Quarterly Activities Report for the Period ended 30 June 2018

Orion Minerals Limited
Incorporated in the Commonwealth of Australia
Australian Company Number 098 939 274
ASX share code: ORN
JSE share code: ORN
ISIN: AU000000ORN1
(“Orion” or “the Company”)

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2018

“Figures" referred to throughout this announcement can be viewed on the pdf version of the announcement,
available on the Company's website, www.orionminerals.com.au.

HIGHLIGHTS

-   Resource drilling continues to deliver positive results:
    o 56 massive sulphide intersections in Deep Sulphide Target validate 330 historical results at Prieska
      Project.
    o Drilling of the south-eastern continuation of the Deep Sulphide Target on the Vardocube Prospecting
      Right commenced.
    o Mineral Resource updated with estimate for the Deep Sulphide Target to include drill information from
      the Vardocube Prospecting Right.
    o Data migrated to Geobank geological database.

-   Mine feasibility studies reach significant milestones:
    o Detailed mine designing and scheduling now commenced using the latest Mineral Resources
       estimation models.
    o Metallurgical test-work continues to validate that targeted mineralisation has similar metallurgical
       responses to plant feed that was successfully treated historically.
    o The Mining Right Application was submitted, triggering the commencement of the 300-day mandatory
       review and permit granting process.
    o Design work commenced to reconnect the project site to the national power supply grid via the onsite
       sub-station.

-   Regional Exploration Program initiated:
    o Ground electromagnetic (EM) follow-up surveys and interpretation of results over two SkyTEMTM
      anomaly target areas on the Namaqua-Disawell Prospecting Rights completed.
    o Ground orientation EM survey and interpretation of results over the Jacomynspan Ni-Cu deposit
      completed.
    o Drill targets on the Rok Optel Ni-Cu target established.
    o Field mapping over SkyTEMTM anomalies continued.
-     Safety, environment and community engagement ongoing:
    o Zero Lost time injuries for 89,153 manhours worked at the Prieska Project.
    o Significant environmental permitting progress made at the Prieska Project with the submission of the
      Final Environmental Scoping Report to authorities and the completion of draft environmental
      management plans.
    o Continued co-operation with communities with the Municipal Mayor and Councillors hosted on a
      familiarisation site visit of the Prieska Project.

-  $23M capital raising initiatives during the Quarter:

   o $5.0M raised via placement to Independence Group NL at $0.05 per Share.

$11.25M raised via placements to sophisticated and professional investors at $0.037 per Share, to be
conducted via two tranches. Tranche 1 Shares issued during the Quarter raising $3.4M.

    o   Tranche 2 Shares to raise $7.9M to be issued subject to shareholder approval, to be sought at a
        general meeting to be held on 3 August 2018.
    o   $0.25M to be raised via placement of Shares at $0.037 per Share to the Company’s Chairman, Mr
        Denis Waddell (subject to shareholder approval).
    o   Tembo Capital confirmed its continued support of Orion through subscribing for $6.3M in Shares, at
        an issue price of $0.037 per Share (subject to shareholder approval), with the subscription amount to
        reduce the amount re-payable to Tembo Capital under the Loan Facility.

Operations Report

Orion Minerals Limited (Company or Orion) strives for a sustainable balance of intense operations and strong
focus on social responsibility.

Health and Safety, Environmental Management and Community Engagement
Health and Safety

With high intensity of site work and over 90,000 manhours worked on all sites in the Quarter, health and safety
performance on all Company projects was excellent with no lost time injuries reported for the year to date.

At the Prieska Zinc-Copper Project (Prieska Project), which includes underground activity, the Lost Time
Injury Frequency Rate (LTIFR) per 200,000 manhours worked for the Quarter and year to date were both zero.
These safety metrics compare very favourably against industry averages of 10.32 (annually) and 1.50
(quarterly) respectively.

              Category of Work                                   Hours Worked
                                                          Quarter          Year to Date1
              Exploration                                 86,574              86,574
              Mine Re-Entry                                2,579              2,579
              Total                                       89,153              89,153

Employee education and awareness of health and safety, including related regulations and employee rights,
is an ongoing theme being promoted. During the Quarter, site induction formats were updated by establishing
a formal process for vetting and incorporating sub-contractors’ safe work procedures into project sites’ health
and safety systems.

Engineering inspections, in compliance with the Mines Safety and Health Act, were carried out on all machinery
including drill rigs and lifting equipment operating at the Prieska Project, ensuring all inspected equipment is
in a safe and serviceable condition.

Environmental Management

No environmental incidents were recorded at any of the Company’s projects.

The Quarter saw significant progress made with respect to the environmental impact assessment being
conducted for the Prieska Project. An environmental scoping report was completed and submitted to the
Department of Mineral Resources (DMR) for review. This scoping report describes the broad concepts of the
contemplated mine development plan, along with the manner in which the environmental impact studies will
be conducted. The scoping report is also made available for public review and comment.

Draft versions of the Environmental Impact Report, Environmental Management Program and Integrated Water
and Waste Management Plan were also completed. This suite of reports is a mandatory requirement for
issuance of environmental authorisation before a mine development project can proceed.

All specialist environmental studies for the Prieska Project, including radiological assessments, baseline air
and water quality studies and noise monitoring were also concluded during the Quarter. Post-closure cost re-
estimation and the updating of the environmental management plan for the historical tailings storage facility
(TSF) on the Prieska Project site were done as a precautionary measure to ensure the TSF is maintained in
an environmentally benign condition.

The scope of work for the additional environmental studies required in order to include the recently delineated
southern extension of the Copperton deposit into the Prieska Project mine development plan, is now defined
and planned for execution during the next Quarter (Q3 CY2018).

The year start date is April 2018, being the commencement of the Deep Sulphide resources definition drilling
program.

Final environmental authorisation documentation for the Project is planned to be submitted in September 2018.
Environmental authorisation is then anticipated to be granted by Q3 CY2019.

Monthly dust monitoring in the Prieska Project environs is continuing, as part of the dust management program
implemented at the commencement of the resources definition drilling program.

Environmental performance at all the other regional exploration projects was exemplary, with no detrimental
environmental incidence recorded.

Community Engagement

The Company continues to promote proactively informing and interacting with communities near project sites.
Productive engagement with the Siyathemba Municipal Council, the local government authority for the district
where the Prieska Project is situated, continued, as part of implementing the collaboration Memorandum of
Understanding entered into between the Company and the Municipality.

On 25 April 2018, the Company hosted the Siyathemba Mayor, Councillors and Municipal Managers for a site
visit of the Prieska Project. The visit included a tour of the underground workings, the surface infrastructure
and field trip around the 18 drill rigs engaged in the Deep Sulphide drilling program.

On 31 May 2018, the Company facilitated a visit by representatives of the Siyathemba Municipality and the
Northern Cape Provincial Department of Education to an established EduVOD Learning Centre in KwaMashu,
KwaZulu-Natal Province. This enabled a shared understanding of the potential for the EduVOD satellite
education content solution in Prieska schools.

On 20 June 2018, the Company hosted an informal function in the town of Copperton for local residents during
which Company management provided an update of progress on the Prieska Project.

Discussions with various stakeholders, seeking to secure long-term access to land on which the Prieska
Project will be developed, were initiated and are continuing in good faith.

Exploration and Mine Development
Areachap Belt Projects (South Africa)

The Company continued an intensive drilling campaign at the Prieska Project. Supplementary drilling was
commenced into the Deep Sulphide Target with the aim of upgrading the classification of Mineral Resources,
in compliance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (2012 edition) (JORC Code). This, along with other key studies, will be used as the basis of a
Bankable Feasibility Study (BFS), which the Company aims to complete in Q1 CY2019. The maiden total
Mineral Resource reported for the Prieska Project in February 2018 (refer ASX release 8 February 2018) was
updated with the inclusion of the south-eastern extension of the resource on the Vardocube Prospecting Right
(PR).

Regional exploration on the Masiqhame and Namaqua-Disawell permits continued, with field mapping and
ground EM surveys underway over targets identified from airborne electromagnetic (AEM).

Prieska Project

The Prieska Project remains the focus of the Company’s activities and is at an advanced stage of feasibility
studies.

Project Overview

The Prieska Project covers un-mined dip and strike extensions from a historical underground mining operation.
Mineralisation was delineated by extensive drilling done by the previous owners (Copperton Deposit). The
Company has digitally captured, validated and modelled all relevant project drilling data available from hard-
copy sources. This work has enabled the Company to define targets for near surface mineralisation comprising
oxide, supergene and primary sulphide material to a depth of 100m which are potentially extractable via open
pit mining (+105 Level Target) and the deeper sulphide mineralisation identified by historic drilling (Deep
Sulphide Target). The targets are based on 182 historical drill intersections, which could be relied on for width
and depth of mineralisation, while 88 historical drill holes provided information on the grade of mineralisation.
   
Since the acquisition of the Prieska Project in March 2017, 261 additional drill holes have been digitised from
historic mine plans below the -680m level. While this additional data has shortcomings due to some missing
records, the Company is encouraged by the infill and confirmatory drilling results that continue to validate
interpretation of the historical data set. By 30 June 2018, 56 mother and deflected holes for resource estimation,
and 12 deflections for metallurgical test work had been drilled by the Company in the Deep Sulphide Target.

Mineral Resources estimates for the Copperton deposit were declared in April 2018. Furthermore, with the
appointment of DRA Projects SA Pty Ltd (DRA) as the lead study consultants in July 2017, work has
commenced and is well-advanced, on completing a bankable feasibility study targeting the exploitation of the
deposit.

Deep Sulphide Target drilling

During the Quarter, the Company continued with an intensive drill program which focussed in the north-western
section of the Repli Prospecting Right and the south-eastern section of the Vardocube Prospecting Right,
areas of the Deep Sulphide Target (Figure 1). A total of 67,158m of drilling has been completed on the Deep
Sulphide Target as at 30 June 2018. At the height of activity, 18 surface diamond drill rigs were in operation,
14 of which were drilling on the Vardocube extension of the Deep Sulphide resource (Figure 1). A total of
17,446m of diamond drilling was completed during this Quarter, of which 11,227m was drilled on the
Vardocube Prospecting Right.

The Company drill program aims to provide statistical validation of historic drill data in the Deep Sulphide
Target as well as to infill data points required for optimal drill spacing for a Mineral Resource. Drilling is also
testing new targets and extending known mineralisation outside the historic drill grid.

Drilling results from 13 drill hole intersections targeting the Deep Sulphide Target were announced during the
Quarter (refer ASX release 16 July 2018) (Table 1 and Figures 1, 2 and 3). These intersections are consistent
with previous reported intersections adjacent to these intersections.

By the end of June 2018, the Company had completed 56 mother and deflected holes and received assays
from 53 intersections on the Deep Sulphide target. Intersections in these holes were achieved at vertical depths
of 880m to 1,220m requiring the setting of 355 directional wedges to steer the drilling to pre-determined target
points. At the end of the Quarter, analytical results from 3 more intersections were awaited while 18 holes were
in progress.


                     East           North         From           To         Length       Cu         Zn        Au         Ag
 Drill hole       (WGS84          (WGS84
                                                   (m)           (m)          (m)        (%)        (%)      (g/t)       (g/t)
                    LO23)          LO23)
OCOD064_D1         -68,270       -3,314,574       988.91       1003.45       14.54      0.56       1.06      0.12         4
                   -68,094       -3,314,615       978.62       983.00        4.38       0.80       4.84      0.21         11
                   -68,089       -3,314,614       994.00       1007.72       13.72      1.65       2.31      0.41         17
OCOD068_D4
                                                  997.00       1000.00       3.00       2.59       2.56      0.70         32
                          including
                                                 1005.00       1007.72       2.72       3.35       4.08      0.83         24
OCOD080_D3         -68,405       -3,314,524      1056.70       1060.20       3.50       0.38       4.95      0.08         4
OCOD087_D3         -68,644       -3,314,422      1154.00       1154.75       0.75       0.26       4.33      0.05         4
OCOD096            -68,175       -3,314,354       968.69       974.09        5.40       0.66       2.01      0.09         6
                   -68,178       -3,314,339       950.00       958.00        8.00       1.18       3.57      0.24         15
OCOD096_D1                Including               951.49       958.00        5.51       1.05       4.55      0.23         14
                   -68,178       -3,314,343       944.20       948.00        3.80       0.81       1.89      0.11         8
                   -68,555       -3,314,377      1088.62       1111.68       23.06      1.35       2.70      0.31         12
                                                 1093.00       1097.39       4.39       0.68       4.45      0.09         21
OCOD105_D2
                          including              1097.39       1103.83       6.44       2.17       4.79      0.35         21
                                                 1108.00       1111.68       3.68       2.00       1.74      0.43         15
                      East           North         From           To         Length       Cu         Zn        Au         Ag
  Drill hole       (WGS84          (WGS84
                                                    (m)           (m)          (m)        (%)        (%)      (g/t)       (g/t)
                     LO23)          LO23)
                    -68,311       -3,314,241       890.50       893.00        2.50       3.08       2.97      0.27         26
OCOD115             -68,307       -3,314,235       905.50       912.75        7.25       0.98       3.27      0.09         9
                    -68,298       -3,314,224       936.00       937.60        1.60       0.43       1.79      0.05         3
                    -68,321       -3,314,338      1014.00      1017.30        3.30       0.85       1.67      0.18         6
OCOD116
                    -68,319       -3,314,337      1024.00      1027.00        3.00       1.34       1.71      0.26         13
                    -68,252       -3,314,429      1000.00      1001.00        1.00       0.28       3.43      0.15         8
OCOD117             -68,250       -3,314,429      1005.00      1006.67        1.67       1.45       2.81      0.97         9
                    -68,250       -3,314,428      1012.00      1015.00        3.00       1.79       2.96      0.22         10
                    -68,469       -3,314,309      1040.60      1058.00        16.40      1.08       2.27      0.23         10
OCOD118                                           1040.60      1051.50        9.90       1.08       2.79      0.27         9
                           Including
                                                  1052.17      1058.50        5.83       1.18       1.53      0.16         11
                    -68,444       -3,314,273      1031.70      1040.15        8.45       0.97       2.02      0.21         7
OCOD118-D1                 Including              1034.70      1038.95        4.25       1.23       2.74      0.22         7
                    -68,441       -3,314,271      1045.15      1046.40        1.25       1.09       1.37      0.25         15
OCOD119             -68,270       -3,314,675      1000.50      1002.71        2.21       0.55       4.48      0.11         8


In addition to the on-going infill drilling, the Company has also completed the digital capture and validation of
drilling from historic mine records and has now included a further 79 drill intersections (Figure 2 and Table 2)
to add to the 251 historic intersections in the geological database, bringing the total historical intersections to
330. The newly captured intersections are concentrated in the up-dip extension of the NW Target area where
the Company has targeted its deep drilling campaign since May 2017 (refer ASX release of 16 July 2018).

                     East               North       From          To         Length       Cu         Zn        Au         Ag
  Drill hole       (WGS84              (WGS84
                                                     (m)          (m)          (m)        (%)        (%)      (g/t)       (g/t)
                    LO23)               LO23)
D279                -68 282        -3 314 222       29.44        31.16        1.72       0.11       4.72       N/A        N/A
D286                -67 961        -3 314 580       21.39        22.96        1.57       0.48       2.08       N/A        N/A
D311                -68 139        -3 314 342       93.71       100.17        6.46       0.02       0.06       N/A        N/A
D312                -68 144        -3 314 301       48.06        57.97        9.91       1.67       4.97       N/A        N/A
D339                -67 995        -3 314 538       45.69        55.85        10.16      1.01       1.90       N/A        N/A
D340                -67 964        -3 314 504       31.80        38.30        6.50       0.87       4.24       N/A        N/A
F1092               -67 919        -3 314 577       12.76        14.37        1.61       4.01       1.46       N/A        N/A
F1413               -67 811        -3 314 684       47.40        54.03        6.63       1.85       1.38       N/A        N/A
F1414               -67 800        -3 314 693       71.46        94.82        23.36      2.12       1.50       N/A        N/A
F1442               -67 922        -3 314 595       59.31        62.35        3.04       0.56       5.00       N/A        N/A
F1488               -67 922        -3 314 506       79.59        90.79        11.20      2.20       3.75       N/A        N/A
F1517               -68 181        -3 314 282       55.25        74.52        19.27      0.89       5.33       N/A        N/A
F1527               -67 753        -3 314 716       72.29        80.60        8.31       0.11       0.10       N/A        N/A
F1534               -68 238        -3 314 251       53.61        65.91        12.30      0.81       1.30       N/A        N/A
F1542               -67 821        -3 314 658       69.15        72.90        3.75       0.17       0.98       N/A        N/A
F1555               -67 884        -3 314 584       97.49       129.47        31.98      0.96       4.02       N/A        N/A
F1571               -67 861        -3 314 620       17.04        70.23        53.19      1.11       3.24       N/A        N/A
F1579               -67 935        -3 314 566       44.62        52.08        7.46       0.95       3.39       N/A        N/A
F1580               -67 916        -3 314 556       55.61        67.30        11.69      2.46       3.17       N/A        N/A
F1584               -67 923        -3 314 569       34.11        58.88        24.77      1.34       3.35       N/A        N/A

                  East       North     From     To     Length   Cu     Zn     Au      Ag
  Drill hole   (WGS84      (WGS84
                                       (m)     (m)      (m)     (%)    (%)    (g/t)   (g/t)
                 LO23)      LO23)
F1587           -67 957   -3 314 459   38.32   46.10    7.78    0.97   1.76   N/A     N/A
F1588          -67 964    -3 314 456   28.87   34.00    5.13    2.16   3.82   N/A     N/A
F1590          -67 941    -3 314 489   29.04   34.65    5.61    0.14   1.71   N/A     N/A
F1606          -68 172    -3 314 263   39.76   52.92   13.16    2.44   3.54   N/A     N/A
F1610          -67 970    -3 314 471   54.42   55.57    1.15    0.25   3.19   N/A     N/A
F1611          -67 962    -3 314 457   40.60   43.27    2.67    0.04   0.66   N/A     N/A
F1616          -67 979    -3 314 447   42.10   50.66    8.56    0.75   3.61   N/A     N/A
F1617          -68 004    -3 314 446   53.23   58.17    4.94    0.95   2.54   N/A     N/A
F1619          -67 943    -3 314 504   46.53   48.55    2.02    0.39   1.88   N/A     N/A
F1654          -68 101    -3 314 342   60.17   62.36    2.19    0.65   0.74   N/A     N/A
F1658          -68 116    -3 314 299   18.47   22.99    4.52    0.61   3.83   N/A     N/A
F1668          -68 159    -3 314 298   40.60   46.46    5.86    0.76   3.72   N/A     N/A
F1669          -68 159    -3 314 321   70.55   78.04    7.49    1.20   5.51   N/A     N/A
F1672          -68 180    -3 314 310   61.06   66.57    5.51    1.45   1.01   N/A     N/A
F1673          -68 163    -3 314 297   35.39   40.35    4.96    0.63   3.79   N/A     N/A
F1675          -68 171    -3 314 282   72.29   74.94    2.65    1.67   3.67   N/A     N/A
F1687          -68 215    -3 314 246   36.02   39.76    3.74    1.14   2.77   N/A     N/A
F1689          -68 217    -3 314 253   29.72   36.29    6.57    1.69   2.89   N/A     N/A
F1690          -68 226    -3 314 258   28.70   30.75    2.05    0.57   2.78   N/A     N/A
F1695          -67 935    -3 314 504   11.11   22.18   11.07    2.02   3.70   N/A     N/A
F1709          -68 181    -3 314 278   27.31   29.40    2.09    1.10   5.44   N/A     N/A
F1711          -68 229    -3 314 302   34.80   36.95    2.15    0.27   2.32   N/A     N/A
F1718          -68 188    -3 314 272   39.74   42.12    2.38    1.33   5.53   N/A     N/A
F1727          -68 022    -3 314 392   38.98   55.64   16.66    1.28   1.96   N/A     N/A
F1730          -68 083    -3 314 392   90.94   93.86    2.92    0.83   1.98   N/A     N/A
F1749          -68 007    -3 314 444   34.22   38.97    4.75    2.72   3.42   N/A     N/A
F1753          -68 025    -3 314 377   28.85   47.59   18.74    1.84   2.60   N/A     N/A
F1755          -68 049    -3 314 372   47.88   56.84    8.96    0.99   4.94   N/A     N/A
F1756          -68 082    -3 314 336   35.51   44.34    8.83    1.28   4.47   N/A     N/A
F1775          -67 778    -3 314 702   15.01   26.35   11.34    1.91   2.42   N/A     N/A
F1778          -68 102    -3 314 314   29.76   31.89    2.13    0.89   1.52   N/A     N/A
F1779          -68 130    -3 314 331   95.66   99.04    3.38    2.22   2.55   N/A     N/A
F1780          -68 192    -3 314 259   37.76   39.69    1.93    0.60   3.08   N/A     N/A
F1781          -68 178    -3 314 266   42.89   45.54    2.65    1.15   1.58   N/A     N/A
F1782          -68 199    -3 314 264   27.58   30.43    2.85    1.11   2.90   N/A     N/A
F1783          -68 207    -3 314 269   41.90   43.53    1.63    0.18   7.92   N/A     N/A
F1787          -68 267    -3 314 233   60.62   63.12    2.5     0.52   3.82   N/A     N/A
F1790          -68 181    -3 314 287   33.73   35.33    1.6     0.34   3.38   N/A     N/A
F1804          -67 848    -3 314 667   34.99   37.49    2.5     2.48   1.79   N/A     N/A
F1805          -67 826    -3 314 665   32.34   34.83    2.49    4.59   3.00   N/A     N/A
F1819          -67 876    -3 314 589   21.41   48.02   26.61    2.13   4.19   N/A     N/A
F1828          -67 995    -3 314 480   22.83   25.89    3.06    1.17   2.77   N/A     N/A
F1883          -68 140    -3 314 299   16.85   22.33    5.48    0.99   3.28   N/A     N/A
F1884          -68 141    -3 314 297   14.57   22.15    7.58    1.08   1.32   N/A     N/A

                          East               North     From     To        Length       Cu         Zn       Au         Ag
  Drill hole           (WGS84              (WGS84
                                                       (m)      (m)         (m)        (%)       (%)       (g/t)      (g/t)
                         LO23)              LO23)
F1886                   -68 147           -3 314 336   42.71   52.94       10.23      1.20       2.19      N/A        N/A
F1887                   -68 131           -3 314 306   41.11   45.82        4.71      0.63       3.07      N/A        N/A
F1890                   -68 069           -3 314 391   45.77   48.75        2.98      1.62       3.08      N/A        N/A
F1892                   -68 020           -3 314 402   37.12   47.76       10.64      1.61       3.21      N/A        N/A
F1893                   -68 050           -3 314 418   32.33   34.16        1.83      0.64       0.74      N/A        N/A
F1894                   -68 028           -3 314 422   42.63   47.01        4.38      1.55       2.08      N/A        N/A
F1895                   -68 031           -3 314 474   30.08   31.70        1.62      0.39       1.29      N/A        N/A
F1897                   -68 004           -3 314 502   39.38   42.80        3.42      0.01       0.02      N/A        N/A
F1899                   -67 967           -3 314 488   31.07   72.77        41.7      1.40       3.03      N/A        N/A
F1947                   -68 044           -3 314 450   48.42   51.36        2.94      0.02       0.02      N/A        N/A
F1980                   -67 895           -3 314 575   26.41   33.56        7.15      0.70       4.14      N/A        N/A
F1983                   -67 978           -3 314 451   61.51   66.61        5.1       0.47       3.25      N/A        N/A
F2024                   -68 022           -3 314 411   71.71   73.57        1.86      0.41       0.82      N/A        N/A
F2029                   -67 992           -3 314 457   26.45   29.66        3.21      0.32       3.54      N/A        N/A
F2054                   -68 303           -3 314 236   29.12   43.67       14.55      1.22       3.29      N/A        N/A

Mineral Resource Estimation and Reporting

The total Mineral Resource for the Prieska Project, comprising both the Deep Sulphide and the +105 Level
Mineral Resources has been updated with historical drill information from the south-eastern extension of the
Deep Sulphide resource on the Vardocube Prospecting Right area (refer ASX release 9 April 2018) (Table 3).

Mineral Resource reported in Orion ASX release of 9 April 2018: “Prieska Project total Mineral Resource
increases to 29.4 million tonnes containing 1.13 million tonnes Zn and 0.36 million tonnes Cu” available to the
public on orionminerals.co.au /investors/market news. Competent Person Orion’s exploration: Mr. Errol Smart.
Competent Person: Orion’s Mineral Resource: Mr. Sean Duggan. Orion is not aware of any new information
or data that materially affects the information included above. For the Mineral Resource, the company confirms
that all material assumptions and technical parameters underpinning the estimates in the Orion ASX release
of 8 February 2018 continue to apply and have not materially changed. Orion confirms that the form and
context in which the Competent Person’s findings are presented here have not materially changed.

All drill hole survey and geological logging data to 14 May 2018 have been successfully imported into a new
Geobank database. The importation of the remainder of the data and a full migration from an old Access
database to the new solution will take place during the next Quarter (Q3 CY2019).

Feasibility Studies

Project study work focused on detailed mine design and determining the production output for the planned
underground operation. Metallurgical test results continue to validate that the remaining Mineral Resource has
metallurgical continuity with the ore previously processed. Bench scale testwork confirmed comparable mineral
processing performance with that achieved during the historical mining operations, with marketable copper
and zinc concentrates produced2.

Trade-offs and investigations into the best strategy for de-watering the underground workings continue, with
the preferred arrangement now being the use of a cascading system of conventional pumps, set up in a manner
that permits the setup to remain in use over the potential mine life.

The feasibility study team, led by DRA, was augmented by the co-option of Fraser McGill Mining and Minerals
Advisory, METC Process Engineering Consultants and Mining Engineering and Technical Services at Shaft
Sinkers Pty Ltd (METS), to conduct mining, ore processing and shaft refurbishment trade-off studies,
concurrent to the main feasibility study work streams.

2   Refer ASX release 12 June 2018.

Mine Design

Preliminary mine designs are being done using interim model estimates of the deposit’s extractable mineral
resources. Various mining methods are being considered with a combination of longhole open stoping (LHOS)
and Drift and Fill mining being preferred. A Mining Right Application was submitted in April 2018 based on a
conceptual mine layout, employing a combination of LHOS and Drift and Fill mining with paste fill support 3.
Design work is now focusing on determining an optimum mining rate to improve the Project’s economics. Initial
stoping layouts indicate that the majority of the deposit targeted for extraction by underground mining is
amenable to LHOS without fill. The LHOS method has a low unit operating cost and so emphasis is being
placed on minimizing the requirements of filling or drift and fill mining.

Significant progress has been made on underground ventilation design, with a preliminary ventilation layout
compiled for the production rates being considered. Ventilation simulation software has been used to confirm
that the existing shaft arrangements can accommodate required ventilation volumes. A schematic of one
conceptual layout under investigation is shown below:

Design work also commenced on the rock handling arrangements incorporating the existing tunnel
infrastructure and conveyor layouts. A trade-off study is underway comparing a truck hauling strategy with a
truck-rail combination option. The rail option can potentially make use of existing rail haulages and ore-passes
that may prove to be beneficial in respect of leveraging off available infrastructure. The following diagram
shows the existing infrastructure around the main Hutchings shaft which is being incorporated into the various
rock-handling scenarios.

Shaft De-watering

Several dewatering layouts were investigated during the Quarter, including the use of either a single-lift
submersible pumping assembly or a more conventional cascading pumping arrangement. This latter layout
would make use of two pre-existing pump chambers within the mine workings, along with five new temporary
pump chambers that would be set-up at various intervals down the main hoisting shaft.
In investigating the latter option, an underground inspection was carried out on the pump chamber at the 310-
metre level and the settlers and water storage dams were found to be in very good condition. Two multi-stage
pumps would likely be proposed for use if this option is selected. These pumps would be installed on floating
pontoons within the shaft to pump via 250 mm columns, to the 310-metre chamber where additional pumps will
be permanently installed to pump to surface. Figure 6 shows the top of the settlers and the solid ground
conditions of the pump chamber.

Ore processing investigations

Following on from the open-cycle testing that was carried out in Quarter 1, locked-cycle testing was
commenced during Q2 CY2018 and is due for completion by Q3 CY2018. Locked-cycle tests are laboratory
scale flotation tests designed to represent a commercial scale plant operation. Locked-cycle tests are part of
the advanced stages of metallurgical testing. The tests were carried out on composite samples representing a
blend comprising 50% of material from the north-western area of the deposit and 50% from the south-eastern
area. This blend is intended to characterise the expected mix of head feed from the planned mining operation.

Recoveries of copper into marketable concentrates ranged between 80% to 86%, whilst those for zinc ranged
between 91% and 94%. These recoveries and concentrate qualities achieved are in line with historical
performance4. Graphs of the copper and zinc recovery tests (FS blend #1) are shown below which compares
the test results with historical pilot plant and operational results.

The copper concentrate grades resulting from the locked-cycle tests were in the region of 21% to 24%, whilst
the zinc concentrate grades ranged from 45% to 54% which are both saleable products. Current indications
are that zinc recoveries are unlikely to benefit further from additional cycles, while copper recoveries and
qualities also have further opportunity for optimisation.

Infrastructure

Power Supply – Eskom, the national power supply entity, has recommended that the Company carry out a
self-build program for the Cuprum substation upgrade required to support future mining operations. The
Company has commissioned a specialist electrical engineering consulting company to carry out the design
and costing of the proposed upgrade which is required to meet Eskom’s specifications. An initial meeting has
been held with Eskom representatives to confirm various options around the upgrade and to understand
Eskom’s future expansion plans for the area and its approval and quality assurance processes. The aim is to
design a modular expansion to meet the Project’s increasing electrical power requirements over time. The
design and costing exercise is expected to be completed by Q3 CY2018.

Water Supply – Negotiations with the Siyathemba Municipality and other stakeholders to obtain long-term
access to the Prieska waterworks and pipeline continued. The water supply infrastructure currently delivers
water from the Orange River to the project site and neighbouring land users. Draft Memorandums of
Understanding are being reviewed by all parties to the negotiations.

Product Logistics and Marketing

Investigations into trucking, rail and shipping options for the concentrate logistics have been advanced
throughout the Quarter. There are currently two rail options being considered for transporting concentrate to
port using either rail from Kimberley (300 km from site) or Groveput (48 km from site). Trucking would be used
from site to either rail depot. Kimberley is a larger transport hub with proven reliability on schedules and has
scale of economies cost-wise. Groveput would reduce trucking distances and interactions with local traffic and
the general public. Groveput is however a smaller depot with lower volumes compared to Kimberley and it is
likely to introduce more risk around schedule reliability and unplanned delays. Both rail options are based on
containerised concentrate to the port. Studies are continuing on the two options although Kimberley is currently
the favoured solution.

Trucking options with containerised and bulk transport are being investigated. Containerised loading of the
concentrate from site is expected to provide a more seamless transport system across the various handling
interfaces. With this option, container handling and stacking equipment will be required at site and a suitable
inventory of containers will be required across the logistics chain from site to the smelters.

Work has commenced on designing the processing plant concentrate discharge arrangements with both the
container and bulk transport systems being considered.

Based on preliminary cost estimates, the Port of Coega, near Port Elizabeth, is favoured, with the Port of Cape
Town a strong second alternative for export of concentrates. Site visits to Coega, Kimberley and Groveput rail
heads were conducted by the Project team. Visits to European smelters are planned for the coming Quarter
to understand offshore logistics and the concentrate market. The complete product logistics solution is planned
for completion by Q4 CY2018.

Mining Right Application

The application for a Mining Right for the Prieska Project was submitted to the Department of Mineral
Resources (DMR) this Quarter5. Receipt of the application has been formally acknowledged by the DMR,
signifying the start of the prescribed 300-day review and approval process.

Regional Exploration (South Africa)

Overview of Regional Activity

With the completion of the Agama transaction in March 2017, the focus of the Company has been on rapidly
advancing the Prieska Project through feasibility studies towards a development decision point. The Company
maintains a substantial and prospective landholding in the Areachap Belt (Figure 9) and is applying increasing
attention to exploration for both Volcanogenic Massive Sulphide and Ni-Cu PGE deposits to the north of the
Prieska Copper Project. The Areachap Belt is analogous to other Proterozoic Mobile Belts with major VMS
and magmatic Ni-Cu-Co-PGE deposits.

Volcanogenic Massive Sulphide (VMS) deposits almost always occur as “clusters” associated with volcanic
centres. Four such centres have been identified in the Areachap Belt. The Company’s prospecting and mining
rights include the bulk of the Copperton and Boksputs Volcanic Centres. Further details of the work programs
will be released as they are designed and implemented, with results to be released as they are received.

Similarly, world-class nickel deposits occur in clusters for example, Sudbury, Duluth, Pechenga and Voisey’s
Bay. Several mafic intrusive bodies with known nickel and related mineral occurrences are known to cluster
on the Namaqua-Disawell Prospecting Rights (Figure 9). EM geophysical methods are useful for exploring for
both VMS and Magmatic Ni-Cu types of deposits.

5   Refer ASX release 9 April 2018.

Regional exploration on the Masiqhame and Namaqua-Disawell permits continued, with Fixed Loop Time
Domain Electromagnetic (FLTDEM) surveys and field mapping underway on targets identified from airborne
electromagnetic (AEM) surveys.

Geophysical surveys

Modern EM methods have advanced a great deal since the last systematic exploration took place in the
Areachap Belt and the Company stands to benefit from its approach to use the latest EM techniques in its
regional exploration program.

The Company completed an extensive AEM and magnetic survey over a large portion of the Company’s
Masiqhame and Namaqua-Disawell Prospecting Rights during the March 2018 Quarter (Q1 CY2018) (Figure
10, refer ASX release 1 February 2018).

During this Quarter, work focussed on ground EM follow-up on the AEM targets. Equipment used is a best-in-
class EM receiver manufactured in Perth, Western Australia, by Electromagnetic Technologies. The current
source is a custom-built Time Domain Electromagnetic (TDEM) transmitter, capable of transmitting 140 Amps
into a 1km by 1km aluminium wire loop. This current source is coupled with military-grade fluxgate sensors.
Readings are taken every 50 to100m on grid lines spaced 200m apart. A total of 10 loops with 1,061 stations
were surveyed for the Quarter.
Masiqhame Project

Overview

This project is defined in terms of the Masiqhame tenement holding and includes Kantienpan, Boksputs and
Van Wyk’s Pan zinc copper mineral occurrences (Figure 10) and has regional potential for VMS zinc- copper
and nickel sulphide mineralisation.

SkyTEMTM anomalies associated with a paleo sea floor setting

AEM anomalies identified during a preliminary review of the SkyTEM TM data by the Company’s Perth based
geophysical consultants, Southern Geoscience Consultants, were prioritized for follow-up EM work. Fifteen
anomalies were interpreted to coincide with a paleo sea floor setting and are considered VMS type targets
(Figure 11). The paleo sea floor position was interpreted from available regional geological data and field
mapping. The paleo sea floor setting forms the target stratigraphic horizon for VMS type deposits. Anomalies
in the northern part of the Masiqhame Prospecting Right are spatially associated with known Zn–Cu VMS
deposits at Kantienpan and Boksputs. This include anomalies K1, K 2, and B1 to B4 (Figure 11). These mineral
deposits are considered poorly explored.

Work on the Masiqhame Prospecting Right for this Quarter consists of data interpretation and field mapping.
Mapping started in the north of the prospecting right, with known VMS style mineralisation. Mapping over
anomalies B1 to B3 shows the anomalies to be underlain by schist and quartzite of the Sprigg Formation, close
to the contact with meta volcanic rocks off the Jannelsepan Formation and is considered a favourable setting
for VMS deposits.

Planned work on the Zn-Cu targets

Ground EM surveys are planned to start in July in the Boksputs area over Anomaly B4, which is completely
sand covered, and Anomaly BS1, where outcrops of ferruginous chert, characteristic of distal exhalites forming
within VMS mineralising systems, are identified on outcrop (Figure 11).

Namaqua - Disawell Project

VMS Zinc-Copper and Nickel-Copper-Cobalt-PGE Targets

This project is defined in terms of the Namaqua and Disawell tenement holdings and includes the
Jacomynspan Ni-Cu-Co-PGE and Rooiputs Zn–Cu Deposits (Figure 9) and has regional potential for VMS
zinc-copper and Magmatic Nickel sulphide mineralisation.

VMS Zinc-Copper

Historic exploration on the Namaqua and Disawell Rights focussed mainly on Cu-Ni mineralisation. However,
reconnaissance mapping revealed some of the SkyTEM TM anomalies to overlay outcrops of supracrustal rocks,
making them VMS targets rather than Magmatic Ni-Cu targets.
Ground TDEM surveys were carried out over VMS targets HP3, HP4 and HP5 (Figure 12). Two loops were
surveyed over anomaly HP3 which has a 2,800m strike extent SkyTEM TM anomaly. The survey detected a
broad formational conductor at depth that cannot be explained by lithologies found in outcrop. Drilling will be
required to explain this conductor.

Modelling of ground TDEM data over Anomaly HP4 indicates the presence of a broad conductor of large areal
size (>1000 x 1000m). Conductance ranges from weak to moderate in strength (100 to 300S). Anglovaal
drilled two holes in the vicinity of HP4, both holes of which intersected graphite, which is known as a good
conductor. The Anglovaal boreholes need to be ground located before a final decision can be made regarding
the exploration potential of this target.

Ground TDEM data over anomaly HP5 (Figure 12) shows two discrete local bedrock conductors of
approximately 250 x 250m and 400 x 150m size. Conductance levels were low to moderate with readings of
100 to 300S. Conductor depths are estimated at 75 to 125m below surface. The conductors dip north-east at
30 to 40º. Although outcrops in this area is poor the up-dip projection of the conductors will be mapped, and
should the mapping not explain the conductors, diamond drilling will be required.

Magmatic Ni-Cu-Co

The Jacomynspan intrusive complex shares many characteristics to other late-tectonic intrusions emplaced
into orogenic margins globally. These include moderate to deep-seated, late-stage, post-peak deformation
emplacement, complex magma emplacement history indicative of a long-lived conduit, and indications of a
multi-phase mineralisation history that has good potential for forming massive sulphide deposits. The complex
hosts sulphide mineralisation throughout its extent within all recorded lithologies except for a volumetrically
subordinate footwall harzburgite unit. The sulphidic harzburgite unit contains higher tenor Cu – Ni
mineralisation than the earlier, low temperature metamorphosed pyroxenite, which it intrudes. The sulphide
mineralisation has been derived from primary magmatic processes that, although intimately related, reflect
different conditions within the flowing magma conduit. The Company is targeting the higher-grade net-textured
and massive sulphide mineralisation.

The Jacomynspan Deposit was first identified by Anglo American Prospecting Services (AAPS) with drilling
carried out along a 4km strike length. Resource drilling was carried out to a depth of 900m over 1.3km of the
strike by AAPS. Disseminated nickel sulphide mineralisation was intersected with widths varying between 30
to 70m (refer ASX release 14 July 2016).

The Company believes a substantial exploration opportunity exists within the project area to search for higher
grade, massive and semi-massive accumulations of nickel-bearing sulphides, analogous to the Nova-Bollinger
deposit in the Fraser Range Province of Western Australia.

During the Quarter, the following work was completed on the Ni–Cu project on the Namaqua – Disawell
Prospecting Rights:

    - Selection of SkyTEMTM anomalies for follow-up work.
    - Reconnaissance mapping over SkyTEMTM targets.
    - An orientation FLTDEM survey over the Jacomynspan deposit.
    - FLTDEM surveys over five loops in two target areas.
    - Modelling of the FLTDEM surveys and planning of drill holes.
    - Compilation of a GIS database.

Ongoing work includes:

   - Drill testing of FLTDEM conductors.
   - Target generation - interpretation of data.

Ground EM surveys over Ni-Cu targets
A single FLTDEM loop was surveyed over the Jacomynspan deposit as an orientation survey. Three FLTDEM
loops were surveyed over SkyTEMTM conductors at the Rok Optel Prospect and two loops over Area 4 (Figure
12).

The Jacomynspan orientation survey resulted in plate models that closely fit the 70m thick mineralised zone,
proving the suitability of the FLTDEM method to detect this style of mineralisation (Figure 13). Conductance
over the Jacomynspan deposit is low to moderate at 250 to 575 S.

Conductors on Rok Optel have conductivities greater than 3000 S. The position of the Rok Optel conductors
relative to historic drill holes are shown in Figure 14. Most historic drill holes which tested induced polarisation
(IP) and magnetic targets did not intersect the zones of highest conductance detected in the Company’s
surveys. The drilling intersected zones of lower conductance on the edges of the new modelled plates (Figures
14 and 15). Historic drill hole PUD003 intersected 23.12m at 0.32% Ni and 0.28% Cu from 294m including
5.92m at 0.46%Ni and 0.35% Cu from 303m and 1.8m at 0.58% Ni and 0.60% Cu from 306m (Figure 15).

Area 4 was surveyed using two grids, A4A and A4B (Figures 12 and 16). Seven plate models of conductance
ranging from 350 to 2000 S, with smaller dimensions characteristic of semi-massive to massive sulphide
mineralisation within or on margins of disseminated sulphide mineralisation have been modelled (Figure 17).
Drilling by previous companies targeting geochemical, magnetic and IP targets did not test the highly-
conductive bodies detected by the Company using FLTDEM (Figures 16 and 17). The plates on Grid A4B lie
within 100m of known Ni-Cu sulphide mineralisation intersected in historic drill hole JAC007. The hole
intersected 62.5m of sulphide mineralisation at 0.26% Ni and 0.17% Cu from 304m (Figure 17).

Planned work on the Ni-Cu targets
Drill testing of the EM conductors on the Ni–Cu prospects is ongoing at the time of writing. Three holes totalling
1,325m are planned to test the Ni-Cu targets on Rok Optel (Figure 18).

Marydale Gold-Copper Project

This project is defined in terms of the Agama: Rich Rewards tenement holding and includes the known
Marydale Gold-Copper Deposit.

In addition to the Prieska Project, the Agama transaction gives the Company exploration rights over the
Marydale Gold-Copper Project located 60km north of the Prieska Project (Figure 9).

Past work by the Company includes an IP survey over 2.6km strike following the target horizon. The Company
drilled two holes within the historic drill grid, that confirms the copper-gold mineralisation, and four holes on IP
anomalies. Drilling showed the IP response to be caused by broad zones containing disseminated sulphides
with low levels of copper and gold mineralisation.

The Company is currently planning follow-up exploration on the Marydale Gold–Copper Project.

Connors Arc Epithermal Gold Project (Queensland)

During the Quarter, no work was undertaken at the Connors Arc Project due to the fast tracking of drilling and
the BFS at the Prieska Project. The Company announced on 2 May 2018 a binding sale agreement with
Evolution Mining Limited for 100% interest sale of the Connors Arc Project, refer to the Corporate section for
more information.

Fraser Range - Nickel-Copper Projects (Western Australia)

Orion maintains a sizeable tenement package in the Fraser Range Province of Western Australia which
Independence Group NL (ASX: IGO) is currently earning in to via a Joint Venture Agreement (JVA, refer ASX
release 10 March 2017).

As stated in previous Quarterly Reports, IGO is completing a major regional scale interpretation of the
geological framework of the Albany-Fraser Orogen based on first pass aircore drilling (principally used to
improve the understanding of the bedrock geology in the project area) and high resolution geophysical data
including a regional scale Spectrem airborne EM survey.

The regional scale work is also enabling areas with lower prospectivity, either due to the underlying geology
or the depth of transported cover, to be identified and relinquished so that exploration can focus on the most
prospective areas.

In addition to the regional scale surveys, a ground EM survey was completed on parts of the Orion tenements
where VTEM and aircore geochemistry anomalism has previously been identified.

Under the JVA, IGO is responsible for all exploration on the tenements and provides regular updates to Orion
of its activities and results arising from them. No material results were received during the Quarter.

Walhalla Gold and Polymetals Project (Victoria)

During the Quarter, the Company did not carry out any exploration activity on the Walhalla Project.
Tenement Schedule

                                            Ownership
       Tenement                 Project                 Change in Quarter    Joint Venture Partner
                                             Interest
South Africa

NC30/5/1/1/2/10445PR      PCM                73.33%                          ---
                                                           Mining Right
NC30/5/1/1/2/10138MR      PCM                73.33%        Application
                                                           Submitted
NC30/5/1/2/2/10244PR      Marydale           73.33%             ---          ---
NC30/5/1/1/2/11841PR(1)   Vardocube          70.00%         Executed         ---
NC30/5/1/1/2/11850PR(1)   Bartotrax          74.00%         Executed         ---
                          Namaqua-                                           Namaqua Nickel Mining (Pty)
NC30/5/1/1/2/10032MR                         18.50%            ---
                                Disawell                                           Ltd
                          Namaqua-
NC30/5/1/1/2/10938PR                         18.50%            ---           Disawell (Pty) Ltd
                                 Disawell
                          Namaqua-
NC30/5/1/1/2/11010PR                         18.50%            ---           Disawell (Pty) Ltd
                                 Disawell

NC30/5/1/1/2/816PR        Masiqhame          49.00%            ---           Masiqhame 855 (Pty) Ltd

Western Australia
E28/2367                  Fraser Range        30%              ---           Independence Group NL

E28/2378                  Fraser Range        30%              ---           Independence Group NL

E28/2462                  Fraser Range        30%              ---           Independence Group NL

E28/2596                  Fraser Range        30%              ---           Independence Group NL

E39/1653                  Fraser Range        35%              ---           Independence Group NL &
                                                                             Geological Resources Pty
E39/1654                  Fraser Range        10%              ---           Ltd
                                                                             Independence Group NL &
                                                                             NBX Pty Ltd
E69/2379                  Fraser Range        10%              ---           Independence Group NL &
                                                                             Ponton Minerals Pty Ltd
E69/2380                  Fraser Range        10%              ---           Independence Group NL &
                                                                             Ponton Minerals Pty Ltd
E69/2707                  Fraser Range        10%              ---           Independence Group NL &
                                                                             Ponton Minerals Pty Ltd
Queensland
EPM19825                  Connors Arc         100%             ---           ---
EPM25122                  Connors Arc         100%             ---           ---
EPM25283                  Connors Arc         100%             ---           ---
EPM25703                  Connors Arc         100%             ---           ---
EPM25708                  Connors Arc         100%             ---           ---
EPM25712                  Connors Arc         100%             ---           ---
EPM25714                  Connors Arc         100%             ---           ---
EPM25763                  Connors Arc         100%             ---           ---
EPM25764                  Connors Arc         100%             ---           ---
EPM25813                  Connors Arc         100%             ---           ---
                                                                Ownership
                Tenement                              Project               Change in Quarter   Joint Venture Partner
                                                                 Interest
 EPM26081                                       Connors Arc       100%             ---          ---
 EPM26082                                       Connors Arc       100%             ---          ---
 EPM26083                                       Connors Arc       100%             ---          ---


 Victoria
 MIN5487(2)                                     Walhalla          100%             ---          ---
 EL5340                                         Walhalla          100%             ---          ---
 EL5348                                         Walhalla          100%             ---          ---
 (1)       Execution of Mining Right pending.
 (2)       MIN 5487 has been sold to Centennial Mining Ltd.

Corporate

Cash and Finance
Cash on hand at the end of the Quarter was $4.8M.

Following Quarter end, the Company received $2.0M cash from Evolution Mining Limited as part of the
consideration for the sale of the Connors Arc Project (refer below).

Capital Raising

On 25 June 2018, the Company announced an $11M capital raising at an issue price of $0.037 per fully paid
ordinary share (Share), to be conducted via a placement to sophisticated and professional investors
(Placement). One of the members of the Company’s Broad Based Black Economic Empowerment Partner in
South Africa also subscribed for $0.25M in Shares which will be included in Tranche 2 at an issue price of
$0.037 per Share.

The Placement will be conducted via two stages, being:

   - Tranche 1 – On 29 June 2018, the Company issued 91.6M Shares at $0.037 per Share to raise
       $3.39M. The Shares issued pursuant to Tranche 1 did not require shareholder approval under the
       ASX Listing Rules as they were issued pursuant to the Company’s placement capacity under ASX
       Listing Rule 7.1. However, ratification of the issue will be sought from shareholders at a general
       meeting (refer below), to allow for future equity fundraising flexibility; and
  -    Tranche 2 – 212.5M Shares to raise $7.86M (subject to shareholder approval, to be sought at a general
       meeting to be held on 3 August 2018).

In addition, the Company will also seek shareholder approval at the General Meeting pursuant to ASX Listing
Rule 10.11 to enable the Chairman, Denis Waddell, to subscribe for 6.8M Shares at the same issue price as
the Shares being offered under the Placements to raise $0.25M.

Proceeds from the Placement will be used principally to finalise the bankable feasibility study on the Company’s
flagship Prieska Project, which is scheduled to be completed early 2019. Funds will also be used to continue
exploration programs on the Company’s highly prospective tenements located in the Northern Cape, South
Africa and for working capital.

Tembo Capital

In addition to the Placement, Tembo Capital Mining Fund II LP and its affiliated entities (Tembo Capital), has
confirmed its continued support of the Company through subscribing for $6.3M in Shares, at an issue price of
$0.037 per Share, being the issue price for Shares issued under the Placement. The issue of Shares to Tembo
Capital will be subject to shareholder approval in accordance with ASX Listing Rule 7.1 and will occur in two
stages being:

       -       102.7M Shares, resulting in Tembo Capital's shareholding increasing to 19.99%; and
       -       70.2M Shares, resulting in Tembo Capital's shareholding increasing to 22.99%, in reliance on the 3%
               creep exemption available under item 9 of section 611 of the Corporations Act.

The Company announced on 18 August 2017 that it had entered into a loan facility agreement with Tembo
Capital, pursuant to which Tembo Capital has advanced $6M in funds to the Company (excluding capitalised
interest and fees) (Loan Facility). On 31 May 2018, the Company announced an extension to the term of the
Loan Facility from 31 May 2018 to 30 September 2018. The extension to the term of the Bridge Loan relieved
the Company of its requirement to repay the loan by 31 May 2018. At the end of the Quarter, $6.0M had been
drawn down against the Loan Facility (excluding capitalised interest and fees).

The Company has agreed with Tembo, that Tembo Capital’s Share subscription will be issued in consideration
for reducing the amount re-payable to Tembo Capital under the Loan Facility at a deemed issue price of $0.037
per Share, being the same issue price as the Shares being offered under the Placements. The balance of the
Loan Facility will be reduced by $6.3M (being the value of Shares subscribed for by Tembo). The balance of
the Loan Facility (including accrued interest) following this repayment will be approximately $0.6M.

General Meeting

The Company will seek the required shareholder approvals for the capital raising at a General Meeting of
shareholders planned to be held at RSM Australia Pty Ltd, Level 32, 2 The Esplanade, Perth, Western Australia
on Friday, 3 August 2018 commencing at 3:00 p.m. (Perth time).

Independence Group Placement

On 18 May 2018, the Company announced that it had taken another important step in its base metal
development strategy in South Africa after entering into an agreement with Independence Group NL (IGO),
that saw the leading mid-tier miner and explorer become a substantial shareholder in the Company and
cementing a collaborative working relationship between the two companies.

The Company entered into an agreement with IGO, for IGO to subscribe for a placement of Shares in the
Company at $0.05 per Share, to raise $5.0M (IGO Placement). On 21 May 2018, the Company announced
that it had received $5.0M from IGO and had issued 100M Shares to IGO at $0.05 per Share.

The agreement also sets out the terms of an agreed collaborative working relationship between the two parties,
whereby IGO has secured matching rights to any potential joint venture or sale of the Company’s nickel
projects located in the Areachap Belt, South Africa. If the Company wishes to assign the whole or any part of
its right, title or interest in any of its South African Nickel Projects (located within a defined area of the Areachap
Belt) to a third party, it must first offer to assign such interest to IGO on the same terms and conditions as the
proposed terms and conditions of the assignment to the third party.

IGO’s preferential rights include the Company’s advanced Jacomynspan Nickel-Copper-Cobalt Project, where
the Company has announced a JORC compliant Mineral Resource estimate (refer ASX release 8 March 2018).
The collaborative working relationship formed between the Company and IGO will also enhance the
Company’s planned regional exploration programs within the highly prospective yet very much under explored
Areachap Belt.

Due to the lack of favourable environments world-wide which have the potential to host major new Nickel-
Copper-Cobalt and VMS discoveries, the Company’s large ground holdings in the Northern Cape of South
Africa provides both the Company and IGO significant exposure to exploration success.

Based on regional exploration programs already completed, the Company has identified the potential for
discovery of nickel hosting massive sulphide bodies similar to IGO’s Nova Bollinger Mine in the Fraser Range,
Western Australia in the Areachap Belt (refer ASX releases dated 14 July 2016 and 8 March 2018). The
Company intends to commit a minimum amount equivalent to 30% of the $5M IGO Placement (being $1.5M)
towards its Nickel-Copper-Cobalt exploration targets.

The IGO Placement and IGO’s preferential rights further strengthen the existing relationship between the
Company and IGO, following the Company’s announcement on 10 March 2017 that the Company and IGO
had entered into a joint venture agreement on the Fraser Range Nickel-Copper Project, Western Australia and
that IGO had subscribed for a $1.3M share placement in the Company.

Sale of Connors Arc Project

On 2 May 2018, the Company announced that it had entered into a binding sale agreement (Agreement) with
Evolution Mining Limited (Evolution), for Evolution to acquire 100% of the Company’s Connors Arc Project
(Tenements) in Queensland. Consideration for the sale of the Tenements consists of $2.5M cash and a 2%
royalty on net smelter returns (NSR) from the sale of gold recovered and sold by Evolution from the Tenements
to a value of $5.0M.

Key terms of the Agreement are:

  -   Stage 1 Payment - an initial $1.5M cash payment, payable upon conditions typical for agreements of
      this nature being:

       o    the Company obtaining indicative approval from the Queensland Government Department of
            Natural Resources, Mines and Energy (Department), for the transfer of the Tenements to
            Evolution; and
       o    the assignment to Evolution of the Tenements’ native title agreements.

  -   Stage 2 Payment - a further $0.5M cash payment, payable to the Company upon approval by the
      Department for retention of the total area of three of the Tenements included in the Agreement until the
      renewal of the existing term of those Tenements;
  -   Stage 3 Payment - a further $0.5M cash payment, payable to the Company upon approval by the
      Department for renewal of two Tenements included in the Agreement and for retention of the total area
      of those Tenements for a period 12 months from the date of such renewal; and
  -   a 2% royalty on NSR from the sale of gold recovered and sold by Evolution from the Tenements to a
      value of $5.0M.

Following Quarter end, the Company received Stage 1 Payment and Stage 2 Payment, totalling $2.0M cash.

The sale of the non-core Tenements is consistent with the Company’s decision to place greater focus on its
flagship project, the Prieska Project and its highly prospective regional exploration projects within the Areachap
Belt, including the advanced Jacomynspan Nickel-Copper-Cobalt Project.

Board Changes

Mr Michael Hulmes joined the Company’s Board on 17 April 2018 as a Non-executive Director. Following Mr
Hulmes’ appointment, the Company also advised that Mr William Oliver stepped down as a Non-executive
Director, effective 18 April 2018, in order to focus on his other business interests.

Expiry of Options

The following options expired during the Quarter:

                    Exercise Price                         Number of Options                Expiry Date
                         $0.15                                  9,000,000                   31 May 2018
                         $0.25                                  9,000,000                   31 May 2018
                         $0.35                                  9,000,000                   31 May 2018
                         $0.15                                  1,000,000                 30 April 2018
                         $0.25                                  1,000,000                 30 April 2018
                         $0.35                                  1,000,000                 30 April 2018

30 July 2018

Errol Smart
Managing Director and CEO

ENQUIRIES

Investors                                                  JSE Sponsor
Errol Smart – Managing Director & CEO                      Rick Irving
Denis Waddell – Chairman                                   Merchantec Capital
T: +61 (0) 3 8080 7170                                     T: +27 (0) 11 325 6363
E: info@orionminerals.com.au                               E: rick@merchantec.co.za
Media
Michael Vaughan                        Barnaby Hayward
Fivemark Partners, Australia           Tavistock, UK
T: +61 (0) 422 602 720                 T: +44 (0) 207 920 3150
E: michael.vaughan@fivemark.com.au     E: orion@tavistock.co.uk

Suite 617, 530 Little Collins Street
Melbourne, VIC, 3000

Date: 30/07/2018 08:45:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story