Wrap Text
Resource Infill Drilling Programme at Bengwenyama
Southern Palladium Limited
Incorporated in the Commonwealth of Australia
Australian Company Number 646 391 899
ASX share code: SPD
JSE share code: SDL
ISIN AU0000220808
(“Southern Palladium” or “the Company”)
Resource Infill Drilling Programme at Bengwenyama
Key highlights:
• Drilling contract awarded to Geomech Africa (Pty) Ltd
• Phase 1, 63-hole (24,464m) diamond drill programme at the Bengwenyama Project to commence mid-
July 2022
• Phase 1 infill drilling programme focused on the shallowest portion of the 18.8 million ounce Inferred
Mineral Resource estimated within the UG2 and Merensky reefs1
• Drill targets sited using a geological model recently confirmed by a heliborne magnetic survey
• Results from the Phase 1 programme to be used in Scoping / Pre-Feasibility Studies, which are
expected to form the basis of a submission for a Mining Right Application
• Follow-up Phase 2, 12-hole (13,582m) drill programme designed to increase the Inferred resource
estimate within the broader Exploration Target, and to increase the confidence level of the resource
estimate within the Project area
• Drilling results will be progressively announced
Southern Palladium (ASX:SPD, ‘Southern Palladium’ or ‘the Company’) is pleased to confirm a drilling
contract has been awarded to Geomech Africa (Pty) Ltd (‘Geomech’), for exploration at the Company’s
Bengwenyama PGM project.
Preparations are underway at the Bengwenyama site for the commencement of a Phase 1, 63-hole (24,464m)
diamond drill programme to commence mid-July 2022.
Geological services will be provided by Minxcon (Pty) Ltd (‘Minxcon’), an established mining and exploration
consultancy based in South Africa. Minxcon will manage the drill programme for the Company.
Two Phase Infill Drilling Programme Details
The drilling programme at Bengwenyama has been divided into two phases, both of which are designed on
a detailed assessment of previously drilled holes and identified target structures. The recent heliborne
magnetic survey confirmed the geological model used to design the two-phase drill programme.
The Phase 1 programme will comprise infill drilling at the shallowest area of the 18.8 million ounce Inferred
Mineral Resource (JORC 2012) estimated within the Upper Group 2 chromitite (UG2) and Merensky Reefs
deposit and some of the Exploration Target area.
1The information in this report that relates to Mineral Resources at the Bengwenyama Project is based on details
originally reported in the Independent Technical Assessment Report (ITAR) No. R246.2021 prepared by CSA Global
dated 19 April 2022 contained in the Company’s Prospectus and Pre-Listing Statement dated 22 April 2022.
The primary focus of Phase 1 drilling is the UG2 horizon at depths of less than 500m (see shaded area in
Figure 1). The maximum planned drillhole depth is 550m, with an average depth of 288m. The drilling is
based on an initial 350m grid spacing.
The drilling will commence on a wider grid spacing and work toward a closer spaced grid. This will allow for
changes in the drill programme as it progresses.
However, major changes to the programme are not expected following the results of a recent heliborne
magnetic survey at the site, which confirmed the geological model and was announced on 15 June 2022.
The Phase 1 programme is designed to support the preparation of a Scoping / Pre-Feasibility Studies at
Bengwenyama, which are expected to form the basis of a submission for a Mining Right Application (refer
ASX Webinar Presentation June 15, 2022).
Phase 2 will comprise widely spaced drilling within the broader Exploration Target area, to potentially
support upgrading this material to Inferred Mineral Resources (Figure 1).
The wider spaced Phase 2 drilling will improve the confidence in the entire Project area and potentially allow
for more accurate life-of-mine planning in the longer term.
Phase 2 has the capacity to increase the overall value of the Project, with the total area possibly being
upgraded to Inferred.
The maximum drillhole depth is estimated to be 2,040m (due to topography), with an average drilling depth
of 932m.
Figure 1: Two Phase Drilling Programme Outlay
Drilling timeline:
Table 1 details the number of drillholes and total drilling meters (including deflections) that are planned for
the two drilling phases.
It is estimated that phase 1 will be completed in eight to nine months, and phase 2 in four to five months.
Phase Drillholes Total drilling (m)
Phase 1 63 24,464
Phase 2 12 13,582
Total 75 38,046
Table 1. Phase 1 and Phase 2 drilling details
Results from the Phase 1 drill programme will be released progressively over the next eight to nine months,
subject to assay turnaround times.
About Geomech
Geomech is a subsidiary of leading South African mining services conglomerate GeoGroup, with more than
80 drill rigs in operation and a workforce of over 200 staff.
JORC Statement
The information in this report that relates to Mineral Resources at the Bengwenyama Project is based on
details originally reported in the Independent Technical Assessment Report (ITAR) No. R246.2021 prepared
by CSA Global dated 19 April 2022 contained in the Company’s Prospectus and Pre-Listing Statement dated
22 April 2022. The information in the ITAR that relates to Technical Assessment of the Mineral Assets,
Exploration Targets, or Exploration Results is based on information compiled and conclusions derived by Dr
Brendan Clarke, a Partner and an employee of CSA Global. The information in the ITAR that relates to Mineral
Resources is based on work undertaken by Anton Geldenhuys, a Principal Consultant and employee of CSA
Global. The Prospectus containing the ITAR can be found on the Company’s website at:
https://www.southernpalladium.com/site/investor-centre/prospectus
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the ITAR. The Company also confirms that all material assumptions and technical
parameters underpinning the estimates in the ITAR continue to apply and have not materially changed. In
addition the Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified.
The scientific and technical information contained in this announcement has been reviewed, prepared and
approved by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA).
Mr Engelmann is a director of Minxcon (Pty) Ltd and a member of the South African Council for Natural
Scientific Professions, and has sufficient experience relevant to the styles of mineralisation and activities
being undertaken to qualify as a Competent Person, as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Engelmann has a beneficial
interest in Southern Palladium through a shareholding in Nicolas Daniel Resources Proprietary Limited.
This announcement has been approved for release by the Board of Southern Palladium Limited.
About Southern Palladium:
Southern Palladium Limited (ASX:SPD, JSE:SDL) is a dual-listed platinum group metal (PGM) company
developing the advanced Bengwenyama PGM project, particularly rich in palladium/rhodium, in South
Africa. The project is located on the Eastern Limb of the Bushveld Complex, which contains more than 70%
of the world’s known Platinum Group Metal (PGM) Resources. With its 70% stake in the project, the
Company’s focus will be on the delivery of a Pre-Feasibility study and Mining Right application through a
geophysical survey that has recently been completed, a two-phase diamond drill programme due to
commence early next month as well as various technical studies to be completed.
A major development opportunity in the global PGM market, previous exploration at Bengwenyama has
already delivered a JORC 2012-compliant Inferred Mineral Resource of 18.8Moz within two ore horizons –
the UG2 chromitite and Merensky Reef. In addition, an assessment by mining industry consultants CSA
Global assessed the total resource potential of Bengwenyama at between 33.9Moz and 52.4Moz. The
Company is led by an experienced on-ground management team including some of South Africa’s most
high-profile mining industry executives.
For further information, please contact:
Johan Odendaal
Managing Director
Southern Palladium
Phone: +27 82 557 6088
Email: johan.odendaal@southernpalladium.com
29 June 2022
JSE Sponsor
Merchantec Capital
Media & investor relations inquiries: Sam Jacobs, Six Degrees Investor Relations: +61 423 755 909
Follow @SouthernPalladium on Twitter
Follow Southern Palladium on LinkedIn
Date: 29-06-2022 08:30:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE').
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct,
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
information disseminated through SENS.