SOUTHERN PALLADIUM LIMITED - Quarterly Activities Report for 31 December 2023

Release Date: 29/01/2024 11:43
Code(s): SDL     PDF:  
Wrap Text
Quarterly Activities Report for 31 December 2023

Southern Palladium Limited
Incorporated in the Commonwealth of Australia
Australian Company Number 646 391 899
ASX share code: SPD
JSE share code: SDL
ISIN AU0000220808


29 January 2024
                                           Quarterly Activities Report for 31 December 2023
ASX:SPD, JSE:SDL
                                           DECEMBER QUARTER HIGHLIGHTS
ACN: 646 399 891
                                           Operational:
                                       •   Mineral Resource Upgrade, increasing the total UG2 and Merensky Reef
Corporate Directory
                                           (MR) Mineral Resource ounces (Indicated and Inferred) to 26.22 Moz (6PGE
                                           + Au or 7E).
Chairman
Roger Baxter                           •   The UG2 Indicated Mineral Resource for the Bengwenyama project doubles
                                           to 5.40 Moz (4E) or 6.52 Moz (7E) at a grade of 8.08 g/t and 9.75 g/t
Managing Director                          respectively. Total UG2 Mineral Resource ounces (Indicated and Inferred) at
Johan Odendaal                             12.99 Moz (4E) and 15.72 Moz(7E).

                                       •   Formal notification from the Department of Mineral Resources and Energy
Non-Exe cutive Directors                   (DMRE) received, confirming the acceptance of Southern Palladium's Mining
Mike Stirzaker                              Right application.                                          
Rob Thomson
Daan van Heerden                       •   Geotechnical Study commissioned by independent consulting group, OHMS,
Geoff Hiller                               which confirmed the suitability of established mining methods and mine
                                           design parameters that are consistent with existing PGM production mines
Company Secretary                          in the Bushveld Complex.
Andrew Cooke
                                       •   Metallurgical testing results indicated that Ore from the UG2 reef can be
Top 5 Shareholders                         treated with recovery rates of between 80% to 85% with conventional
                                           extraction methods that are used across the Bushveld Complex – a key step
Nicholas Daniel Resources Pty ltd          in the project's development from exploration to mine development.
Nurinox Investments Pty Ltd
Robert Keith                           •   Mineral resource upgrade, confirmation of mine design parameters and
Legacy Platinum Corporation                metallurgical test results will form part of an updated Scoping Study, which
Regal Partners                             is now underway.

                                       •   Drill program remains ongoing post quarter-end, with a focus on infill drilling
Company Overview                           to convert additional resources from Inferred to Indicated.
                                           
                                           Corporate:
Dual-listed platinum group metal       •   Mr Roger Baxter appointed as Non-Executive Chairman, effective 1 January 2024.
(PGM) company developing the                                          
advanced Bengwenyama PGM
project, particularly rich in          •   As at 31 December 2023, Southern Palladium held approximately $8.34
palladium/rhodium, located in South        million (30 September 2023: $9.98 million) in cash. This figure excludes cash
Africa's prolific Bushveld Complex.        held by the Company's 70% subsidiary, Miracle Upon Miracle Investments
                                           (Pty) Limited at 31 December 2023 of $0.566 million (30 September 2023:
Contact:                                   $0.632 million).
                                  
E: info@southernpalladium.com
W: www.southernpalladium.com

Southern Palladium (ASX: SPD, "Southern Palladium" or the "Company") is pleased to announce its quarterly activities
summary for the three months ended December 31, 2023.

The Company's primary focus during the quarter was the ongoing advancement of its exploration programme at the
Bengwenyama PGM (platinum group metals) project, in which it holds a direct 70% stake.

Southern Palladium remains well-funded to continue its exploration programme at Bengwenyama and complete its Pre-
feasibility study. After successful wider spaced drilling earlier in 2023, Q4 2023 saw the conversion of Inferred Mineral
Resources to Indicated Mineral Resources in the shallower areas of the orebody, along with the establishment of mine design
parameters and the confirmation of processing recoveries. These results will inform the upcoming Scoping Study and Pre -
Feasibility Study as the Company transitions from exploration to development.

Overview of December Quarter Activities

PFS drill programme

The planned conversion of the shallow eastern portion of the Eerstegeluk UG2 Reef to an Indicated Mineral Resource has
resulted in a second Mineral Resource update for the UG2 Reef (refer ASX Announcement 7 December 2023). The UG2
Indicated Mineral Resource has increased by 104% to 5.40 Moz at a 3PGE + Au (4E) grade of 8.08 g/t and 6.52 Moz at a 6PGE
+ Au grade (7E) of 9.75 g/t.

The latest drilling focused on the conversion of the UG2 Inferred Mineral Resources to Indicated Mineral Resources in the
south-east portion of the Eerstegeluk farm (refer Figure 3). The total Mineral Resource (Indicated and Inferred) for the UG2
Reef has seen an increase of 7.9% from 12.04 Moz to 12.99 Moz (4E). The Merensky Reef is largely unchanged.

Table 1 in Appendix 2 shows the consolidated UG2 Mineral Resource as at 1 December 2023. Consistent with the previous
Mineral Resource update (refer ASX Announcement 30 May 2023), geological losses have been applied and the resource is
declared at a pay limit of 1.9 g/t using a 4E basket price of US$2,654/oz. Importantly, no Mineral Resource falls below the
pay limit. It is envisaged that the resource mining cut will be around 1 metre based on the observation that chromitite
stringers are commonly absent in the drilled area, and by comparison with other mines in the area. The full mining width will
be determined as part of future mining studies and will incorporate dilution by low or nil grade hanging wall and footwall
dilution.

The combined Indicated Mineral Resource for the project, on a 7E basis, is now 8.43 Moz ounces with a combined Inferred
Mineral Resource of 17.80 Moz. The total Mineral Resource (Indicated and Inferred) for both Reefs is now 26.22 Moz. These
Mineral Resources include 15.72Moz indicated and inferred for the UG2 reef.

UG2 Mineral Resource Estimation

The UG2 geological and estimation models have been updated to include drilling and assaying data as at end of October
2023. The estimation model utilised 59 drillholes with complete UG2 intersections (Figure 1). The Mineral Resource was
estimated using Ordinary Kriging. Figure 1 shows the 4E g/t resultant model with the drillhole positions used in the estimation.
No capping was applied to the estimation and the kriging neighbourhood analysis (KNA) recommended a block size of 350m
with a minimum and maximum number of samples of 5 and 15 respectively for the first search volume. Three search volumes
with decreasing samples were used for the estimation. All elements (Pt, Pd, Rh, Au, Ir, Os, Ru, Cu, Ni, Cr and Fe) were
estimated individually as well as a combined 4E (Pt, Pd, Rh & Au) and 7E (Pt, Pd, Rh, Ir, Os, Ru & Au). The average 4E prill splits
for Pt:Pd:Rh:Au of 45.5% : 43.6% : 9.5% : 1.4% were determined using these estimates. The Cr:Fe ratio of the UG2 chromitite
horizon, from modelled Cr and Fe analysis, is 1.21. A density of 3.93 t/m3 was used in the tonnage estimate.

There has been an increase in the average grade of the project, due to the additional reef intersections obtained during the
recent drilling. This resource estimate is based on 59 drillhole intersections compared to the 34 drillhole intersections in the
previous estimate. The arithmetic mean of the 4E and 7E grades increased from 7.71 g/t to 8.20 g/t and from 9.35 g/t to 9.88
g/t respectively. This grade increase has translated into the resource model. The areas of higher grade can be seen in the
area around the edge of the dome structure in the southeast (see Figure 1).

                                                                                                                          
Figure 1: Modelled 3PGE+Au g/t Plot of the UG2 Reef


The UG2 structures are now also better understood with the updated 3D structural model for the UG2 (Figure 2) being
utilised for the scoping study. The overall geological losses applied to the Indicated and Inferred Mineral Resources for the
UG2 are now 21% and 24% respectively.


Figure 2: Oblique View of the 3D Structural Model of the UG2 Reef


Mineral Resource Categories

The Mineral Resource categories (Figure 3) were determined based on the QAQC, slope of regression (SOR), kriging efficiency
(KE) and continuity of the UG2 Reef horizon. These are measures in the confidence of the kriged estimation. The Exploration
Target Range is extrapolated from the boundary of the inferred Mineral Resource to the project perimeter.

                                                                                                                    
Figure 3: UG2 Mineral Resource Categories


Ongoing drill programme

The initial payback area (Figure 1) in the shallow portion of Eerstegeluk has successfully been converted to Indicated Mineral
Resources. The drilling focus now turns to the North Horst Block (Figure 3) to convert the Inferred Mineral Resource and
Exploration Target to Indicated Mineral Resources for the forthcoming PFS. Infill drilling will continue in the eastern porti on
of Eerstegeluk to continually filling gaps. To date 23,347m have been completed, which is comprised of 67 completed
drillholes and 29 deflections (Figure 4).
                                            

Figure 4: Completed and Current Drillholes

                                                                                                                      
Project Studies

Updated Scoping Study

The updated Scoping Study is now well underway with its release in January/February 2024. This study is being conducted
concurrently with the Prefeasibility Study and will showcase the project's key metrics, including net present value (NPV), co st
estimation, and annual production figures. The Scoping Study will include results from recent metallurgical test work, which
showed potential 4E PGM recovery rates from the UG2 reef of between 80 and 85% with concentrate grades of 130 to 250g/t
(4E) (refer ASX Announcement 6 December 2023).

Geotechnical Study Establishes Mine Design Parameters

The findings of the geotechnical study conducted by the independent consulting firm Open House Management Solutions
(OHMS) has yielded promising results, confirming the viability of both conventional and mechanised underground mining
from a geotechnical perspective. The study's conclusions are reassuring. It indicates that mining operations at depths
exceeding 50 metres underground do not pose a threat to surface infrastructure. Our proposed conventional stope layout is
estimated to result in a mining extraction rate ranging from 91% near surface to 78%, contingent upon the depth below the
surface.

All parameters are in line with existing Bushveld UG2 operations. It is also worth highlighting that our consultants have not ed
the absence of chromite stringers in the hanging wall of the UG2. Due to the absence of these stringers, which in other
Bushveld operations can lead to dilution, we anticipate a potential minimum stope width of approximately 1 metre, based
on an average UG2 reef width of about 70 cm.

OHMS was engaged to conduct a geotechnical study for the Bengwenyama PGM project. The primary purpose of the study
was to confirm the minimum allowable depth for commencing mining activities and to determine the optimal pillar layout
for various mining methods.

The Bengwenyama project is designed as an underground mine with an initial focus on the UG2 Reef. The geotechnical study
has established that there are two viable mining options: one involving conventional mining with a 1 -metre mining width and
the other employing a mechanized mining approach with a mining width of up to 2.0 metres. The choice between these
methods will be influenced by factors such as financial feasibility and practicality.

UG2 Chromitite Reef Width

The representative UG2 drillhole intersection widths to date range from about 43cm to 136cm with an average width of 69
cm. At this stage, indications are that there are limited areas that have chromite stringers in the hanging wall of the UG2,
which so far are located in a small, localised area in the northeastern part of Eerstegeluk.

The majority of the UG2 intersections have a leuconorite parting plain (LPP) as the hanging wall contact between the hanging
wall pyroxenite and the UG2 reef. The footwall contact of the UG2 is either a sharp or gradational contact between the UG2
reef and the pegmatoidal or poikilitic pyroxenite.

In the case of the gradational contact there is disseminated chromite within the pyroxenite resulting in the immediate
footwall being mineralised and carrying low PGM grades. It is estimated that the footwall dilution will carry a grade of
between 0.3 g/t and 0.5 g/t. Since the project area has the LPP as the hanging wall contact the hanging wall dilution should
be minimal and the minimum stoping width dilution will come from the low-grade footwall pyroxenite.

Indications are that the minimum stope width could be around 1m based on the average UG2 Reef width of approximately
70 cm and the absence of the chromite stringers.
 
                                                                                                                     
Figure 5: Generalised UG2 Profile and Potential Mining Cut


Based on the test work conducted above, OHMS were able to draw the following conclusions:

Geotechnical test work results

    •  Core analysis indicates that there are no reef parallel structures present within 6m of the top of reef contact, leading
       to the conclusion that the UG2 should have a strong hang wall.
    •  The results of the test work and the core logging were used to produce rock mass classifications for the various
       lithologies. The classification yielded similar results for the UG2, footwall and hanging wall. The Rock Mass Rating
       values ranged between 82 and 84 and is considered a good rating.

Geotechnical test work conclusions
    •  A beam thickness of 6m can be considered above the stoped-out areas.
    •  The analysis indicates that the originally planned 20m wide conventional stopes are expected to be stable, given the
       newly available rock mass characteristics. Moreover, the results indicate that, even with conservative input
       parameters, it is anticipated that a stope with a 25m span on dip and with a stope length of 100 m on strike, should
       be stable.
    •  The mining extraction rate for conventional mining will range from 91% down to 180m deep and reduces gradually
       to 78% at a depth of 540m.
    •  The mining extraction rate for mechanised bord and pillar mining will range from 82% down to 240m deep that
       reduces gradually to 67% at a depth of 540m with pillar dimensions changing to 8x10m.

Geotechnical test work recommendations.
    •   The recommended lay-out for conventional stoping includes gully pillars of 6m x 4m with 5m holings and the panel
        face length of 20m. In-stope roof-bolting is recommended with a spacing at a 1.5 m x 1.5 m elongate pattern Hydra-
        bolts of 1.2m length is recommended for the gullies and raises, spaced 1.0 m apart to a 2-1-2 pattern. The
        recommended conventional development support pattern is 1.2m long, 26mm diameter hydra-bolts, tensioned and
        spaced 1.0 m apart to a 2-1-2 pattern.
    •   The recommended bord and pillar mechanised layout of 8m bords and 6m pillars and 1.5 m full column grouted
        resin bolts spaced 1.5m on average for bords and for primary development ends.
    •   Long high-capacity support such as 4.5 m long cable anchors is recommended at large excavation intersections, and
        in areas where these low-angled structures are intersected. It is recommended that it should be planned that at
        least 10% of the workings will require additional long anchor support.
    •   For the assumed charge, the empirical analysis indicates that mining should not be conducted closer than 50 linear
        metres below surface structures.

                                                                                                                                                                          6
Metallurgical testing shows potential PGM recoveries of 85%

Significant progress has been achieved in understanding the metallurgy of the UG2 orebody. Preliminary testing suggests
that ore from the UG2 Reef can be effectively treated with recoveries ranging from 80% to 85% through conventional
methods that are used across the Bushveld Complex, and therefore aligning with industry. Metallurgical recoveries from the
UG2 Reef at operations on the Eastern Limb range between 81% and 88%.

Metallurgical testing

The sample for test work was composited from a total mass of approximately 32kg (4E head grade obtained ~7.95g/t 4E),
from various boreholes that intersected the UG2 reef of the Bengwenyama project. This sample was tested by Suntech
Geomet Laboratories, an ISO/IEC compliant facility based in Johannesburg. This test work has demonstrated that high PGM
concentrate grades can be obtained at recoveries of over 80% (see Figure 6 – red dot indicates the test result, i.e., 80.5%
recovery at a 4E concentrate grade of 238 g/t). The testwork was a locked cycle test over six cycles. The graphed data is the
final concentrate (red dot) and the final residue PGM contained in each waste str eam (other four data points).


Figure 6: Concentrate grade vs. recovery (4E)


Source: Suntech Geomatics Test Report


These recoveries are in line with those reported by various UG2 operations on the Eastern Limb:

• Anglo American Platinum – Mototolo 84% and Modikwa 87%; and;
• Implats – Marula 86%-88% and Two Rivers 81%.

In addition to strong PGM recoveries, a marketable chromite concentrate can also be produced using conventional spirals
and sold separately.

Initial mining at the Bengwenyama project will focus on the underground extraction of PGM's from the high grade UG2
Chromitite Reef. The current design for the planned process plant is based on a conventional MF2 flow sheet consisting of
primary and secondary milling and flotation , with a processing route to obtain a flotation concentrate which contains a
marketable content of 7E PGM.

As more representative samples of the UG2 Reef becomes available, further test work will be undertaken to increase
confidence in the process flowsheet and make improvements to both recovery and grade of the 7E PGM content from the
UG2 reef.

Environmental, Social and Governance

Submission of Mining Right Application

On September 29, 2023, Southern Palladium officially submitted its application for a Mining Right (refer ASX Announcement
2 October 2023).
                                                                                                                    
On 17 October 2023, the company received notification from the Department of Mineral Resource and Energy (DMRE) that
its application for the Mining Right has been accepted. This approval confirms that Southern Palladium can now initiate
comprehensive expert studies and consultations which will pave the way for a decision by the Department of Mineral
Resources and Energy (DMRE) by late 2024/early 2025.

Engaging with the Community

Southern Palladium works closely with the community, actively promoting inclusivity and project awareness. Ethical inclusion
extends to fair representation via Royal Family, Traditional Council and other Community representatives. Weekly exploration
meetings are held virtually with the two Community representatives, together with the environmental and exploration
management consulting firm contracted to the project. Quarterly meetings are held with extended representation from the
greater Royal Family, Traditional Council and community representatives.

To further communicate the Company's activities to community members, Southern Palladium launched a new Facebook
page: (https://www.facebook.com/SouthernPalladium).

This platform serves as a means to share updates, news, and relevant information with the community in a more accessible
and real-time manner.

Additionally, our first Newsletter was published and printed in July 2023 for distribution within the Community and
surrounding Areas. The Newspaper was well received and will be published on a Bi -annual basis. An electronic copy of the
December 2023 issue is available on the Southern palladium website: https://www.southernpalladium.com/site/ne ws -
insights/media

Health And Safety

Southern Palladium is committed to upholding high standards of employee and workplace health and safety. Exploration
activities at Bengwenyama are conducted in compliance with all regulations including the South African Mine Health and
Safety Act (29 of 1996). A comprehensive safety file, emergency response plan, policies and code s of practice are
implemented, incorporating key guidelines published by the Chamber of Mines. Legal appointments are made in terms of
policies and Mine Health and Safety regulations.

Health and safety inductions are held for all new persons arriving on site at the Bengwenyama project. Daily safety meetings
are held, and a working incident reporting and management system is established. The use of PPE is enforced, and provision
is made for such equipment to all persons.

March Quarter Planned Activities

Drilling activities at the Bengwenyama Project will continue throughout the March 2024 quarter. The focus of the drilling has
been narrowed down to infill drilling over the shallow eastern portion of the UG2 block and Northern part of the Horst Block,
continuing the conversion of inferred resources to indicated category.

The company aims to deliver its Updated Scoping Study during January/February 2024.

The Southern Horst Block currently lacks extensive geological structure information. Consequently, the decision has been
made to temporarily redirect drilling efforts to the Northern Horst Block, where the reef has already been intersected. The
goal is to convert inferred data to indicated in the northern region. Drilling activities will resume in the Southern Horst Block
once a more comprehensive understanding of its geological features is acquired.

Corporate

Appointment of Mr Roger Baxter as Non-Executive Chairman

Mr Roger Baxter was appointed as Non-Executive Chairman of the Board, commencing on 1 January 2024.

Roger was the Chief Executive Officer of the Minerals Council South Africa for over 8 years from May 2015. He recently retire d
from this position. In that role he played a key part in guiding the South African mining sector to achieve an improved safet y
record with a significant focus on the implementation of mine site solutions based on the adoption of leading global safety
practices. Roger also led the complete brand rejuvenation, reputation enhancement and modernisation of the Mineral Council
into becoming a much more effective, strategically driven, agile, assertive and capable organisation.
                                                                                                                       
Roger was awarded the "2020 Mining Thought Leader of the Year" by the Mining Review Africa journal and has also been listed
in MiningMX's "100 most influential people in Africa's mining" sector.

Roger is the founding Chairman of the World Platinum Investment Council – a position he continues to hold. He is also
immediate past President of the Mining Industry Association of Southern Africa (2019 – 2022) and the immediate past
Chairman of the Associations Coordinating Group of the International Council of Mining and Metals (2020 – 2022). Roger holds
a Bachelor of Commerce (Honours) from the University of Natal in South Africa.

Expenditure Summary

A summary of the exploration and project evaluation expenditures for the quarter is provided as follows:

For the purpose of ASX Listing Rule 5.3.1, payments for exploration, evaluation and development during the quarter totalled
$1,267,000 (30 September 2023: $1,054,000). The Phase 1a and Phase 1b drilling programme, facilities set up and details of
activities undertaken during the quarter are as described in this report.

For the purpose of ASX Listing Rule 5.3.2, the Company confirms there were no mining production and development activities
undertaken during the quarter.

For the purpose of ASX Listing Rule 5.3.5, payments to directors of Southern Palladium Limited during the quarter totalled
$120,000. The payments were in respect of directors' salaries, fees and superannuation.

Payment to Minxcon Pty Ltd, a related party of two of the Company's Directors, Johan Odendaal and Daan van Heerden during
the quarter totalled approximately $530,000. The payments were in respect of expenses incurred for management of the
Bengwenyama Project.

Payment to Miracle Upon Miracle Investments (Pty) Limited, a related party of Southern Palladium Limited during the quarter
totalled approximately $1,450,000. The payments were in respect of expenses incurred for the Bengwenyama Project and
corporate expenses.

Pursuant to ASX Listing Rule 5.3.4, the Company provides its actual expenditure on the individual items in the two year "use of
funds" statement in its IPO Prospectus since the date of its admission to ASX's Official List (being 8 June 2022) against the
estimated expenditure on those items and an explanation of any differences.

 Use of Funds                           Prospectus: Estimated       Actual use from 8 June 2022             Variance
                                             Expenditure                   to quarter end
           Phase 1 drilling                   $7,716,000                     $5,779,095                    $1,936,905
           Phase 2 drilling                   $3,805,000                         $0                        $3,805,000
 Other technical work on the Project          $1,677,000                      $392,641                     $1,284,359
  Corporate and other related costs           $3,918,000                     $2,716,637                    $1,201,363
          Costs of the Offer                  $1,737,000                     $1,406,949                     $330,051
                Total                        $18,853,000                    $10,295,322                    $8,557,678

The variances are a result of the Company being admitted to the Official List on 8 June 2022, therefore actual expenditure up
to 31 December 2023 is represented against the two year "use of funds" statement. The Company believes it is on schedule to
achieve its objectives as stated in its IPO Prospectus.

Cash

As at 31 December 2023, Southern Palladium held approximately $8.34 million (30 September 2023: $9.98 million) in cash.
This figure excludes cash held by the Company's related party, Miracle Upon Miracle Investments (Pty) Limited at 31 December
2023 of $0.566 million (30 September 2023: $0.632 million).
                                                                                                                   
December 2023 Quarter – ASX Announcements

This Quarterly Activities Report contains information extracted from ASX market announcements reported in accordance with
the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" ("2012
JORC Code"). Further details can be found in the following announcements lodged on the ASX :

2-Oct-2023                      Bengwenyama Project Mining Right Application Submitted
10-Oct-2023                     Bengwenyama drilling update
23-Oct-2023                     Geotechnical Study Establishes Mine Design Parameters
28-Nov-2023                     Appointment of Mr Roger Baxter as Non-Executive Chairman
7-Dec-2023                      Metallurgical testing shows potential PGM recoveries of 85%
7-Dec-2023                      UG2 Indicated Mineral Resource doubles to 6.52 Moz (7E)


JORC Competent Persons Statement

Uwe Engelmann
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is
based on information compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08,
FGSSA). Mr Engelmann is a director of Minxcon (Pty) Ltd and a member of the South African Council for Natural Scientific
Professions. Minxcon provides geological consulting services to Southern Palladium Limited. Mr. Eng elmann has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Repo rting of
Exploration Results, Mineral Resources and Ore Reserves'. Mr. Engelmann consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears. Mr Engelmann has a beneficial interest in
Southern Palladium through a shareholding in Nicolas Daniel Resources Proprietary Limited.

Daan van Heerden
The scientific and technical information contained in this announcement has been reviewed, prepared, and approved by Mr
Daan van Heerden (B Eng (Min.), MCom (Bus.Admin.), MMC, Pr.Eng. No. 20050318, AMMSA, FSAIMM). Mr van Heerden is
a director of Minxcon (Pty) Ltd and a Registered Professional Engineer with the Engineering Council of South Africa, a
Member of the Association of Mine Managers South African Council, as well as a Fellow Member of the South African
Institute of Mining and Metallurgy. Mr. van Heerden has sufficient experience relevant to the styles of mineralisation and
activities being undertaken to qualify as a Competent Person, as such term is defined in the 2012 Edition of the
'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr van Heerden has a
beneficial interest in Southern Palladium through a shareholding in Nicolas Daniel Resources Proprietary Limited.

For further information, please contact:

Johan Odendaal
Managing Director
Southern Palladium
Phone: +27 82 557 6088
Email: johan.odendaal@southernpalladium.com

JSE Sponsor
Merchantec Capital

Media & investor relations inquiries: Sam Jacobs, Six Degrees Investor Relations: +61 423 755 909

                                                                                                                    
Appendix 1

Tenements

The Company held the following tenement during the quarter. The Project comprises the full extent of the farms
Nooitverwacht 324 KT and Eerstegeluk 327 KT, both of which are in the Limpopo Province of South Africa. The Project is
located 250 km east-northeast of Pretoria. The Exploration tenement is 100% held through Miracle Upon Miracle (Pty) Ltd
the 70% subsidiary of SPD.

The Company did not enter into any farm-in or farm-out agreements during the quarter.

The following information is provided pursuant to Listing Rule 5.3.3 for the quarter:

                                       Prospecting Right   Prospecting Right       Interest at beginning   Interest at end of
Farm name               Extent (ha)    number              expiry date             of quarter              quarter
                                                                   
Nooitverwacht 324 KT        2,971.01
Eerstegeluk 327 KT          2,308.73   LP30/5/1/1002PPR          12-Feb-24                  70%                   70%
Total                       5,279.74

No tenement has been disposed during the quarter.

                                                                                                                       
Appendix 2

Mineral Resource

The total combined Mineral Resource for the UG2 and MR as at 1 December 2023 is summarised in Error! Reference source n
ot found.. The combined Indicated Mineral Resource for the project, on a 7E basis, is 8.43 Moz ounces with a combined
Inferred Mineral Resource of 17.80 Moz. The total Mineral Resource (Indicated and Inferred) is 26.22 Moz. These Mineral
Resources include 15.72Moz indicated and inferred for the UG2 reef.

Table 1: Combined UG2 and MR Mineral Resource Estimate as at 1 December 2023

              Resource     Tonnes    Thickness    Pt     Pd      Rh      Au       Ir     Os      Ru      4E      7E       Cu      Ni     Moz     Moz
  Reef
              Category     Mt          (m)      (g/t)   (g/t)   (g/t)   (g/t)   (g/t)   (g/t)   (g/t)   (g/t)   (g/t)    (%)     (%)     (4E)    (7E)
Merensky     Indicated     21.59       2.05      1.59    0.65    0.10    0.12    0.03    0.03    0.21    2.48    2.75    0.038   0.125   1.72    1.91
Merensky     Inferred      77.90       1.97      2.01    0.81    0.13    0.15    0.04    0.04    0.25    3.10    3.43    0.035   0.119   7.77    8.60
  Total                    99.49       1.99      1.92    0.78    0.12    0.14    0.04    0.04    0.24    2.97    3.28    0.035   0.120   9.49   10.50
  UG2        Indicated     20.80       0.73      3.60    3.61    0.75    0.12    0.25    0.17    1.24    8.08    9.75    0.033   0.162   5.40    6.52
  UG2        Inferred      29.99       0.74      3.63    3.37    0.77    0.10    0.26    0.17    1.25    7.87    9.54    0.038   0.165   7.58    9.20
  Total                    50.79       0.73      3.62    3.47    0.76    0.11    0.26    0.17    1.25    7.95    9.63    0.036   0.164  12.99   15.72
          Total            150.28      1.57      2.49    1.69    0.34    0.13    0.11    0.08    0.58    4.65    5.43    0.04    0.13   22.48   26.22

Note: All elements have been estimated individually and their combined grade will vary slightly from the estimated composite 4E and 7E modelled grades.


Platinum Group Minerals (PGMs) within the Bushveld Complex exhibit varying ratios (referred to as the Prill Split), with
platinum (Pt), palladium (Pd), and rhodium (Rh) constituting the predominant components. Additionally, other PGMs such as
ruthenium (Ru), iridium (Ir), and osmium (Os) are also present, although in smaller quantities. These ratios exhibit variations
from one section of the complex to another. Notably, the UG2 reef at the Bengwenyama project represents an even
distribution of Platinum and Palladium, accompanied by a notable concentration of Rhodium. Conversely, the Merensky Reef
is characterized by a high platinum content.

Figure 7: Platinum Group Metal + Gold Prill Split                Figure 8: Project Stratigraphic Column (E056 and E057)

                                                                                                                                         
Appendix 5B
Mining exploration entity or oil and gas exploration
entity
quarterly cash flow report


Name of entity
Southern Palladium Limited

ABN                                                                Quarter ended ("current quarter")
59 646 391 899                                                                  31-Dec-23


Consolidated statement of cash flows                                 Current         Year to date
                                                                     quarter         (6 months)
                                                                     $A'000            $A'000
1     Cash flows from operating activities
1.1   Receipts from customers                                            -                     -
1.2   Payments for
      (a) exploration & evaluation
      (b) development                                                    -                     -
      (c) production                                                     -
      (d) staffcosts                                                   (51)                  (82)
      (e) administration and corporate costs                           (219)                (532)
1.3   Dividends received (see note 3)
1.4   Interest received                                                 82                   154
1.5   Interest and other costs off inance paid 
1.6   Income taxes paid
1.7   Government grants and tax incentives
1.8   Other - Miracle Upon Miracle Pty Ltd operating expenditure       (250)                (464)
1.9   Net cash from / (used in) operating activities                   (438)                (924)


2     Cash flows from investing activities
2.1   Payments to acquire or for:
      (a) entities
      (b) tenements
      (c) property, plant and equipment
      (d) exploration & evaluation                                    (1,200)               (2,281)
      (e) investments
      (f) other non-current assets
2.2   Proceeds from the disposal of :
      (a) entities
      (b) tenements
      (c) property, plant and equipment
      (d) investments
      (e) other non-current assets
2.3   Cash flows from loans to MUM
2.4   Dividends received (see note 3)
2.5   Other                                                              -                     -
2.6   Net cash from / (used in) investing activities                  (1,200)               (2,281)


                                                                                                      
                                                                                                       Current             Year to date
Consolidated statement of cash flows                                                                   quarter             (6 months)
                                                                                                       $A'000                $A'000
3      Cash flows from financing activities
3.1    Proceeds from issues of equity securities (excluding convertible debt
       securities)
3.2    Proceeds from issue of convertible debt securities
3.3    Proceeds from exercise of options
3.4    Transaction costs related to issues of equity securities or convertible
       debt securities
3.5    Proceeds from borrowings
3.6    Repayment of borrowings
3.7    Transaction costs related to loans and borrowings
3.8    Dividends paid
3.9    Other
3.1    Net cash from / (used in) financing activities                                                       -                      -

4      Net increase / (decrease) in cash and cash equivalents for
       the period
4.1    Cash and cash equivalents at beginning of period                                                9,981                  11,548
4.2    Net cash from / (used in) operating activities (item 1.9 above)                                  (438)                   (924)
4.3    Net cash from / (used in) investing activities (item 2.6 above)                                (1,200)                 (2,281)
4.4    Net cash from / (used in) financing activities (item 3.10 above)                                  -                       -
4.5    Effect of movement in exchange rates on cash held
4.6    Cash and cash equivalents at end of period                                                      8,343*                  8,343*
       *NOTE: This figure excludes cash held by the Company's related party, Miracle Upon Miracle Investments
       (Pty) Limited at 31 December 2023 of $0.566 million (30 September 2023: $0.632 million).

5      Reconciliation of cash and cash equivalents                                                   Current               Previous
                                                                                                       quarter               quarter
       at the end of the quarter (as shown in the consolidated statement of
       cash flows) to the related items in the accounts                                               $A'000                 $A'000
5.1    Bank balances                                                                                   2,343                   481
5.2    Call deposits                                                                                   6,000                  9,500
5.3    Bank overdraf ts
5.4    Other (provide details)
5.5    Cash and cash equivalents at end of quarter (should equal
       item 4.6 above)                                                                                 8,343*                 9,981*
       
       * NOTE: This figure excludes cash held by the Company's related party, Miracle Upon Miracle Investments
       (Pty) Limited at 31 December 2023 of $0.566 million (30 September 2023: $0.632 million).

6      Payments to related parties of the entity and their                                                                   Current
       associates                                                                                                            quarter
                                                                                                                             $A'000
6.1    Aggregate amount of payments to related parties and their associates
       included in item 1                                                                                                       131
       
6.2    Aggregate amount of payments to related parties and their associates
       included in item 2                                                                                                       519
         
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such
payments.

A total approximately of $650,000 was paid to related parties of the entities and their associates as follow:
- $120,000 are in respect of Directors' fees, salaries and superannuation accruing to Directors' for services rendered during the period.
- $530,000 was paid to Minxcon Pty Ltd for project management of the Bengwenyama Project. Two of the Company's Directors, Johan
Odendaal and Daan van Heerden, are significant and controlling shareholders in Minxcon.

                                                                                                                                             
7     Financing facilities                                                                           Total facility              Amount
      Note: the term "facility' includes all forms of financing arrangements available to the         amount at                  drawn at
      entity.                                                                                        quarter end                quarter end
      Add notes as necessary for an understanding of the sources of finance available to the           $A'000                     $A'000
      entity.
7.1   Loan facilities
7.2   Credit standby arrangements
7.3   Other (please specify)
7.4
      Total financing facilities
                                                                                                     -                      -

7.5   Unused financing facilities available at quarter end
                                                                                                                            -
7.6   Include in the box below a description of each facility above, including the lender, interest rate, maturity date
      and whether it is secured or unsecured. If any additional financing facilities have been entered into or are
      proposed to be entered into after quarter end, include a note providing details of those facilities as well.




8     Estimated cash available for future operating activities                                                                    $A'000
8.1   Net cash from / (used in) operating activities (item 1.9)                                                                   (438)
8.2   (Payments for exploration & evaluation classified as investing
      activities) (item 2.1(d))                                                                                                   (1,200)    
8.3   Total relevant outgoings (item 8.1 + item 8.2)                                                                              (1,638)
8.4   Cash and cash equivalents at quarter end (item 4.6)                                                                          8,343
8.5   Unused finance facilities available at quarter end (item 7.5)                                                                -
8.6   Total available funding (item 8.4 + item 8.5)                                                                                8,343

8.7   Estimated quarters of funding available (item 8.6 divided by
      item 8.3)                                                                                                                      5
      Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as
      "N/A". Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8   If item 8.7 is less than 2 quarters, please provide answers to the f ollowing questions:
      8.8.1 Does the entity expect that it will continue to have the current level of net operating
      cash flows for the time being and, if not, why not?

      Answer: N/A


      8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
      cash to f und its operations and, if so, what are those steps and how likely does it believe
      that they will be successful?
      Answer: N/A


      8.8.3 Does the entity expect to be able to continue its operations and to meet its
      business objectives and, if so, on what basis?
      Answer: N/A

      Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.


                                                                                                                                           
Compliance statement

1       This statement has been prepared in accordance with accounting standards and policies which comply with
        Listing Rule 19.11A.

2       This statement gives a true and fair view of the matters disclosed.



Date:   29 January 2024



Authorised by: Audit Committee
(Name of body or officer authorising release – see note 4)


Notes
1       This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity's activities
        for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose
        additional information over and above the minimum required under the Listing Rules is encouraged to do so.

2       If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
        provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this
        report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to
        Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

3       Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on
        the accounting policy of the entity.

4       If this report has been authorised for release to the market by your board of directors, you can insert here: "By the board". If it has been
        authorised for release to the market by a committee of your board of directors, you can insert here: "By the [name of board committee –
        eg Audit and Risk Committee]". If it has been authorised for release to the market by a disclosure committee, you can insert here: "By
        the Disclosure Committee".

5       If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying
        with recommendation 4.2 of the ASX Corporate Governance Council's Corporate Governance Principles and Recommendations, the
        board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been
        properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows
        of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is
        operating effectively.




                                                                                                                                                

Date: 29-01-2024 11:43:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story