0 119.6 115.3
Payable silver concentrate ('000 ounces) 454 483 324 444 414 1,182 1,416
Pampa Norte, Chile
Cerro Colorado
Material mined ('000 tonnes) 16,320 16,246 16,067 15,722 14,964 46,753 47,848
Ore milled ('000 tonnes) 4,300 4,388 4,505 4,206 4,350 13,061 13,509
Average copper grade (%) 0.72% 0.61% 0.55% 0.66% 0.65% 0.62% 0.72%
Production
Copper cathode (EW) ('000 tonnes) 18.7 18.7 17.8 17.9 14.6 50.3 64.7
Sales
Copper cathode (EW) ('000 tonnes) 20.2 19.1 16.1 18.8 13.7 48.6 66.4
Spence
Material mined ('000 tonnes) 29,982 28,594 27,541 25,999 28,861 82,401 76,309
Ore milled ('000 tonnes) 4,279 3,604 3,752 4,161 4,041 11,954 13,050
Average copper grade (%) 1.20% 1.28% 1.17% 1.29% 1.38% 1.28% 1.33%
Production
Copper cathode (EW) ('000 tonnes) 47.5 43.4 34.9 40.9 41.8 117.6 136.9
Sales
Copper cathode (EW) ('000 tonnes) 44.1 51.3 31.1 42.6 29.8 103.5 133.9
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 7
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
BASE METALS
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.
Antamina, Peru
Material mined (100%) ('000 tonnes) 41,474 48,256 54,482 49,246 48,032 151,760 124,445
Sulphide ore milled (100%) ('000 tonnes) 10,162 12,295 12,274 11,752 10,330 34,356 29,214
Average head grades
- Copper (%) 1.10% 1.01% 1.15% 1.16% 0.88% 1.07% 1.12%
- Zinc (%) 0.84% 0.80% 0.66% 0.64% 0.93% 0.73% 0.75%
Production
Payable copper ('000 tonnes) 30.9 34.9 40.2 39.6 25.2 105.0 92.1
Payable zinc (tonnes) 16,823 18,208 14,514 12,587 19,148 46,249 39,332
Payable silver ('000 ounces) 1,170 1,043 919 934 802 2,655 3,229
Payable lead (tonnes) 148 333 260 198 181 639 455
Payable molybdenum (tonnes) 521 464 454 410 321 1,185 1,882
Sales
Payable copper ('000 tonnes) 30.7 32.7 39.7 42.7 24.1 106.5 90.6
Payable zinc (tonnes) 13,464 18,174 15,519 17,874 16,062 49,455 35,704
Payable silver ('000 ounces) 1,114 896 849 1,101 772 2,722 2,887
Payable lead (tonnes) 200 48 330 276 115 721 430
Payable molybdenum (tonnes) 669 488 536 381 371 1,288 1,809
Cannington, Australia
Material mined ('000 tonnes) 756 880 717 817 810 2,344 2,353
Ore milled ('000 tonnes) 778 845 773 793 713 2,279 2,492
Average head grades
- Silver (g/t) 367 417 355 317 364 345 356
- Lead (%) 8.0% 8.6% 7.6% 7.0% 7.7% 7.4% 8.3%
- Zinc (%) 2.7% 2.5% 2.5% 2.9% 2.7% 2.7% 2.8%
Production
Payable silver ('000 ounces) 7,836 9,757 7,689 6,949 7,323 21,961 24,451
Payable lead (tonnes) 53,412 63,334 51,923 45,937 48,899 146,759 175,756
Payable zinc (tonnes) 12,904 12,540 11,408 13,622 11,045 36,075 42,137
Sales
Payable silver ('000 ounces) 7,081 10,784 8,506 6,694 7,265 22,465 22,475
Payable lead (tonnes) 49,027 73,400 59,042 46,319 48,661 154,022 163,942
Payable zinc (tonnes) 10,780 14,399 10,379 16,321 9,439 36,139 40,592
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 8
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
BASE METALS
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.
Olympic Dam, Australia
Material mined (a) ('000 tonnes) 2,389 2,629 2,226 2,123 2,448 6,797 7,372
Ore milled ('000 tonnes) 2,195 2,475 2,471 2,435 2,353 7,259 7,106
Average copper grade (%) 2.01% 1.86% 1.90% 1.71% 1.73% 1.78% 2.02%
Average uranium grade (kg/t) 0.57 0.55 0.54 0.51 0.50 0.52 0.54
Production
Copper cathode (ER) ('000 tonnes) 45.2 46.0 34.0 30.4 44.7 109.1 134.3
Copper cathode (EW) ('000 tonnes) 2.6 3.8 3.0 3.2 3.0 9.2 8.5
Uranium oxide concentrate (tonnes) 896 1,080 1,042 1,014 933 2,989 2,805
Refined gold (fine ounces) 31,952 27,752 23,017 24,215 27,531 74,763 90,093
Refined silver ('000 ounces) 228 251 207 193 214 614 656
Sales
Copper cathode (ER) ('000 tonnes) 44.4 47.8 35.1 33.2 40.1 108.4 132.5
Copper cathode (EW) ('000 tonnes) 3.0 3.1 3.4 2.7 3.1 9.2 9.0
Uranium oxide concentrate (tonnes) 640 1,252 615 1,343 816 2,774 2,676
Refined gold (fine ounces) 36,832 29,257 20,949 25,227 24,678 70,854 90,138
Refined silver ('000 ounces) 268 200 265 169 211 645 712
(a) Material mined refers to run of mine ore mined and hoisted.
Pinto Valley, US (a)
Production
Payable copper ('000 tonnes) - - - 0.5 5.3 5.8 -
Copper cathode (EW) ('000 tonnes) 1.4 1.2 1.2 1.2 1.2 3.6 4.2
Payable silver ('000 ounces) - - - - 11 11 -
Sales
Payable copper ('000 tonnes) - - - - 2.6 2.6 -
Copper cathode (EW) ('000 tonnes) 1.2 1.2 1.2 1.2 1.1 3.5 4.1
Payable silver ('000 ounces) - - - - 11 11 -
(a) Mining operations at Pinto Valley were restarted during the December 2012 quarter.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 9
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2 012 2012 2012 2012 2013 2013 2012
DIAMONDS AND SPECIALTY PRODUCTS
BHP Billiton attributable production and sales unless otherwise stated.
DIAMONDS
EKATI™, Canada (a)
Ore Processed (100%) ('000 tonnes) 1,001 1,214 1,042 982 954 2,978 3,268
Production ('000 carats) 433 413 313 295 322 930 1,371
(a) On 10 April 2013 BHP Billiton completed the sale of its diamonds business, comprising its interests in the EKATI Diamond Mine
and Diamonds Marketing operations.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 10
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
IRON ORE
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
IRON ORE (a)
Pilbara, Australia
Production
Newman (b) 11,789 13,132 11,752 12,809 13,028 37,589 38,194
Goldsworthy Joint Venture 37 143 432 378 296 1,106 625
Area C Joint Venture 10,343 11,166 10,937 10,245 10,983 32,165 31,259
Yandi Joint Venture 13,063 13,595 13,771 15,954 13,302 43,027 39,941
Total (BHP Billiton share) 35,232 38,036 36,892 39,386 37,609 113,887 110,019
Total production (100%) 41,449 44,748 43,403 46,337 44,245 133,985 129,434
Sales
Lump 8,235 9,100 8,338 9,806 9,339 27,483 24,679
Fines 26,523 28,870 28,718 30,479 28,370 87,567 84,240
Total (BHP Billiton share) 34,758 37,970 37,056 40,285 37,709 115,050 108,919
Total sales (100%) 40,892 44,670 43,595 47,393 44,363 135,351 128,140
Samarco, Brazil
Production 2,711 2,855 2,880 2,804 2,596 8,280 8,568
Sales 2,453 2,778 2,622 3,227 2,515 8,364 8,340
(a) Iron ore production and sales are reported on a wet tonnes basis.
(b) Newman includes Mt Newman Joint Venture and Jimblebar.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 11
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
MANGANESE
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
MANGANESE ORE
South Africa (a)
Saleable production 917 989 858 834 859 2,551 2,636
Sales 871 866 878 808 835 2,521 2,585
Australia (a)
Saleable production 1,123 1,077 1,288 1,283 1,149 3,720 3,229
Sales 1,115 1,343 1,171 979 1,326 3,476 3,085
MANGANESE ALLOY
South Africa (a) (b)
Saleable production 81 75 93 91 86 270 329
Sales 122 104 74 112 89 275 355
Australia (a)
Saleable production 57 - 37 62 57 156 198
Sales 57 23 46 52 68 166 206
(a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(b) Production includes Medium Carbon Ferro Manganese.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 12
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
METALLURGICAL COAL
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
METALLURGICAL COAL (a)
Queensland, Australia
Production
BMA
Blackwater 955 991 1,148 1,588 1,157 3,893 3,444
Goonyella 1,153 1,012 1,535 1,392 1,478 4,405 3,991
Peak Downs 788 783 1,029 1,151 1,225 3,405 2,751
Saraji 627 724 773 994 711 2,478 2,329
Norwich Park (b) 248 193 - - - - 982
Gregory Joint Venture (c) 455 402 697 315 657 1,669 1,009
Daunia (d) - - - - 99 99 -
BMA total 4,226 4,105 5,182 5,440 5,327 15,949 14,506
BHP Mitsui Coal (e)
South Walker Creek 1,040 1,034 1,084 864 1,188 3,136 3,047
Poitrel 609 627 682 725 674 2,081 1,985
BHP Mitsui Coal total 1,649 1,661 1,766 1,589 1,862 5,217 5,032
Queensland total 5,875 5,766 6,948 7,029 7,189 21,166 19,538
Sales
Coking coal 4,522 4,007 4,058 5,561 4,933 14,552 14,433
Weak coking coal 1,595 1,512 1,545 1,820 2,029 5,394 5,033
Thermal coal 111 90 239 237 75 551 307
Total 6,228 5,609 5,842 7,618 7,037 20,497 19,773
Illawarra, Australia
Production 1,462 2,343 1,990 1,859 1,777 5,626 5,583
Sales
Coking coal 1,460 1,845 1,775 1,785 1,595 5,155 4,388
Thermal coal 219 279 502 327 145 974 819
Total 1,679 2,124 2,277 2,112 1,740 6,129 5,207
(a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(b) Norwich Park ceased production on 11 May 2012.
(c) Gregory open-cut ceased production on 10 October 2012.
(d) Daunia project achieved first production in the March 2013 quarter.
(e) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 13
PRODUCTION AND SALES REPORT
QUARTER ENDED YEAR TO DATE
MAR JUN SEP DEC MAR MAR MAR
2012 2012 2012 2012 2013 2013 2012
ENERGY COAL
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
South Africa
Production 7,895 8,313 8,454 7,969 7,302 23,725 24,966
Sales
Export 3,807 3,314 3,385 3,583 3,604 10,572 10,792
Local utility 4,397 4,571 4,869 4,615 4,171 13,655 14,601
Inland 124 74 38 28 32 98 374
Total 8,328 7,959 8,292 8,226 7,807 24,325 25,767
New Mexico, US
Production
Navajo Coal 1,913 1,853 1,804 1,377 1,840 5,021 5,151
San Juan Coal 196 820 2,067 1,421 995 4,483 1,588
Total 2,109 2,673 3,871 2,798 2,835 9,504 6,739
Sales - local utility 3,057 2,773 3,420 3,265 3,275 9,960 9,795
NSW Energy Coal, Australia
Production 4,291 4,393 4,453 4,827 3,837 13,117 12,364
Sales
Export 3,160 4,388 4,488 4,187 4,505 13,180 10,249
Inland 297 404 250 265 174 689 1,255
Total 3,457 4,792 4,738 4,452 4,679 13,869 11,504
Cerrejon Coal, Colombia
Production 2,953 3,105 2,829 2,662 1,512 7,003 8,558
Sales - export 2,652 2,942 2,630 2,702 1,774 7,106 8,337
BHP Billiton Production Report for the nine months ended 31 March 2013 Page 14
Date: 17/04/2013 07:26:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE').
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct,
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
information disseminated through SENS.