Quarterly Review and Production Report for the period  1 January to 31 March 2018

ROYAL BAFOKENG PLATINUM LIMITED
(Incorporated in the Republic of South Africa)
(Registration number 2008/015696/06)
JSE Equity share code: RBP       ISIN: ZAE000149936
JSE Debt Share Code: RBPCB ISIN: ZAE000243853
(“RBPlat” or the “Company”)


ROYAL BAFOKENG PLATINUM LIMITED QUARTERLY REVIEW AND PRODUCTION REPORT FOR THE PERIOD
                               1 JANUARY TO 31 MARCH 2018

                        SOLID PRODUCTION AND COST PERFORMANCE

OVERVIEW

    -    No fatal accidents during the quarter
    -    1.9% increase in tonnes delivered
    -    9.9% increase in tonnes milled
    -    4.2% improvement in 4E built-up head grade
    -    13.0% increase in platinum ounce production
    -    6.6% reduction in cash operating costs
    -    5.4% reduction in cash operating cost per platinum ounce
    -    61.7% increase in capital expenditure



SAFETY

No fatal accidents were recorded during the reporting period. A total of 11 serious and 14 lost time injuries were recorded
during the quarter resulting in our serious injury and lost time injury frequency rates deteriorating by 95.8% and 13.3%
to 2.571 and 3.272 per million hours respectively, compared to the first quarter of 2017. In contrast, our total injury
frequency rate (TIFR) for the period improved by 15.0%.

Notwithstanding the disappointing increase in our lost time and serious injury frequency rates, we are encouraged by
the progress achieved with our safety strategy as evidenced in the improvement in our TIFR and having achieved
three million fatality free shifts on 4 February 2018.

Fostering a resilient operating culture is fundamental in securing meaningful year-on-year improvements in our key
safety metrics, operational excellence and ultimately achieving our goal of zero harm. As such RBPlat’s management
and employees remain fully committed to our safety strategy.

PRODUCTION
Total tonnes delivered to concentrators increased by 1.9% to 735kt with BRPM contributing 535kt and Styldrift 200kt
representing a 10.4% decrease and a 61.3% increase from the operations respectively. The reduction in tonnes delivered by
BRPM is mainly attributable to the suspension of UG2 mining at South shaft with the increase in tonnes delivered by Styldrift
being in line with its ramp-up schedule.

Total tonnes milled for the quarter increased by 9.9% to 758kt with BRPM contributing 551kt and Styldrift 207kt. The UG2
contribution to overall tonnes milled reduced by 27.3% from 20.5% to 14.9% commensurate with lower UG2 volumes from
BRPM and increased Merensky volumes from Styldrift. The 23kt variance between delivered and milled tonnes is
attributable to a reduction in surface run-of-mine stocks.

The built-up head grade for the reporting period improved by 4.2% from 3.79g/t (4E) to 3.95g/t (4E).

The increase in tonnes milled and improved built-up head grade yielded a 12.2% and 13.0% increase in 4E and platinum
ounce production to 81.1koz and 52.3koz respectively.


CASH OPERATING COSTS

Cash operating costs for the reporting period amounted to R655 million, equating to a 6.6% reduction compared to the
comparative period in 2017. The reduction is attributable to lower BRPM production volumes and benefits accrued from
the restructuring process embarked on during 2017. Cash operating cost per tonne milled and per platinum ounce ended
3.1% and 5.4% lower at R1 189 and R16 004 compared to the first quarter of 2017.

CAPITAL

Total capital expenditure for the reporting period increased by 61.7% to R599.3 million. The key contributor is the
increased Styldrift project development and construction activities in line with the ramp-up schedule, with expansion
capital related expenditure increasing by 63.6% to R566.2 million. Replacement capital expenditure increased by
R8.1 million to R10.6 million in line with our BRPM Phase III project construction activities. Stay-in-business capital
expenditure increased marginally from R22.0 million to R22.5 million, equating to approximately 3.4% of operating costs.

PROJECTS

Styldrift I project (expansion)

Mining and infrastructure construction related activities during the quarter remain aligned with the project ramp-up
schedule. Key project milestones completed during the quarter included the commissioning of the Services shaft and
overland conveyor belt to the BRPM concentrating facility.

Other project activities during the quarter focussed on:
    -    On-going decline access development on both 600 and 642 levels to the north and south to establish the
         required stoping sections and associated section ore-handling infrastructure
    -    Construction of section conveyor belts, workshops, stores and installation of services related to water and power
         reticulation
    -    Mining and construction activities required to complete life of mine rock and water handling infrastructure on
         642 and 708 levels (Settler 1, Silo 3 and Silo 4)

Capital expenditure for the quarter amounted to R566.2 million, bringing project expenditure to date to R9.03 billion.

BRPM Phase III project (replacement)

Project expenditure for the quarter amounted to R10.6 million bringing project expenditure to date to R1.08 billion.
Project progress and expenditure remains aligned with the construction schedule required to complete the scope of
work related to ore handling infrastructure on 14 and 15 levels.

MASEVE ACQUISITION

In line with the terms announcement on 6 September 2017 for the two phase acquisition of Maseve Investments 11
Proprietary Limited, focus was placed on finalising the conditions precedent in order to conclude the first phase (Plant
Transaction) of the transaction during the reporting period.
The first phase was concluded on 6 April 2018 resulting in all surface rights and plant assets relating to the Plant
Transaction being transferred into the name of Royal Bafokeng Resources (Pty) Ltd (“RBR”), a wholly-owned
subsidiary of RBPlat.




                                                   Unaudited          Unaudited
                                                                                   March 2018 vs.
 Description                          Unit   quarter ended 31   quarter ended 31
                                                                                       March 2017
                                                  March 2018         March 2017
 Safety
   TIFR (/1 000 000 hrs)*             rate            10.049             11.817            15.0%
   SIFR (/1 000 000 hrs)*             rate              2.571              1.313          (95.8%)
   LTIFR (/1 000 000 hrs)*            rate              3.272              2.889          (13.3%)
 Production
  Tonnes delivered to concentrators    kt                735                721             1.9%
   BRPM                                kt                535                597           (10.4%)
   Styldrift                           kt                200                124            61.3%
 Total tonnes milled                   kt                758                690             9.9%
   BRPM                                kt                551                571            (3.5%)
   Styldrift                           kt                207                119            73.9%
   % UG2 of total tonnes milled        %                 14.9               20.5           27.3%
  4E built-up head grade               g/t               3.95               3.79            4.2%
   BRPM                                g/t               4.21               4.07            3.4%
   Styldrift                           g/t               3.24               2.47           31.2%
   Merensky                            g/t               3.90               3.76            3.7%
   UG2                                 g/t               4.21               3.94            6.9%
 Recovery (4E) total concentrating     %                84.33              85.93           (1.9%)
 Recovery (4E) BRPM concentrator       %                84.63              86.93           (2.6%)
  Metals in concentrate produced
 BRPM JV
   4E                                 koz                81.1               72.3           12.2%
     Platinum                         koz                52.3               46.3           13.0%
     Palladium                        koz                21.7               19.5           11.3%
     Rhodium                          koz                 4.6                4.3            7.0%
     Gold                             koz                 2.5                2.1           19.0%
   Iridium                            koz                 1.5                1.4            7.1%
   Ruthenium                          koz                 7.8                7.1            9.9%
   Nickel                              kt               0.534              0.425           25.6%
   Copper                              kt               0.329              0.272           21.0%
 BRPM
   4E                                 koz                63.5               64.7           (1.7%)
     Platinum                         koz                40.9               41.4           (1.2%)
     Palladium                        koz                17.0               17.5           (2.9%)
     Rhodium                          koz                 3.7                3.9           (5.1%)
     Gold                             koz                 1.9                1.9                -
   Iridium                            koz                 1.2                1.3           (7.7%)
   Ruthenium                          koz                 6.2                6.5           (4.6%)
   Nickel                              kt               0.389              0.348           11.8%
   Copper                              kt               0.246              0.225            9.3%

 Styldrift
   4E                                 koz                17.6                7.6          131.6%
     Platinum                         koz                11.4                4.9          132.7%
     Palladium                        koz                 4.7                2.0          135.0%
     Rhodium                          koz                 0.9                0.4          125.0%
     Gold                             koz                 0.6                0.2          200.0%
   Iridium                            koz                 0.3                0.1          200.0%
   Ruthenium                          koz                 1.6                0.6          166.7%
   Nickel                              kt               0.145              0.077           88.3%
   Copper                              kt               0.083              0.048           72.9%




                                                                                     Unaudited              Unaudited
                                                                                                                              March 2018 vs.
 Description                                                          Unit     quarter ended 31       quarter ended 31
                                                                                                                                  March 2017
                                                                                    March 2018             March 2017
 Cash operating costs (Excl Styldrift incidental production)
 Cash operating costs                                                 R'm                     655                      701             6.6%
 Cash operating cost / tonne milled                                    R/t                  1 189                     1 227            3.1%
 Cash operating cost / 4E oz                                          R/oz                 10 310                10 823                4.7%
 Cash operating cost / Pt oz                                          R/oz                 16 004                16 922                5.4%

 Capital expenditure
 Total capital expenditure                                            R'm                   599.3                     370.6          (61.7%)
   Expansion                                                          R'm                   566.2                     346.1          (63.6%)
   Replacement                                                        R'm                    10.6                       2.5         (324.0%)
   Stay-in-business (SIB)                                             R'm                    22.5                      22.0           (2.3%)
   SIB as a percentage of operating cost                               %                       3.4                      3.1           (9.7%)

* As of 2018 RBPlat will report injury frequency rates per 1 000 000 man hours to align with industry best practice


The information set out in this announcement has not been reviewed and reported on by the company’s external
auditors.


Johannesburg
17 April 2018

JSE Sponsor:
Merrill Lynch South Africa (Pty) Ltd

For further information, please contact:

 Investors:                                                                  Media:
 Lindiwe Montshiwagae                                                        Mpueleng Pooe
 Executive: Investor Relations                                               Executive: Corporate Affairs
 +27 (0) 10 590 4510                                                         +27 (0) 10 590 4515
 lindiwe@bafokengplatinum.co.za                                              mpueleng@bafokengplatinum.co.za




Date: 17/04/2018 01:35:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story