To view the PDF file, sign up for a MySharenet subscription.

SOUTH32 LIMITED - Hermosa Project Mineral Resource Estimate Update and Exploration Results

Release Date: 24/07/2023 08:00
Code(s): S32     PDF:  
Wrap Text
Hermosa Project – Mineral Resource Estimate Update
and Exploration Results

South32 Limited
(Incorporated in Australia under the Corporations Act 2001 (Cth))
(ACN 093 732 597)
ASX / LSE / JSE Share Code: S32; ADR: SOUHY
ISIN: AU000000S320
south32.net

                            HERMOSA PROJECT – MINERAL RESOURCE ESTIMATE UPDATE
                                         AND EXPLORATION RESULTS


South32 Limited (ASX, LSE, JSE: S32; ADR: SOUHY) (South32) reports an update to the Mineral Resource estimate for the Taylor
deposit, as well as Exploration Results for the Peake prospect, which form part of our 100% owned Hermosa Project located in
Arizona, USA (Annexure 1 – Figure 1).

The Hermosa Project is a polymetallic development option located in Santa Cruz County, Arizona. It comprises the Taylor zinc-lead-
silver deposit, the Clark battery-grade manganese deposit, and an extensive, highly prospective land package with potential for the
discovery of polymetallic and copper mineralisation.

The Taylor Mineral Resource estimate (Table A) is reported in accordance with the JORC Code (2012 edition)[1] at 153 million
tonnes, averaging 3.53% zinc, 3.83% lead and 77 g/t silver. The upgrade includes a 41% increase in the Measured Mineral Resource,
providing a compelling base to underpin future production. The deposit remains open in several directions, offering the potential
for further growth.

Separately, we have today released exploration drilling results from our Peake copper-lead-zinc-silver prospect, a lateral zone
prospective for copper mineralisation, located south of the Taylor deposit.

The results include our best intercept at Peake to date, with diamond drill hole HDS-813 returning a downhole intersection of 139m
@ 1.88% copper, 0.51% lead, 0.34% zinc and 52g/t silver at 2.49% CuEq[2] including 58.2m @ 3.1% copper, 0.6% lead, 0.24% zinc,
74g/t silver and 0.015% molybdenum at 3.84% CuEq. Further detail is shown in Annexure 1 – Sections 1 and 2.

We consider the results to be supportive of future exploration potential, with the Peake prospect remaining open in several
directions. Further exploration drilling at Peake is planned in H1 FY24.

Full details of this update are contained in this announcement.

--------------------------
[1] Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012.
[2] Detailed assumption on commodity prices and metallurgical recoveries to derive Copper equivalent (CuEq) values are included in
    Annexure 1-Section 2 under Data aggregation methods.
--------------------------

Competent Person Statement

Mineral Resource estimate
The information in this report that relates to the Mineral Resource estimate for the Taylor deposit is based on information
compiled by Paul Richardson, a Competent Person who is a registered member of Society for Mining, Metallurgy & Exploration, a
‘Registered Professional Organisation’ included in a list that is posted on the ASX website from time to time. Mr. Richardson is a
full-time employee of South32 and has sufficient experience that is relevant to the style of mineralisation and the type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Richardson consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.

Exploration Results
The information in this report that relates to Exploration Results for the Peake prospect is based on information compiled by David
Bertuch, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr. Bertuch is a full-time
employee of South32 and has sufficient experience that is relevant to the style of mineralisation and the type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Bertuch consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.

About us
South32 is a globally diversified mining and metals company. Our purpose is to make a difference by developing natural resources,
improving people’s lives now and for generations to come. We are trusted by our owners and partners to realise the potential of
their resources. We produce commodities including bauxite, alumina, aluminium, copper, silver, lead, zinc, nickel, metallurgical coal
and manganese from our operations in Australia, Southern Africa and South America. With a focus on growing our base metals
exposure, we also have two development options in North America and several partnerships with junior explorers around the world.



  Investor Relations
  Ben Baker
  T     +61 8 9324 9363
  M     +61 403 763 086
  E     Ben.Baker@south32.net



  Media Relations
  Jamie Macdonald                                                   Miles Godfrey
  T     +61 8 9324 9000                                             T      +61 8 9324 9000
  M     +61 408 925 140                                             M      +61 415 325 906
  E     Jamie.Macdonald@south32.net                                 E      Miles.Godfrey@south32.net




Further information on South32 can be found at www.south32.net.

Approved for release to the market by Graham Kerr, Chief Executive Officer
JSE Sponsor: The Standard Bank of South Africa Limited
24 July 2023



                                         
Table A: Mineral Resource estimate for the Taylor deposit in 100% terms[2]

As of 30 June 2023
                                Measured Mineral Resources                    Indicated Mineral Resources                 Inferred Mineral Resources                Total Mineral Resources
      Ore Type
                           Mt2        % Zn       % Pb      g/t Ag       Mt2         % Zn      % Pb         g/t Ag   Mt2        % Zn       % Pb     g/t Ag     Mt2       % Zn       % Pb       g/t Ag
  UG Sulphide[1,3]         41         4.22       4.25        67          83         3.38      3.91          76      28          2.96      2.97         93     153       3.53       3.83         77
Million dry metric tonnes[2], % Zn- Percent zinc, % Pb- Percent lead, g/t Ag- grams per tonne of silver.


As of 30 June 2022
                                Measured Mineral Resources                    Indicated Mineral Resources                 Inferred Mineral Resources                Total Mineral Resources
      Ore Type
                           Mt2        % Zn       % Pb      g/t Ag       Mt2         % Zn      % Pb         g/t Ag   Mt2        % Zn       % Pb     g/t Ag     Mt2       % Zn       % Pb       g/t Ag
    UG Sulphide1           29         4.10       4.05        57          82         3.65      4.45          88      23          3.62      3.82         93     133       3.74       4.26         82
    UG Transition1          -           -          -          -         3.7         6.11      4.21          60      1.4         5.55      3.91         64     5.1       5.95       4.13         61
         Total             29         4.10       4.05        57          86         3.76      4.44          86      24          3.73      3.82         91     138       3.82       4.25         81
Million dry metric tonnes[2], % Zn- Percent zinc, % Pb- Percent lead, g/t Ag- grams per tonne of silver.


Notes:
1. Cut-off grade: NSR of US80$/dmt for UG Sulphide. Input parameters for the NSR calculation are based on South32’s long term forecasts for Zn, Pb and Ag pricing; haulage, treatment, shipping,
   handling and refining charges. Total metallurgical recovery assumptions differ between geological domains and vary from 85% to 92% for Zn, 89% to 92% for Pb, and 76% to 83% for Ag.
2. All masses are reported as dry metric tonnes (dmt). All tonnes and grade information have been rounded to reflect relative uncertainty of the estimate, hence small differences may be present in
   the totals.
3. UG Transition no longer reported separate from UG Sulphide due to change in modelling methodology.


                                                                                                               
MINERAL RESOURCE ESTIMATE FOR THE TAYLOR DEPOSIT

South32 confirms reporting of the updated Mineral Resource estimate as at 30 June 2023 for the Taylor deposit and comparison to
the previously reported Mineral Resource estimate as at 30 June 2022 (Table A).

The Mineral Resource estimate is reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code, 2012 edition).

The breakdown of the total estimates of Mineral Resource into the specific JORC Code categories is contained in Table A. This
announcement summarises the information contained in the JORC Code Table 1 which is included in Annexure 1.

Geology and geological interpretation

The Taylor deposit is predominantly hosted in Permian carbonates of the Pennsylvanian Naco Group of south-eastern Arizona
(Annexure 1 – Figure 3). It is a CRD (Carbonate Replacement Deposit) style Zn-Pb-Ag massive sulphide deposit. The deposit
comprises upper Taylor Sulphide and lower Taylor Deeps domains that have a general northerly dip of 30º and are separated by a
low angle thrust fault. Mineralisation within the stacked profile of the thrusted host stratigraphy extends 1,200m from near-surface
and is open at depth. Mineralisation is modelled for multiple litho-structural domains for an approximate strike of 2,500m and
width of 1,900m. (Annexure 1 – Figures 5 and 6).

Drilling techniques

All recent drilling was conducted from the surface using HQ (95.6mm) diameter core and reducing to NQ (75.3mm) at depth. 
PQ (122.6mm) core has also been used to collect bulk metallurgical samples. Older Reverse Circulation (RC) drilling exists for the
Taylor deposit and is being replaced by core drilling as infill drilling progresses.

The Taylor estimation domains are based on data from 273 surface diamond drill holes.

Since August 2018, holes have been drilled between 60º and 85º dip to maximise the angle at which mineralisation and structures
are intersected. Oriented drilling was introduced in October 2018 to incorporate structural measurements into geological
modelling for stratigraphy and fault interpretation.

Sampling and sub-sampling techniques

The interpreted geology, geometallurgy and geotechnical modelling is based on 507,550m of drilling.

The mineralised intersections were verified by geologists throughout each drilling program and reviewed independently against core
photos by an alternate geologist prior to geological interpretation.

The drill half cores were sampled at regular 1.5m intervals or broken at geologic/structural intervals as needed. Samples were
submitted for preparation at Australian Laboratory Services (ALS), in Tucson, an external ISO 17025 certified laboratory. Preparation
involved crushing to 2mm, a rotary split to 250g and pulverisation to 85% passing 75µm to create a 250g pulp.

Sample analysis method

Samples of 0.25g taken from the 250g pulp were processed at ALS in Vancouver where samples were digested using a four-acid
leach method. This was followed by an Inductively Coupled Plasma – Atomic Emission Spectroscopy (ICP-AES) determination for 33
elements.

A range of Certified Reference Materials (CRM) were routinely submitted to monitor assay accuracy. Low failure rates were within
expected ranges for this deposit style, demonstrating reliable laboratory accuracy.

Results of routinely submitted field duplicates to monitor sample representativity, coarse crush and laboratory pulp duplicates to
quality control sample preparation homogeneity, and certified blank submissions to detect cross-contamination were all within an
acceptable range for resource modelling.


Estimation methodology

Resource estimation was performed using two passes of ordinary kriging and a final outer pass of inverse distance squared
interpolation for four elements of economic interest (Zn, Pb, Ag, Cu), two potentially deleterious elements (Arsenic (As),
Manganese (Mn)) and four tonnage estimation elements (Iron (Fe), Calcium (Ca), Sulphur (S), Magnesium (Mg)).

Search estimation criteria are consistent with geostatistical models developed for each estimation domain according to the
appropriate geological controls.

Validation includes statistical analysis, swath plots and visual inspection.

Specific gravity measurements from drill cores were used as the basis for estimating dry bulk density in tonnage calculations for
both mineralised and non-mineralised material.

Mineral Resource classification

Mineral Resource classification criteria are based on the level of data informing both the geological model and grade estimation.

Measured Resources are reported for blocks with a nearest three-hole average distance of 60m or less and require a minimum of
three holes (nine samples).

Indicated Resources require an average of nearest three-hole drillhole spacing of approximately 110m.

Inferred Resources are constrained by the reporting of estimates to within 300m beyond data and require a minimum of one hole.

Mining and metallurgical methods and parameters

Reasonable prospects for eventual economic extraction have been determined through assessment of the Mineral Resource at a
pre-feasibility study level, ranging from stope optimisation and mine scheduling through to mineral processing and detailed
financial modelling.

Underground mining factors and assumptions for longhole stoping on a sub- or full-level basis with subsequent paste backfill are
made based on industry benchmark mining production and project related studies.

Cut-off grade

The Taylor deposit is a polymetallic deposit which uses an equivalent Net Smelter Return (NSR) value as a grade descriptor.

Input parameters for the NSR calculation are based on South32’s long term forecasts for Zn, Pb and Ag pricing; haulage, treatment,
shipping, handling and refining charges.

Total metallurgical recovery assumptions differ between geological domains and vary from 85% to 92% for Zn, 89% to 92% for Pb,
and 76% to 83% for Ag.

A dollar equivalent cut-off of NSR US$80/dmt is supported by studies and forms the basis of assessment of reasonable prospects
for eventual economic extraction.

Additional information is detailed in Annexure 1.


Annexure 1: JORC Code Table 1: Taylor Mineral Resource estimate and Peake Exploration Results

The following table provides a summary of important assessment and reporting criteria used for the declaration of Mineral
Resource estimate for the Taylor deposit and for the reporting of Exploration Results for the Peake prospect, that form part of the
Hermosa Project located in South Arizona, USA (Figure 1). Sections 1 and 2 below relate to the assessment and reporting criteria
used in respect to both the Taylor deposit and the Peake prospect, whilst Section 3 relates to the declaration of a Mineral Resource
estimate for the Taylor deposit. The criteria are in accordance with the Table 1 checklist of the Australasian Code for the Reporting
of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not, why not’ basis. Unless
otherwise specifically stated, the response in Table 1 relates to both Taylor deposit and Peake prospect.

Section 1 Sampling techniques and data
(Criteria in this section apply to all succeeding sections.)
Criteria               Commentary

Sampling                   •     The FY23 Taylor deposit Mineral Resource Estimate is based on a database comprising of 776 drill
techniques                       holes, including 282 historical Reverse Circulation (RC), Rotary Air Blast (RAB), or Air Circulation (AC)
                                 and 494 Diamond Drilling (DD) drill holes of primarily HQ and NQ sizes. The Taylor deposit is
                                 characterised predominantly by DD. 273 holes were used for the Taylor deposit Mineral Resource
                                 estimation.
                           •     In total, the database features approximately 507,550m of drilling. 140 holes, totalling approximately
                                 56,700m, are excluded from the database where twinned holes were drilled or where the quality of
                                 drilling was compromised historically due to deficiencies in logging, lack of assays, or quality
                                 assurance/control data.
                           •     For the FY23 Mineral Resource Estimate update, 31 holes were added to the database to refine the
                                 geological model but could not be used in estimation due to delays in delivery of analytical results. In
                                 addition, the geological model reflects inputs from near-surface RC drilling.
                           •     The Peake prospect is based on a database comprising 17 diamond drill holes of primarily HQ and NQ
                                 sizes. Exploration results from 13 of these holes were previously reported with four new holes
                                 reported in this announcement. The Peake prospect is characterised by DD.
                           •     A heterogeneity study was undertaken to determine sample representativity. Recommendations to
                                 improve duplicate performance included increasing sub-sample and pulverising volumes.
                           •     Sampling is predominantly at 1.5m intervals on a half-core basis.
                           •     Core is competent to locally vuggy and sample representativity is monitored using half-core field
                                 duplicates submitted at a rate of approximately 1:40 samples. Field duplicates located within
                                 mineralisation envelopes demonstrate an 80% performance to within 30% of original sample splits.
                           •     Core assembly, interval mark-up, recovery estimation (over the 3m drill string) and photography are
                                 all activities that occur prior to sampling and follow documented procedures.
                           •     Sample size reduction during preparation involves crushing and splitting of PQ (122.6mm), (HQ
                                 (95.6mm) or NQ (75.3mm) half-cores.

Drilling techniques        •     Data used for estimation is based on logging and sampling of PQ and HQ diamond core. This is
                                 reduced to NQ in areas of challenging ground condition as well a historical RC drilling. Triple and
                                 split-tube drilling methods are employed in situations where ground conditions require such coring
                                 mechanisms to improve core recovery.
                           •     Since mid-August 2018, all drill cores were oriented using the Boart Longyear ‘Trucore’ system. In Q3
                                 FY20, acoustic televiewer data capture was implemented for downhole imagery for most drilling to
                                 improve orientation and geotechnical understanding. From September 2021, the acoustic televiewer
                                 was the sole drill core orientation method applied. Structural measurements from oriented drilling
                                 are incorporated in geological modelling to assist with fault interpretation.

Drill sample             •    Prior to October 2018, core recovery was determined by summation of measurement of individual
recovery                      core pieces within each 3m drill string. Recovery of core has since been measured after oriented core
                              alignment and mark-up.
                         •    Core recovery is recorded for all diamond drill holes. Recovery on a hole basis exceeds 90%.
                         •    Poor core recovery can occur when drilling through the oxide material and in major structural zones.
                              To maximise core recovery, drillers vary speed, pressure, and composition of drilling muds, reduce
                              PQ to HQ to NQ core size and use triple tube and ‘3 series’ drill bits.
                         •    When core recovery is compared to Zn, Pb, Cu and Ag grades for either a whole data set or within
                              individual lithology, there is no discernible relationship between core recovery and grade.
                         •    Correlation analysis suggests there is no relationship between core recovery and depth from surface
                              except where structure is a consideration. In isolated cases, lower recovery is observed at
                              intersections of the carbonates with a major thrust structure, locally natural karstic voids have been
                              encountered alongside shallow historic workings.

Logging                  •    The entire length of core is photographed and logged for lithology, alteration, structure, Rock Quality
                              Designation (RQD) and mineralisation.
                         •    Logging is both quantitative and qualitative, of which there are several examples including
                              estimation of mineralisation percentages and association of preliminary interpretative assumptions
                              with observations.
                         •    All logging is peer reviewed against core photos. Context of current geological interpretation and
                              information from surrounding drill holes are used when updating geological model.
                         •    Geologic and geotechnical logging is recorded on a tablet with inbuilt Quality Assurance and Quality
                              Control (QA/QC) processes to minimise entry errors before synchronising with the site database.
                         •    Logging is completed to an appropriate level to support assessment of exploration results and
                              Mineral Resource Estimation.

Sub-sampling              •   Sawn half cores and barren whole core samples are taken on predominantly 1.5m intervals for the
techniques and                entire drill hole after logging. Mineralisation is highly visual. Sampling is also terminated at litho-
sample preparation            structural and mineralogical boundaries to reduce the potential for boundary/dilution effects on a
                              local scale.
                          •   Sample lengths vary between 0.75m and 2.3m. The selection of the sub-sample size is not
                              supported by sampling studies.
                          •   Since the initial discovery of the Taylor sulphide deposit, all sample preparation is performed offsite
                              at an ISO 17025 certified laboratory. This was performed by Skyline until 2012, after which it was
                              performed by ALS. Samples submitted to ALS are generally 4–6kg in weight. Sample size reduction
                              during preparation involves crushing of PQ (122.6mm), HQ (95.6mm) or NQ (75.3mm) half or whole
                              cores, splitting of the crushed fraction, pulverisation and finally splitting of the sample for analysis.
                              The process adopted is as follows:
                                   o The entire half or whole core samples are crushed and split in preparation for
                                         pulverisation.
                                   o Fine crushing follows until 70% of the sample passes 2mm mesh. A 250g split of finely
                                         crushed sub-sample is obtained via rotary or riffle splitter and are pulverised. The sub-
                                         sample split was recently increased to 1,000g to address sample heterogeneity study
                                         outcomes.
                                   o The samples are pulverised until 85% of the material is less than 75µm.
                                   o These 250g pulp samples are taken for assay and a 0.25g split is used for digestion.
                          •   ALS protocol requires 5% of samples to undergo a random granulometry QC test. Samples are
                              placed on 2mm sieve and completely processed to ensure the passing mesh criteria is maintained.
                              Pulps undergo similar tests with finer meshes. Results are loaded to an online portal for review by
                              the client.
                          •   Precision in sample preparation is monitored with blind laboratory duplicates assayed at a rate of
                              1:50 submissions.
                          •   Coarse crush preparation duplicate pairs show that at least 80% of Zn, Pb and Cu report within +/-
                              20% of original samples, Ag reports at 78%. Performance significantly improves for all analytes in
                              higher grade samples to better than 90%. Pulp duplicates reporting to 90% for Zn, Pb and Cu, with
                              Ag reporting at 82% within +/-20%. For higher pulp grade samples, the performance improves to
                              99% for all elements.
                          •   Sub-sampling techniques and sample preparation are adequate for providing quality assay data to
                              analyse exploration results and for Mineral Resource estimation but will benefit from planned
                              studies to optimise sample selectivity and quality control procedures.


Quality of assay       •   Historical descriptions of the analytical techniques conducted by ASARCO LLC (ASARCO) from 1950-
data and                   1991 for the original drilling, 113 AC, RAB, RC and DD are not available. ASARCO data does not form
laboratory tests           part of the Mineral Resource estimate.
                       •   Between 2006 and 2009, Arizona Mining Inc. (AMI) used Skyline Laboratories sampling with
                           Inductively Coupled Plasma – Atomic Emission Spectroscopy (ICP-AES) with atomic absorption
                           spectrometry (AAS) to test for Cu, Pb, Zn, and Mn after a multi-acid digestion. Ag and Au fire assays
                           were undertaken by Assayers Canada in Vancouver from a split of each pulp using a 30g charge,
                           occasionally reduced in weight for high manganese oxide samples. In 2006, 4,272 ASARCO pulp
                           samples, representing 90% of sampling, were re-analysed to validate the Cu, Pb, Zn, and Mn assay
                           results. For Ag, the reanalysis program represented 77% of the total assays.
                       •   Between 2010 and 2012, Arizona Mining Inc. (AMI) changed to Inspectorate in Reno, Nevada
                           laboratories for gravimetric fire assay of Au and Ag, with repeat assays of Ag values greater than
                           102g/t (3 ounces per US ton).
                       •   Between 2014 and 2020, samples of 0.25g from pulps were processed at ALS Vancouver. ME-ICP61
                           analysis was used where the samples were totally digested using a four-acid method. This was
                           followed by analysis using a combination of Inductively Coupled Plasma – Mass Spectrometry (ICP-
                           MS) and ICP-AES determination for 33 elements. Overlimit values for Ag, Pb, Zn, and Mn utilise OG-
                           62 analysis. In November 2020, the analytical method improved with ME-MS61 for the four-acid 48
                           element assay for additional elements and improved detection limits alongside the addition of
                           overlimit packages of S-IR07 for S and ME-ICP81 for Mn. Digestion batches of 36 samples plus four
                           internal ALS control samples (one blank, two CRM, and one duplicate) were processed using the
                           four-acid digestion. Industry standard and adequate quality control measures and monitoring are
                           utilised with CRM, duplicates, blanks and internal reference material insertion.
                       •   The nature and quality of assaying and laboratory procedures by AMI and South32 are appropriate
                           for review of exploration results and support resource estimation.


Verification of        •   In 2019, South32 completed a pulp re-assay program of 3,071 samples from 16 holes drilled between
sampling and               2007 and 2012 from the Clark Deposit. This program used 33 suite Inductively Coupled Plasma
assaying                   Optical Emission Spectroscopy (ICP-OES) analysis after four-acid digestion to validate the values for
                           Zn, Mn, Ag, Pb and Cu in the database. This program compared results from the original analytical
                           methods - mixed digestion, spectroscopy and fire assay techniques - with the more established
                           methods employed on the project since 2014 - based on ICP-AES and total digestion. A secondary
                           objective of the re-assay program was to provide a more complete analytical suite for multielement
                           data which had not been analysed in the 2007-2012 drilling.
                                 o The re-assay results indicate good reproducibility in ICP-OES results for zinc, manganese,
                                      silver and lead, from relative percent difference calculated for each original and duplicate
                                      sample pair. Gravimetric fire assay results for silver are generally not comparable around
                                      low values and issues with these values are known from previous studies.
                       •   Core photos of the entire hole are reviewed by geologists to verify significant intersections and to
                           finalise the geological interpretation from core logging.
                       •   Sampling is recorded digitally and uploaded to an Azure SQL project customised database (Plexer) via
                           an API provided by the ALS laboratory and the external Laboratory Information Management System
                           (LIMS). Digitally transmitted assay results are reconciled once uploaded to the database.
                       •   No adjustments of assay data were made.


Location of data          •   Drill hole collar locations are surveyed by registered surveyors using a GPS Real Time Kinematic (RTK)
points                        rover station correlating with the Hermosa project RTK base station and Global Navigation Satellite
                              Systems which provide up to 1cm accuracy.
                          •   Downhole surveys prior to mid-August 2018 were undertaken with a ‘TruShot’ single shot survey tool
                              every 76m and at the bottom of the hole. Between 20 June 2018 and 14 August 2018, downhole
                              surveys were undertaken at the same interval with both the single shot and a Reflex EZ-Gyro, after
                              which the Reflex EZ-Gyro was used exclusively.
                          •   The Hermosa project uses the Arizona State Plane (grid) Coordinate System, Arizona Central Zone,
                              International Feet. The datum is NAD83 with the vertical heights converted from the ellipsoidal
                              heights to NAVD88 using GEOID12B.
                          •   All drill hole collar and downhole survey data were audited against source data.
                          •   Survey collars have been compared against a one-foot topographic aerial map. Discrepancies
                              exceeding 1.8m were assessed against a current aerial flyover and the differences attributed to
                              surface disturbance from construction development and/or road building.
                          •   Survey procedures and practices result in data location accuracy suitable for mine planning.


Data spacing and          •   Drill hole spacing ranges from 10m to 500m. The spacing supplies sufficient information for
distribution                  geological interpretation and mineral resource estimation.
                          •   Drill holes were composited to nominal 1.5m downhole composites.


Orientation of data       •   Mineralisation varies in dip between:
in relation to                       o 30°NW in the upper Taylor Sulphide.
geological                           o 20°N and 30°N in the lower Taylor Deeps and Peake Sulphide domains.
structure                 •   Drilling is oriented at a sufficiently high angle to allow for accurate representation of grade and
                              tonnage using three-dimensional modelling methods.
                          •   There is an indication of sub-vertical structures (possibly conduits for or offsetting mineralisation)
                              which have been accounted for at a regional scale through the integration of mapping and drilling
                              data. Angled, oriented core drilling introduced from October 2018 is designed to improve
                              understanding of the relevance of structures to mineralisation, as well as the implementation of
                              acoustic televiewer capture.


Sample security           •   Samples are tracked and reconciled through a sample numbering and dispatch system from site to
                              the ALS sample distribution and preparation facility in Tucson or other ALS preparation facilities as
                              needed. The ALS LIMS assay management system provides an additional layer of sample tracking
                              from the point of sample receipt. Movement of samples from site to the Tucson distribution and
                              preparation facility is currently conducted through contracted transport. Distribution to other
                              preparation facilities and Vancouver is managed by ALS dedicated transport.
                          •   Assays are reconciled and results are processed in an Azure SQL project customised database
                              (Plexer) which has password and user level security.
                          •   Core is stored in secured onsite storage prior to processing. After sampling, the remaining core,
                              returned sample rejects and pulps are stored at a purpose-built facility that have secured access.
                          •   All sampling, assaying and reporting of results are managed with procedures that provide adequate
                              sample security.


Audits or reviews         •   The FY23 Mineral Resource and database supporting exploration results has been externally audited
                              by Golder Associates Pty Ltd. The audit concluded, in general, that modelling has been conducted in
                              a manner consistent with industry standards and supporting documentation has been adequate.
                          •   The ALS laboratory sample preparation and analysis procedures were audited by internal South32
                              Geoscientists during the drilling campaign. No significant issues were identified. Outcomes of the
                              audit were shared with ALS for them to implement recommendations.
                          •   Recent changes have been implemented to improve duplicate performance by increasing the size of
                              sub-sample splits and pulverising volumes.




Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria            Commentary

Mineral                  •    The Hermosa Project mineral tenure (Figures 1 and 2) is secured by 30 patented mining claims,
tenement and                  totalling 228 hectares that have full surface and mineral rights owned fee simple. These claims are
land tenure                   retained in perpetuity by annual real property tax payments to Santa Cruz County in Arizona and have
status                        been verified to be in good standing until 31 December 2023.
                         •    The patented land is surrounded by 2,505 unpatented lode mining claims totalling 19,225.82 hectares.
                              These claims are retained through payment of federal annual maintenance fees to the Bureau of Land
                              Management (BLM) and filing record of payment with the Santa Cruz County Recorder. Payments for
                              these claims have been made for the period up to their annual renewal on or before 1 September
                              2024.
                         •    Title to the mineral rights is vested in South32’s wholly owned subsidiary South32 Hermosa Inc. No
                              approval is required in addition to the payment of fees for the claims.
                         •    AMI purchased the project from ASARCO and no legacy royalties, fees or other obligations are due to
                              ASARCO or its related claimants (i.e. any previous royalty holders under ASARCO royalty agreements).
                              At present, four separate royalty obligations apply to the project:
                                    o Ozama River Corporation: A 2% NSR royalty payable by AMI to Ozama River Corporation
                                         (Ozama) for the future sale of all production minerals from certain identified claims.
                                    o Osisko Gold Royalties Ltd.: A 1% NSR royalty to Osisko Gold Royalties Ltd. (Osisko) on all
                                         sulphide ores of lead and zinc in, under, or upon the surface or subsurface of the Hermosa
                                         project. This royalty also applies to any copper, silver or gold recovered from the concentrate
                                         from such ores.
                                    o Bronco Creek Exploration, Inc.: A 2% of production returns from those claims to Bronco
                                         Creek claims.
                                    o Allis Holdings Arizona, LLC: A 1.5% NSR royalty on all production minerals extracted from
                                         three patented mining claims consisting of approximately 60.94 acres (24.66 hectares(ha)).
                         •    In addition to the 30 patented mining claims with the surface and mineral rights owned fee simple,
                              South32 Hermosa Inc. also owns other fee simple properties totalling approximately 3,120.09 acres
                              (1,263.65 ha) which are not patented mining claims, and which are a mix of residential and vacant
                              properties.

Exploration done         •    ASARCO acquired the property in 1939 and completed intermittent drill programs between 1940 and
by other parties              1991. ASARCO initially targeted silver and lead mineralisation near historical workings of the late 19th
                              century. ASARCO identified silver-lead-zinc bearing manganese oxides in the manto zone of the
                              overlying Clark deposit between 1946 and 1953.
                         •    Follow up rotary air hammer drilling, geophysical surveying, detailed geological and metallurgical
                              studies on the manganese oxide manto mineralisation between the mid-1960’s and continuing to
                              1991, defined a heap leach amenable, low-grade manganese and silver resource reported in 1968,
                              updated in 1975, 1979 and 1984. The ASARCO drilling periods account for 113 drill holes in the
                              database.
                         •    In March 2006, AMI purchased the ASARCO property and completed a re-assay of pulps and
                              preliminary SO2 leach tests on the manto mineralisation for a Preliminary Economic Assessment (PEA)
                              in February 2007. Drilling of RC and diamond holes between 2006 and 2012 focused on the Clark
                              deposit (235 holes) and early definition of the Taylor deposit sulphide mineralisation (16 holes), first
                              intersected in 2010. Data collected from the AMI 2006 campaign is the earliest information
                              contributing to estimation of the Taylor deposit Mineral Resource.
                         •    AMI drill programs between 2014 and August 2018 (217 diamond holes) focused on delineating Taylor
                              deposit sulphide mineralisation, for which Mineral Resource estimates were reported in compliance to
                              NI 43-101 (Foreign Estimate) in November 2016 and January 2018.

Geology                  •    The regional geology is set within Lower-Permian carbonates, underlain by Cambrian sediments and
                              Proterozoic granodiorites. The carbonates are unconformably overlain by Triassic to late-Cretaceous
                              volcanic rocks (Figures 3 and 4). The regional structure and stratigraphy are a result of late-
                              Precambrian to early-Palaeozoic rifting, subsequent widespread sedimentary aerial and shallow
                              marine deposition through the Palaeozoic Era, followed by Mesozoic volcanism and late batholitic
                              intrusions of the Laramide Orogeny. Mineral deposits associated with the Laramide Orogeny tend to
                              align along regional NW and NE structural trends.
                         •    Cretaceous-age intermediate and felsic volcanic and intrusive rocks cover much of the Hermosa
                              project area and host low-grade disseminated silver mineralisation, epithermal veins and silicified
                              breccia zones that have been the source of historic silver and lead production.
                         •    Mineralisation styles in the immediate vicinity of the Hermosa Project include:
                              o the Carbonate Replacement Deposit (CRD) style zinc-lead-silver base metal sulphides of the
                                   Taylor deposit;
                              o the lateral skarn-style copper-lead-zinc-silver Peake prospect; and
                              o an overlying manganese-zinc-silver oxide manto deposit of the Clark deposit (Figures 4, 5, 6,
                                   and 7).
                         •   The Taylor deposit comprises the overlying Taylor Sulphide and Taylor Deeps domains separated by a
                             thrust fault. Approximately 600–750m lateral and south of the Taylor Deeps domain, the Peake
                             prospect copper-skarn sulphide mineralisation is identified in older lithological stratigraphic units along
                             the continuation of the thrust fault (Figures 5 and 6).
                         •   The north-bounding edge of the thrusted carbonate rock is marked by a thrust fault where it ramps up
                             over the Jurassic/Triassic ‘Older Volcanics’ and ‘Hardshell Volcanics’. This interpreted pre-mineralising
                             structure that created the thickened sequence of carbonates also appears to be a key mineralising
                             conduit. The thrust creates a repetition of the carbonate formations below the Taylor Sulphide
                             domain, which host the Taylor Deeps mineralisation.
                         •   The Taylor Deeps mineralisation dips 10°N to 30°N, is approximately 100m thick and is primarily
                             localised near the upper contact of the Concha Formation and unconformably overlying Older
                             Volcanics. Some of the higher-grade mineralisation is also accumulated along a westerly plunging
                             lineation intersection where the Concha Formation contacts the Lower Thrust. Mineralisation has not
                             been closed off down-dip or along strike.
                         •   Lateral to the Taylor Deeps mineralisation, skarn sulphide mineralisation of the Peake prospect is
                             identified in older lithological stratigraphic units along the continuation of the thrust fault. This creates
                             a continuous structural and lithological controlled system from the deeper skarn Cu domain into Taylor
                             Deeps, Taylor Sulphide and associated volcanic hosted mineralisation and the Clark oxide deposit.
                         •   The Peake prospect is comprised of a series of stacked horizons that have a general north-westerly dip
                             of 300 hosting disseminated to semi-massive sulphide. The upper and lower extents of the horizons
                             tend to have polymetallic mineralisation with the central component dominated by copper sulphides,
                             predominantly chalcopyrite. Mineralisation within the stacked profile is approximately 130m thick, for
                             an approximate 450m strike and 300m width.

Drill hole          •   The Taylor deposit and Peake prospect drill hole information, including tabulations of drill hole
Information             positions and lengths, is stored, within project data files created for this estimate and exploration
                        results review, on a secure server.
                    •   A drill hole plan view (Figure 4) provides a summary of drilling collar locations that support the Peake
                        prospect exploration results and surface geology. Figure 5 provides the Peake prospect exploration
                        drill holes relative to the mineralisation domains. Figure 6 provides the drill hole plan in cross section
                        relative to the FY23 Taylor deposit and FY22 Clark deposit Mineral Resource domains and simplified
                        lithologies, and the Peake prospect. Figure 6 shows a cross sectional view of the mineralisation
                        domains and Figure 7 shows a level plan of the Peake prospect relative to drilling and current
                        mineralisation envelope.
                    •   Table 1 summarises new drill holes to dates from Peake prospect exploration.
                    •   Table 2 summarises selective Peake prospect exploration result significant intersections to date, both
                        previously reported and new for balanced reporting. All previous drill hole information is provided in
                        the 17 January 2022, Hermosa Project Update announcement released to Australian Securities
                        Exchange (ASX) and can be found in www.south32.net.
                    •   Hole depths vary between 15m and 2,075m.

Data                •   Data is not aggregated other than length-weighted compositing for grade estimation.
aggregation         •   Significant assay intercepts are reported as length-weighted averages exceeding either 2% ZnEq or
methods                 0.2% Cu to report exploration results.
                    •   No top cuts are applied to grades for intercept length-weighted average calculations when assessing
                        and reporting exploration results.
                    •   Capping was undertaken for the updated Taylor deposit Mineral Resource estimate.
                    •   Percentage zinc equivalent (% ZnEq) accounts for combined value of Zn, Pb and Ag. Metals are
                        converted to % ZnEq via unit value calculations using long-term consensus metal price assumptions
                        and relative metallurgical recovery assumptions. Total metallurgical recoveries differ between
                        geological domains and vary from 85% to 92% for Zn, 89% to 92% for Pb and 76% to 83% for Ag.
                        Average payable metallurgical recovery assumptions are 90% for Zn, 91% for Pb, and 81% for Ag.
                        Metals pricing assumptions are South32’s long-term consensus prices as at the April 2023 quarter. The
                        formula used for calculation of zinc equivalent is ZnEq (%) = ZnEq (%) = Zn (%) + 0.5859 * Pb (%) +
                        0.01716 * Ag (g/t).
                    •   Percentage copper equivalent (% CuEq) accounts for combined value of Cu, Zn, Pb and Ag. Metals are
                        converted to % CuEq via unit value calculations using long-term consensus metal price assumptions
                        and relative metallurgical recovery assumptions. Total metallurgical recoveries differ between
                        geological domains and vary from 85% to 92% for Zn, 89% to 92% for Pb, 76% to 83% for Ag and 80%
                        for Cu. Average payable metallurgical recovery assumptions are 90% for Zn, 91% for Pb, 81% for Ag
                        and 80% for Cu. Metals pricing assumptions are South32’s long-term consensus prices as at the April
                        2023 quarter. The formula used for calculation of copper equivalent is CuEq (%) = Cu (%) + 0.3965*Zn
                        (%) + 0.2331 * Pb (%) + 0.0068 * Ag (g/t).

Relationship            •   Vertical (90-85º dip) drilling is used to create the geology model. Where drilling intersects the low-to-
between                     moderately dipping (30°) stratigraphy, the intersection length can be up to 15% longer than true width.
mineralisation          •   Since August 2018, drilling has been intentionally angled between 60º and 85º to maximise the angle
widths and                  at which mineralisation is intersected.
intercept lengths       •   The mineralisation is modelled in three dimensions (3D) to appropriately account for sectional bias or
                            apparent thickness issues which may result from two dimensional (2D) interpretations.

Diagrams                •   Relevant maps and sections are included with this announcement.

Balanced                •   Exploration results for Peake prospect are reported as an update to previous disclosed Exploration
reporting                   Results. All new drill hole intersections are considered in this assessment for balanced reporting,
                            alongside proximal drillholes that have been previously reported. A list of drill holes is included as an
                            annexure and previous drill hole information is provided in the 17 January 2022, Hermosa Project
                            Update announcement released to ASX and can be found in www.south32.net.

Other                   •   Aside from drilling, the geological model is developed from local and regional mapping, geochemical
substantive                 sampling and analysis and geophysical surveys. Metallurgical test work, specific gravity sampling and
exploration data            preliminary geotechnical logging have contributed to evaluating the potential for reasonable prospects
                            for eventual economic extraction of the Mineral Resource at a prefeasibility study level.
                        •   Magneto-telluric (MT) and Induced Polarisation (IP) surveys were conducted with adherence to
                            industry standard practices by Quantec Geosciences Inc. In most areas, the MT stations were collected
                            along N–S lines with 200m spacing. Spacing between lines is 400m. Some areas were collected at 400m
                            spacing within individual lines. IP has also been collected, both as 2D lines and as 2.5D swaths,
                            collected with a variable spacing of data receivers.
                        •   Quality control of geophysical data includes using a third-party geophysical consultant to verify data
                            quality and provide secondary inversions for comparison to Quantec interpretations.

Further work            •   Planned elements of the resource development strategy include extensional and infill drilling,
                            orientation and logging for detailed structural and geotechnical analysis, comprehensive specific
                            gravity sampling, further geophysical and geochemical data capture and structural and paragenesis
                            studies.
                        •   Additional drilling of the Peake prospect is planned for FY24 and is guided by outcomes of a detailed
                            assessment of recent drilling and geophysical surveys in the area.




Section 3 - Estimation and Reporting of Mineral Resources
(Applies only to the Taylor Mineral Resource estimate)
(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)
Criteria                    Commentary

Database                   •    Drill hole data is stored in a Plexer database. Collar, survey, sample dispatch data and analytical
integrity                       results are uploaded from .csv files as they become available. The upload process includes validation
                                checks for consistency and anomalous values.
                           •    Drill logs have been entered directly into Fusion from paper-based records. This process was
                                improved by the introduction of digital logging in October 2018 whereby this data is generated as
                                .csv files for upload and validation.

Site Visits               •     The Competent Person has reviewed the Taylor deposit Mineral Resource Estimate, visits the site
                                regularly and is a full-time employee of South32.
                          •     The objectives of the site visit are to understand all inputs and processes contributing to the FY23
                                Mineral Resource estimate, including core drilling, changes in core logging procedures, digital core
                                logging, database audits and resampling programs to improve confidence in geological interpretation,
                                density estimation and geometallurgical inputs.
                          •     The Competent Person discussed sample preparation and laboratory procedures with ALS
                                representatives to ensure that these procedures are applied.
                          •     The findings of site visits indicate the data and procedures are of sufficient quality for Mineral
                                Resource estimation and reporting. Review and required improvement are continuously discussed
                                and any required changes are implemented.

Geological                •     'Mineralisation domains' are created within bounding lithologies using indicator modelling methods
interpretations                 of the cumulative in-situ value of metal content. The metal content descriptors, termed ‘Metval’ and
                                ‘Oxval’ are calculated by summing the multiplication of economic analyte grades for Mn, Zn, Pb, Cu
                                and Ag, price and recovery. Metval and Oxval cut-off ranges for mineralisation domains ranged from
                                US$6 to US$17 for the different litho-structural domains. Material above the Metval and Oxval cut-off
                                is modelled utilising the indicator numerical model function in Leapfrog Geo™ to create volumes.
                          •     Indicator models are guided using geologic trends based on modelled lithologic contacts and
                                structures within a post mineralisation fault block model. Constraints on these domains include
                                known bounding structures, stratigraphy and manually digitised limits on the extents of
                                mineralisation. In addition to drill hole data, historic underground mine plans and mapping and
                                surface geologic mapping is used to help extend geologic features to the topography. The purpose of
                                these domains is to provide mineralised volumes within the larger lithologic boundaries and to
                                ensure relevant geological controls and constraints are considered. Indicator cut-offs are selected to
                                create continuous volumes consistent with the overall modelling approach for CRD-style
                                mineralisation.
                          •     Mineralised domains are evaluated against multiple indicator scenarios for parameters such as
                                inherent dilution, exclusion and volumetric changes. These evaluations aim to balance the
                                parameters with the understood continuity of mineralisation from site geological staff interpretation.
                          •     Alternate geological interpretations have not been used; however, the model is continually evolving
                                as new data is collected.

Dimensions                •     The mineralising system is yet to be fully drill tested in multiple directions. The Taylor sulphide
                                mineralisation is constrained up-dip where it transitions to oxide mineralisation, representing a single
                                contiguous mineralised system. Taylor is open in multiple directions.
                          •     The north-bounding edge of the thrusted carbonate rock is marked by a thrust fault where it ramps
                                up over the Jurassic/Triassic ‘Older Volcanics’ and ‘Hardshell Volcanics’. This interpreted pre-mineral
                                structure that created the sequence of carbonates also appears to be a key conduit for
                                mineralisation.
                          •     The Taylor deposit has an approximate strike length of 2,500m and width of 1,900m. The stacked
                                profile of the thrusted host stratigraphy extends 1,200m from near-surface and is open in several
                                directions. (Figure 5 and Figure 6).

Estimation and       •    Geologic modelling was performed using Leapfrog Geo™ 2022.1.0 and grade estimations using
modelling                 Maptek Vulcan.
techniques           •    Elemental estimation includes Zn, Pb, Ag and Cu. As and Mg are estimated as potential deleterious
                          analytes and Fe, Ca, S, and Mg are estimated as tonnage inputs.
                     •    The specific gravity is also estimated using a restricted search guided by geologic trends.
                     •    Estimation and modelling techniques reflect the interpreted structural and lithological controls on
                          mineralisation apparent in the core and in data. These align with the current understanding of the
                          formation of CRD style mineralisation. Key assumptions include:
                               o The relative importance of structure and lithology in either facilitating or constraining the
                                      deposition of mineralisation.
                               o Geological domaining according to these controls; and
                               o All boundaries are considered "hard."
                     •    Search orientations are aligned with mineralised structures and lithological contacts using locally
                          varying anisotropy to assign directions on a block-by-block basis. Search distances and variography
                          parameters are interpolated into 'parent' blocks of 9m by 9m by 4.5m from 3D geological wireframes
                          taken from the geological model.
                     •    Assay data is composited to a nominal interval of 1.5m within mineralisation domains for the purpose
                          of exploratory data analysis to derive estimation parameters for ordinary kriging.
                     •    To manage the risk of local grade overestimation, high-grade outliers in the drill holes are capped
                          prior to compositing. Cap values are determined using log probability plots for each domain. Selected
                          thresholds are typically above the 99.5 percentile where the distribution or sample support
                          deteriorates and to reduce the coefficient of variation. No bottom caps are applied.
                     •    The outputs of geostatistical analysis, including variography and Quantitative Kriging Neighbourhood
                          Analysis (QKNA), are used to optimise grade estimation parameters such as search distances, sample
                          selection criteria, and block dimension. A parent block size of 9m by 9m by 4.5m is selected relative
                          to a data spacing of between 25m and 150m. However typically a data spacing of approximately 50m
                          within the core of mineralisation is used to support mining study selectivity within the minimum
                          Selective Mining Unit (SMU) dimension.
                     •    Sub-cells to a minimum of 1.5m are built along the contacts of the estimation domains to reduce the
                          volume variance between wireframe models and the orthogonal block model.
                     •    The dimensions of the anisotropic search ellipses for each estimation pass are generally matched to
                          the ranges of the first and second structures of the variograms per domain using ranges of the overall
                          structure of grade continuity for the zinc variogram models. The search ellipse ranges vary between
                          estimation domains but remain the same for all elements within individual domains. While related
                          elements (e.g. Pb-Ag, Pb-Zn, Ag-Zn) are not co-kriged, their correlated nature is validated and
                          confirmed that the relationship is preserved in block estimates.
                     •    Minimum and maximum sample criteria, an octant search strategy and a restriction of the number of
                          samples used from each drill hole are applied to assist with reduction of local grade bias. A second
                          search pass, set at the entire range of the zinc variogram, is used to estimate lower confidence areas
                          of the model.
                     •    Kriging tests with visual and statistical validation of results indicate whether it is appropriate to apply
                          an initial top cap, which is then adjusted up or down to counter any global bias introduced. The
                          degree of grade smoothing between data and block values is analysed through a comparison of mean
                          differences, histograms, q-q plots and swath plots.
                     •    Classification criteria constrain the reporting of estimates to within demonstrated grade and
                          geological continuity ranges. As all estimation passes rely on at least two holes to inform the
                          estimate, there is no extrapolation from single holes in any classified material.
                     •    The appropriateness of estimation techniques contributes to the high confidence estimation outcome
                          achieved in areas of data spacing within the full ranges of grade continuity.
                     •    The grade estimations are compared against previous estimates and reviewed locally for differences
                          in data/interpretation and globally using graded tonnage plots and waterfall analysis.
                     •    The Mineral Resource is reported for Zn, Pb and Ag without any assumptions relating to recovery of
                          by-products.
                     •    Resource estimation is well established and reasonable for the deposit.

Moisture             •    Moisture content of the core appears to be minimal, based on logging observations and pre-and post-
                          dried sample weights tested by ALS on assay samples from July 2019 to February 2022 on over
                          50,000m. A dry bulk density is assumed for estimation purposes.

Cut-off              •    NSR reporting cut-off values are based on relevant project study operational costs and pricing
parameters                scenarios. Application of a nominal lower limit of breakeven economics from these costs is
                          considered as the reasonable prospects for eventual economic extraction under current economic
                          modelling.
                     •    The calculations for each block are used to determine resource block cut-off according to variability
                          of physical costs such as logistics, treatment costs, refining costs and economic factors such as metal
                          pricing.
                     •    The NSR cut-off values for reporting the FY23 Taylor deposit Mineral Resource is US$80/dmt for
                          material considered extractable by underground open-stope methods.
                     •    The input parameters for the NSR calculation include South32 long-term forecasts for Zn, Pb and Ag
                          pricing, haulage, treatment, shipping, handling and refining charges.

Mining factors or    •    Underground mining factors and assumptions are based on pre-feasibility level project studies and
assumptions               are calibrated against South32's Cannington zinc, lead and silver mine production. Longhole stopes on
                          a sub- or full-level basis with subsequent paste backfill is the assumed mining method.
                     •    Reasonable prospects for eventual economic extraction are determined through assessment of the
                          model at Prefeasibility Study (PFS) levels using processes ranging from stope optimisation and mine
                          scheduling through to detailed financial modelling.
                     •    The NSR block value incorporates metallurgical recovery based on test work for composite and
                          individual mineralisation domains.

Metallurgical        •    Total metallurgical recovery assumptions vary for sulphide geological domains from 87% to 94% for
factors or                zinc; 94% to 95% for lead; and 87% to 92% for silver. These assumptions have been verified through
assumptions               extensive metallurgical test work.

Environmental        •    Pre-Feasibility level environmental assumptions, including possible waste and process residue
factors or                disposal options, are factored into physical and financial models that are used to evaluate reasonable
assumptions               prospects for eventual economic extraction.

Bulk density         •    Dry bulk density is estimated for mineralisation domains where data density is sufficient to estimate
                          Zn on the first pass. Zn variograms and first pass search criteria are applied to density measurements.
                          The current database records 25,272 Specific Gravity (SG) measurements.
                     •    SG was originally calculated beyond the range of the first pass using Zn, Pb, Ag, Fe, Ca and Mg using a
                          regression formula. Measurements from previous campaigns, low numbers of which were taken from
                          sulphide and oxide mineralisation in carbonates, are excluded from the analysis because assaying did
                          not include the full complement of elements used for the regression formulae.
                     •    A final pass of assigned average density values is applied to fill blocks on the outskirts without grade.
                     •    Historically SG measurements were taken from an approximate 20cm representative section of
                          competent core within a 1.5m sample interval. Since May 2021, to improve the SG regression
                          analysis, SG measurements are broken out with an associated assay interval of approximately >60cm.
                          The measurement technique determines a specific gravity using the core weight in air and weight
                          immersed in water. Routine calibration of scales and duplicate measurements are undertaken for
                          quality control.
                     •    The core is not oven dried or coated to prevent water ingress prior to immersion unless porosity is
                          noted in the sample. If porosity is noted, the core was coated in plastic film.
                     •    Lithology outside of mineralisation domains have an average bulk density assigned by rock type.


Classification       •    Mineral Resource classification criteria is based on the level of data informing both the geological
                          model and grade estimation.
                     •    Classification is ultimately achieved by manual selection of blocks within a triangulation designated by
                          the Competent Person. The triangulation is a smoothed version of a model calculation field.
                     •    The calculation used to guide the Competent Person’s creation of the triangulation, overlays grade
                          estimation confidence indicators (such as kriging variance) on block estimation conditions relating to
                          the number and distance of data informing the estimate in relation to semi-variogram models for Zn,
                          Pb and Ag.
                     •    Classification criteria is determined on an individual estimation domain basis:
                               o Measured Mineral Resource classification approximates an area of high geological
                                     modelling confidence, with block grades for Zn, Pb and Ag informed by a high number of
                                     data sourced within first pass search radii. The block is also interpolated from data within a
                                     range equivalent to 'two-thirds' of the variogram range.
                               o Indicated Mineral Resource classification meet similar conditions to Measured, except data
                                     spacing criteria is expanded to ranges that match the final variogram range. Search ranges
                                     constraining this classification are typically around 150m for Sulphide.
                     •    Estimated blocks exceeding prior criteria are classified as an Inferred Mineral Resource, up to a
                          maximum average distance of approximately 300m from the contributing data.


Audits or reviews    •    The FY23 Mineral Resource has been independently audited by Golder Associates Pty Ltd. The audit
                          concluded, in general, that modelling has been conducted in a manner consistent with industry
                          standards and supporting documentation has been adequate.

Discussion of        •    Geological modelling is such that there is a moderate-to-high degree of predictability in the position
relative accuracy/        and quality of mineralisation where infill drilling is being conducted. Geostatistical analysis indicates a
confidence                low nugget effect and ranges of grade continuity are beyond drill spacing in Measured and Indicated
                          areas of the deposit.
                     •    Measured Resources of the FY23 Taylor deposit Mineral Resource global estimate is expected to be
                          within 15% accuracy for tonnes and grade when reconciled over any quarterly production volume
                          using mining assumptions matched to the determination of reasonable prospects for eventual
                          economic extraction. Indicated Mineral Resource uncertainty should be limited to ±30% quarterly and
                          ±15% annually. It is expected that Inferred Mineral Resources will be converted to higher confidence
                          classifications prior to extraction.
                     •    The Competent Person is satisfied that the accuracy and confidence of Mineral Resource estimation is
                          well established and reasonable for the deposit.





Figure 1: Regional location plan
Figure 2: Hermosa project tenement map
Figure 3: Hermosa project regional geology
Figure 4: Taylor deposit and Peake prospect local geology and Exploration Results collar locations
Figure 5: Plan view of the Taylor, Clark, and Peake Mineralisation Domains with exploration drill holes
Figure 6: Cross-section through the Taylor, Clark, and Peake mineralisation domains showing the previously reported and new
exploration holes, simplified geology, and Taylor Thrust – looking east 2000 m wide.
Figure 7: Level plan map at 370m elevation showing Peake drillholes, and mineral domains of the Peake prospect. Newly reported
hole IDs are blue.

For the schematics, refer to the full announcement on the Company’s website at https://www.south32.net


Table 1: Hole ID, collar location, dip, azimuth and drill depth of new drill holes

    Hole ID            East (UTM)           North (UTM)                Elevation (m)         Dip        Azimuth             To Depth (m)
    HDS-810              525788                3480619                     1593.4             -71           132               1618.2
    HDS-813              525789                3480611                     1593.4             -73           171               1613.0
    HDS-814              525961                3479776                     1665.5             -77           280               1752.0
    HDS-815              525963                3479774                     1665.5             -81           353               1683.0



Table 2: Significant intersections – selected previously reported and new drill holes

                From          To        Cut Off       Width       Zinc         Lead     Silver      Copper        Molybdenum           CuEq
   Hole ID
                 (m)         (m)                       (m)        (%)           (%)     (ppm)         (%)             (%)               (%)
               1279.2       1389        0.2% Cu       109.7        0.1          0.3      15          0.62             -                0.83
                                                                          Including
  HDS-540
               1303.6      1309.7       0.2% Cu          6.1       0.2          0.4      61          3.48             -                4.07
               1469.7       1488        0.2% Cu          18.3       0              0     10          0.63             -                0.70
               1265.8      1273.9       0.2% Cu          8.1       0.2          0.5      27          0.39             -                0.77
               1308.2      1384.7       0.2% Cu          76.5      0.2          0.4      25          1.52             -                1.86
                                                                          Including
               1309.9      1328.6       0.2% Cu          18.8      0.1          0.2      40          2.77             -                3.13
  HDS-552
                                                                             And
               1364.3      1384.7       0.2% Cu          20.4      0.1          0.3      37          2.44             -                2.80
               1478.9      1484.8       0.2% Cu          5.9        1           1.5      57          0.41             -                1.54
               1646.8      1651.4       0.2% Cu          4.6       0.6          0.1      45          0.3             0.02              0.87
               1298.4      1305.2       2% ZnEq          6.7       0.6          3.4      249         0.89             -                3.61
               1322.2      1374.6       0.2% Cu          52.4      0.2          0.5      59          1.73             -                2.33
                                                                          Including
               1322.2       1346        0.2% Cu          23.8      0.1          0.8      81          3.32             -                4.10
                                                                          Including
               1322.2      1330.1       0.2% Cu          7.9       0.1          0.4      81          7.89             -                8.57
  HDS-661
               1386.8      1460.6       0.2% Cu          73.8      0.5          0.7      67          1.06             -                1.88
                                                                          Including
               1399.6      1410.3       0.2% Cu          10.7      0.7          1.5      227         2.84             -                5.01
                                                                             And
                1424       1446.9       0.2% Cu          22.9      0.5          0.6      45          1.24             -                1.88
                1552        1570        0.2% Cu          18         3           1.4      88          0.39             -                2.50
               1316.4      1329.2       0.2% Cu          12.8      3.4          4.4      137         0.95            0.01              4.26
  HDS-662
               1540.8      1546.7       2% ZnEq          5.9       5.9          2.1      250         0.45             -                4.98
               1580.1      1591.8       0.2% Cu          11.7      0.1             0     16          0.95           0.016              1.10
  HDS-663
               1615.9      1651.1       0.2% Cu          35.2      1.1          0.1      27          0.56             -                1.20
               1343.6      1353.6       2% ZnEq          10.1      3.8          3.5      61          0.47           0.024              3.21
               1384.7      1395.4       0.2% Cu          10.7      2.7          2.9      38          1.03             -                3.04
  HDS-691      1405.9      1415.2       0.2% Cu          9.3       0.5          0.7      11          0.26             -                0.70
               1421.3      1452.1       0.2% Cu          30.8      0.7          0.8      22          0.59             -                1.20
               1463.6      1509.7       0.2% Cu          46        0.4          0.5      21          0.43             -                0.85

             From        To       Cut Off     Width     Zinc       Lead        Silver     Copper   Molybdenum   CuEq
  Hole ID
              (m)       (m)                    (m)      (%)         (%)        (ppm)        (%)        (%)       (%)
            1540.6     1549.3     0.2% Cu      8.7       0.3        0.9             51     0.61        -        1.29
            1563.9     1581.3     0.2% Cu      17.4      0.2        0.2             23     0.55        -        0.83
            1662.7     1677.9     0.2% Cu      15.2      2.8        1.1             155    1.19      0.011      3.61
            1683.4     1692.6     2% ZnEq      9.1       1.5        0.3             45     0.14      0.038      1.11
             1732      1735.2     2% ZnEq      3.2       6.2        0.3             107    0.18        -        3.44
            1994.6     1997.4     2% ZnEq      2.7       1.7        0.3             54     0.08        -        1.19
 HDS-810                                              No Significant Intersection
            1302.7     1441.7     0.2% Cu      139      0.34        0.51            52     1.88        -        2.49
                                                               Including
            1315.1     1424       0.2% Cu      109      0.32        0.52            60     2.27        -        2.93
                                                               Including
            1333.8     1392       0.2% Cu      58.2     0.24        0.6             74     3.1       0.015      3.84
                                                               Including
 HDS-813
            1358.2     1368.9     0.2% Cu      10.7     0.05        0.09            79     5.7       0.011      6.28
                                                               Including
            1358.2     1362.8     0.2% Cu      4.6      0.06        0.11            112    8.38        -        9.19
                                                                 And
             1381      1390.5     0.2% Cu      9.4      0.07        0.19            94     5.4         -        6.11
            1454.5     1458.6     0.2% Cu      4.1      0.82        0.61            66     0.31        -        1.23
            1192.7     1545.6     0.2% Cu      353       0.1        0.2         12.1       0.28        -        0.45
                                                               Including
            1205.9     1221       0.2% Cu      15.1      0          0.1             22     0.44        -        0.61
            1242.4     1268       0.2% Cu      25.6      0             0        14.3       0.7         -        0.80
                                                               Including
            1242.4     1250.6     0.2% Cu      8.2       0          0.1         25.5        1          -        1.20
                                                                 And
            1260.3     1265.8     0.2% Cu      5.5       0             0        10.9       0.98        -        1.05
 HDS-814    1279.2     1294.8     0.2% Cu      15.5      0          0.1             8.4    0.39        -        0.47
            1302.4     1312.2     0.2% Cu      9.8       0.1        0.2             9.9    0.33        -        0.48
            1315.8     1326.8     0.2% Cu      11        0.2        0.7         19.3       0.6         -        0.97
            1388.4     1399.8     0.2% Cu     11.43      0.4           1        18.5       0.56        -        1.08
                                                               Including
            1388.4     1392       0.2% Cu      3.65      0.6        2.4         43.7       1.24        -        2.33
            1408.5     1418.5     0.2% Cu      10.1      0.2        0.4         11.8       0.4         -        0.65
            1442.3     1476.8     0.2% Cu      34.4      0.5        0.5         17.3       0.35        -        0.78
            1526.1     1539.5     0.2% Cu      13.4      0.2        0.3         42.2       0.43        -        0.87
 HDS-815                                              No Significant Intersection






Date: 24-07-2023 08:00:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story