SIBANYE GOLD LIMITED - Sibanye mineral resources and mineral reserves update for the gold and platinum divisions

Release Date: 03/03/2017 13:38
Code(s): SGL     PDF:  
Wrap Text
Sibanye mineral resources and mineral reserves update for the gold and platinum divisions

Sibanye Gold Limited
Incorporated in the Republic of South Africa
Registration number 2002/031431/06
Share code: SGL
ISIN - ZAE000173951
Issuer code: SGL
("Sibanye Gold", "Sibanye" or "the Group")

SIBANYE MINERAL RESOURCES AND MINERAL RESERVES UPDATE FOR THE GOLD AND PLATINUM DIVISIONS

Westonaria, 3 March 2017: Sibanye Gold Limited (JSE: SGL & NYSE: SBGL) is pleased to report updated
Group Mineral Resources and Mineral Reserves, declared as at 31 December 2016, which following the
acquisitions of Aquarius Platinum Limited and the Rustenburg Operations in 2016 includes maiden Platinum
Group Metals (4E PGM) Mineral Reserves and Resources.

Salient points:

     -   Total Gold Mineral Reserves of 28.7Moz declared represent a reduction of 2.3Moz, which after
         accounting for depletion of 1.6Moz due to mining activities in 2016, equates to a 2% decrease
         year on year.
     -   The cessation of underground mining at Cooke 4, resulted in the exclusion of 2.1Moz Gold Mineral
         Resources and 0.5Moz Gold Mineral Reserves
     -   Uranium Mineral Reserves decreased negligibly to 113.2Mlb, with the exclusion of 2.9Mlb from
         the Cooke Operations offset by additional Mineral Reserves from the Beisa Project being
         declared.
     -   Total Gold Mineral Resources increased by 3% to 102.0Moz
     -   Maiden 4E PGM Mineral Resources of 126.5Moz and Reserves of 23. 2Moz declared, position Sibanye
         in the top 5 PGM companies globally, based on these measures.
     -   The 12.5Moz decrease in 4E PGM Mineral Reserves year-on year, is primarily due to:
         -   Mining Depletion (1.7Moz),
         -   the sale of the Everest mine during the reporting period (1.1Moz),
         -   duplication of reported reserves of 2.4Moz declared by Anglo American Platinum at the
             Rustenburg operations in relation to the Kroondal PSA area and
         -   the application of more conservative commodity price assumptions used by Sibanye relative
             to those previously used by Anglo American Platinum and Aquarius Platinum ((resulting in a
             reduction of 6.2Moz at Rustenburg and 0.9Moz at Kroondal's Marikana operation). In line with
             Sibanye reporting standards, assumed commodity prices assumptions for estimating Mineral
             Resource and Reserves are based on three year average, trailing and spot commodity prices.

Summarise Group Mineral Resources and Reserve Estimate at 31 December 2016

                      Mineral Resources(1)                                       Mineral Reserves(1)
                                         31 Dec                                                             31 Dec
-   Gold              31 Dec 2016          2015             Gold                    31 Dec 2016               2015
                  Tonnes       Grade       Gold     Gold                   Tonnes       Grade      Gold       Gold
                    (Mt)       (g/t)      (Moz)     (Moz)                    (Mt)       (g/t)     (Moz)      (Moz)
Grand Total                                                 Grand Total   
Underground and                                             Underground
Surface           1104.5         2.9    102.035   98.790    and Surface     838.2         1.1    28.694     30.988

                         Mineral Resources(1)                                         Mineral Reserves(1)
                                         31 Dec                                                             31 Dec
                            31 Dec 2016    2015                                 31 Dec 2016                   2015
Uranium                                                     Uranium
                  Tonnes       Grade       U3O8      U3O8                  Tonnes       Grade      U3O8       U3O8

                    (Mt)      (kg/t)      (Mlb)     (Mlb)                    (Mt)      (kg/t)     (Mlb)      (Mlb)
Grand Total                                                 Grand Total
(Underground                                                (Underground
and Surface)       703.5       0.103    159.507   229.852   and Surface     687.5       0.075   113.226    113.814

                         Mineral Resources                                          Mineral Reserves
                                                                                                      31-Dec-
PGMs (4E)                  31-Dec-2016            31-Dec-   PGM (4)E                31-Dec-2016
                                                     2015                                                     2015
                  Tonnes       Grade         4E        4E                  Tonnes       Grade        4E         4E
                    (Mt)       (g/t)      (Moz)     (Moz)                    (Mt)       (g/t)     (Moz)      (Moz)
Grand Total                                                 Grand Total
Underground       1064.8         3.7    126.478   141.487   Underground     261.6         2.7    23.186     35.703
and Surface                                                 and Surface

Mineral Reserves are reported in accordance with the SAMREC Code, with three year average, trailing,
commodity prices applied in accordance with SEC requirements. The PGM Reserves reported at December
2016,(including Rustenburg and Aquarius but excluding Mimosa), have been evaluated on this price deck.
An average exchange rate of R12.70/US$ and the following commodity prices were used:

Precious metals                           2017             3 year average   
                               US$/oz     R/oz      R/kg         (US$/oz)   
Gold                            1,200   15,200   490,000            1,229   
Platinum                        1,222   15,500   499,000            1,209   
Palladium                         717    9,100   293,000              710   
Rhodium                           787   10,000   322,000              985   
Base minerals                  US$/lb     R/lb      R/kg         (US$/lb)   
Uranium (long-term contract)       45      572     1,260               47   


Group Consolidated Mineral Resource and Mineral Reserve Statement

Gold Division: Gold Resource and Reserve Estimate as at 31 December 2016

                         Mineral Resources(1)                                    Mineral Reserves(1)
Gold                                          31 Dec   Gold                                           31 Dec
                          31 Dec 2016           2015                           31 Dec 2016              2015
                    Tonnes   Grade     Gold     Gold                          Tonnes   Grade    Gold    Gold   
                      (Mt)   (g/t)    (Moz)    (Moz)                            (Mt)   (g/t)   (Moz)   (Moz)   
Operations                                             Operations                                              
Beatrix(2)                                             Beatrix(2)                                                
Measured              34.3     5.3    5.786    4.857   Proved AI                15.8     4.0   2.048   2.389   
Indicated AI          35.0     5.5    6.150    3.677   Probable AI              20.2     2.6   1.675   1.875   
Inferred AI            0.0     3.3    0.004    0.004                                                           
Total AI              69.4     5.4   11.940    8.538   Total AI                 36.0     3.2   3.723   4.264   
Indicated BI(3)        6.7     3.7    0.789    0.991   Probable BI(3)                                           
Beatrix - Total                                        Beatrix - Total                                         
Underground           76.1     5.2   12.729    9.530   Underground              36.0     3.2   3.723   4.264   
Cooke                                                  Cooke                                                   
Measured              11.6     8.3    3.113    1.566   Proved  AI                4.3     5.3   0.728   1.014   
Indicated AI          15.8     8.1    4.091    7.969   Probable AI               0.6     4.8   0.097   0.457   
Inferred AI            6.0    13.6    2.635    2.326                                                           
Total AI              33.5     9.1    9.839   11.862   Total AI                  4.9     5.2   0.826   1.471   
Inferred  BI(4)       40.7     3.1    3.998    3.998                                                           
Cooke - Total                                          Cooke - Total                                           
Underground           74.2     5.8   13.837   15.860   Underground               4.9     5.2   0.826   1.471   
Driefontein                                            Driefontein                                             
Measured AI           20.7    11.6    7.741    6.503   Proved AI                20.7     6.6   4.420   4.133   
Indicated AI           5.2     7.2    1.207    3.053   Probable AI               5.8     4.0   0.737   1.846   
Inferred AI            0.4    13.8    0.181    0.314                                                           
Total AI              26.3    10.8    9.129    9.870   Total AI                 26.5     6.1   5.157   5.980   
Measured BI(5)         8.5     8.0    2.180                                                                    
Indicated BI(5)       22.0     9.0    6.376    9.821   Probable BI(5)            8.8     6.0   1.694   2.122   
Total BI              30.4     8.7    8.556    9.821   Total BI                  8.8     6.0   1.694   2.122   
Driefontein-                                                                                                   
Total                                                  Driefontein-Total                                       
Underground           56.7     9.7   17.684   19.691   Underground              35.3     6.0   6.851   8.102   
Kloof                                                  Kloof                                                   
Measured              14.4    17.1    7.928    6.196   Proved AI                18.4     7.9   4.700   4.857   
Indicated AI           3.2    11.8    1.231    0.468   Probable AI               6.2     5.9   1.184   1.024   
Total AI              17.6    16.1    9.159    6.664   Total AI                 24.6     7.4   5.884   5.881   
Indicated BI          44.9    13.4   19.371   11.246   Probable BI               2.5     7.2   0.566   0.502   
Inferred BI            7.4    16.2    3.831   10.112                                                           
Total BI              52.2    13.8   23.202   21.359   Total BI                  2.5   7.2    0.566    0.502   
Kloof - Total                                          Kloof - Total                                           
Underground           69.9    14.4   32.361   28.023   Underground              27.1   7.4    6.450    6.383   
Operations -                                                                                                   
Total                                                  Operations - Total                                      
Underground          276.8     8.6   76.611   73.103   Underground             103.2   5.4   17.849   20.219   
Surface rock                                                                                                   
dumps (SRD)                                            Surface rock                                            
and tailings                                           dumps (SRD) and                                         
storage                                                tailings storage                                        
facilities (TSF)                                       facilities (TSFs)                                       
Beatrix                                                                                                        
(Indicated)            4.5     0.4    0.052    0.062   Beatrix (Probable)        4.5   0.4    0.052    0.062   
Randfontein                                                                                                    
Surf ace                                               Randfontein  Surf ace                                   
(Measured)             4.5     0.3    0.047    0.052   (Proved)                  4.5   0.3    0.047    0.052   
Driefontein                                            Driefontein                                             
(Indicated)            4.0     0.6    0.076    0.094   (Probable)                4.0   0.6    0.076    0.094   
Kloof  (Indicated)    11.9     0.5    0.200    0.163   Kloof  (Probable)        11.9   0.5    0.200    0.163   
Operations -                                           Operations - Total                                      
Total Surface         24.8     0.5    0.375    0.372   Surface                  24.8   0.5    0.375    0.372   
Total operations                                                                                               
(Incl. SRD and                                         Total operations                                        
TSF - excl.                                            (Incl. SRD and TSF                                      
projects)                                              - excl. projects)                                       
Beatrix               80.6     4.9   12.781    9.592   Beatrix                  40.5   2.9    3.775    4.326   
Cooke                 78.6     5.5   13.883   15.911   Cooke                     9.4   2.9    0.872    1.523   
Driefontein           60.7     9.1   17.760   19.786   Driefontein              39.2   5.5    6.926    8.196   
Kloof                 81.8    12.4   32.561   28.186   Kloof                    39.0   5.3    6.650    6.546   
Operations                                                                                                     
Total                301.7     7.9   76.985   73.475   Operations Total        128.1   4.4   18.224   20.591   
Projects                                               Projects                                                
Beisa North                                            Beisa North                                             
Inferred              14.8     3.4    1.619    1.619                                                           
Beisa North                                                                                                    
Total                 14.8     3.4    1.619    1.619   Beisa North Total                                       
Bloemhoek                                              Bloemhoek                                               
Indicated             27.4     4.7    4.163    4.163   Probable                                                
Inferred               0.9     4.9    0.135    0.135                                                        
Bloemhoek                                                                                                   
Total                 28.3     4.7    4.297    4.297   Bloemhoek Total                                      
Burnstone                                              Burnstone                                               
Indicated             25.4     5.3    4.350    4.350   Probable                 17.5   3.8    2.137    1.799   
Inferred              28.7     4.9    4.540    4.540                                                           
Burnstone Total       54.1     5.1    8.890    8.890   Burnstone Total          17.5   3.8    2.137    1.799   
De Bron                                                De Bron                                                 
Merriespruit                                           Merriespruit                                            
Indicated             23.0     4.5    3.307    3.307   Probable                 15.4   4.3    2.112    2.112   
Inferred               5.3     4.2    0.715    0.715                                                           
De Bron                                                                                                        
Merriespruit                                           De Bron                                                 
Total                 28.3     4.4    4.022    4.022   Merriespruit Total       15.4   4.3    2.112    2.112   
Projects - Total                                       Projects - Total                                        
Underground          125.5     4.7   18.828   18.828   Underground              32.9   4.0    4.248    3.911   
WRTRP                                                  WRTRP                                                   
Measured             625.0     0.3    5.697    5.962   Proved                                                  
Indicated             52.3     0.3    0.524    0.524   Probable                677.3   0.3    6.222    6.486   
Projects - Total                                       Projects - Total                                        
Surface              677.3     0.3    6.222    6.486   Surface                 677.3   0.3    6.222    6.486   
Projects Total       802.8     1.0   25.050   25.314   Projects Total          710.2   0.5   10.470   10.397   
Grand Total                                            Grand Total                                             
Underground                                            Underground and                                         
and Surface         1104.5     2.9  102.035   98.790   Surface                 838.2   1.1   28.694   30.988   

Mineral Resources are inclusive of Mineral Reserves
All tonnes (t) are expressed as metric units
Cut-off grades have been calculated in accordance with SEC Guidelines for mineral pricing and approximate the historic three-year average commodity prices
Mineral Resources were declared at a premium of 10% over the Mineral Reserve metal price
Gold Mineral Resources were determined at R540,000/kg and the Gold Mineral Reserves at R490,000/kg

1 Managed, unless otherwise stated

2 Beatrix Indicated Mineral Resources AI and Probable Mineral Reserves includes Beisa Central

3 Beatrix Indicated Mineral Resources BI refers to material below 26 Level (1,341mbs)

4 Cooke Inferred Mineral Resources BI refers to material within Cooke 4 Shaft Prospecting Right (Zuurbekom)

5 Driefontein Indicated and Inferred Mineral Resources and Probable Mineral Reserves BI refers to material below 50 Level (3,300mbs)

6 Kloof Indicated and Inferred Mineral Resources and Probable Mineral Reserves BI refers to material below 45 Level (3,347mbs)
* SOFS Projects

Gold Division: Uranium Resource and Reserve Estimate as at 31 December 2016

                           Mineral Resources(1)                                       Mineral Reserves(1)
                                                31 Dec                                                  31 Dec
Uranium                    31 Dec 2016            2015   Uranium                    31 Dec 2016           2015
                     Tonnes    Grade U()3O(8) U()3O(8)                       Tonnes    Grade U()3O(8) U()3O(8)   
                       (Mt)   (kg/t)    (Mlb)    (Mlb)                         (Mt)   (kg/t)    (Mlb)    (Mlb)   
Operations                                               Operations                                              
Beatrix(2)                                               Beatrix                                                 
Measured AI             3.6    1.086    8.548    8.548   Proved  AI                                              
Indicated AI            7.8    1.069   18.330   18.330   Probable AI           10.2    0.711   16.060   11.654   
Inferred  AI            0.0    1.101    0.090    0.090                                                           
Beatrix - Total                                          Beatrix - Total                                         
Underground            11.4    1.074   26.968   26.968   Underground           10.2    0.711   16.060   11.654   
Cooke                                                    Cooke                                                   
Measured AI                                      4.873   Proved  AI                                      2.056   
Indicated AI                                    11.546   Probable AI                                     1.017   
Inferred  AI(3)                                  8.020                                                           
Total AI                                        24.439   Total AI                                        3.073   
Inferred  BI                                    43.984                                                           
Cooke - Total                                            Cooke - Total                                           
Underground                                     68.423   Underground                                     3.073   
                                                         Operations -                                            
Operations - Total                                       Total                                                   
Underground            11.4    1.074   26.968   95.391   Underground           10.2    0.711   16.060   14.727   
Projects                                                 Projects                                                
Beisa North                                              Beisa North                                             
Inferred               14.8    1.084   35.373   35.373                                                           
Beisa North Total      14.8    1.084   35.373   35.373   Beisa North Total                                       
Projects - Total                                         Projects - Total                                        
Underground            14.8    1.084   35.373   35.373   Underground                                             
WRTRP                                                    WRTRP                                                   
Measured              625.0    0.063   87.230   89.151   Proved                                                  
Indicated              52.3    0.086    9.936    9.936   Probable             677.3    0.065   97.166   99.088   
Projects - Total                                         Projects - Total                                        
Surface               677.3   0.065    97.166    99.088  Surface             677.3   0.065    97.166    99.088   
Projects Total        692.1   0.087   132.539   134.461  Projects Total      677.3   0.065    97.166    99.088   
Grand Total                                              Grand Total                                             
(Underground                                             (Underground                                            
and Surface)          703.5   0.103   159.507   229.852  and Surface         687.5   0.075   113.226   113.814
*Mineral Resources are inclusive of Mineral Reserves

1 Managed, unless otherwise stated

2 Beatrix includes uranium Mineral Resources and Mineral Reserves from the Beisa Central Project

3 Cooke Inferred Mineral Resources BI refers to material within the Cooke 4 Shaft Prospecting Right (Zuurbekom)

Key aspects that impacted on the 31 December 2016 Statement of Gold and Uranium Mineral Reserves
include:

    -   Following the cessation of underground mining at Cooke 4, 0.5Moz was excluded from Gold Mineral
        Reserves.
    -   A focused exploration program on "secondary reefs" resulted in additional Mineral Reserves of
        0.6Moz at Kloof (Middelvlei Reef and Kloof Reef at Main shaft), Driefontein (Middelvlei Reef
        at 8 Shaft), and the Kimberley Reef at the Cooke Operations.
    -   The continuing review and investigation of previously unmined areas with economic potential
        ('white areas') resulted in a 0.9Moz increase in Gold Reserves during 2016. This was derived
        primarily at Beatrix West, Driefontein 8 Shaft and Kloof Main Shaft.
    -   Ongoing exploration at the western extension at Driefontein 5 Shaft, delineated a lower grade,
        overbank geological facies. This information underpinned an updated geological model, and this
        geological anomaly has resulted in a decrease in Mineral Reserves of 0.6Moz. Drilling on the
        opposite site of the overbank provides assurance that the extent of the overbank facies is
        constrained.
    -   Minor decreases in grade as a result of additional geological information at Beatrix South and
        the exclusion of certain high grade pillars at Kloof Main Shaft resulted in reserve decreases
        of 0.4Moz and 0.3Moz at those operations respectively.
    -   Uranium Mineral Reserves decreased negligibly to 113.2Mlb, with the exclusion of 2.9Mlb from
        the Cooke Operations alleviated by additional Reserves from the Beisa Project.

Group Consolidated Mineral Resource and Mineral Reserve Statement

Platinum Division: 4E PGM Resource and Reserve Estimate as at 31 December 2016

                                    Mineral Resources                                    Mineral Reserves
                                                        31-Dec-                                                               31-Dec-
Category - 4E PGM                       31-Dec-2016m       2015     Category - 4E PGM                        31-Dec-2016         2015
                               Tonnes   Grade   4E PGM   4E PGM                                      Tonnes   Grade   4E PGM   4E PGM
                                (Mt)    (g/t)   (Moz)     (Moz)                                        (Mt)    (g/t)   (Moz)    (Moz)
South African Operations                                          South African Operations    
Kroondal (50% attributable)(1)                                    Kroondal (50% attributable)(1)    
Measured                        44.5     3.5     5.039    8.190   Proved(4)                           21.0     2.7     1.802    4.030
Indicated                       14.2     3.7     1.688    2.319   Probable                             5.8     2.6     0.489    0.951
Inferred                         6.0     3.2     0.629    0.903    
Kroondal - Total                                                  Kroondal - Total    
                                64.8     3.5     7.356   11.412                                       26.8     2.7     2.291    4.981
Underground                                                       Underground    
Rustenburg (100%                                                  Rustenburg (100%    
attributable)                                                     attributable)    
Measured                        375.9    4.9    59.745   63.017   Proved                             123.1    3.8    15.165    21.278
Indicated                       125.6    5.3    21.525   22.257   Probable                             6.7     4.2     0.901    4.204
Inferred                        15.2     5.6     2.717    2.760    
Rustenburg - Total                                                Rustenburg - Total    
                                516.6    5.1    83.987   88.034                                      129.8    3.8    16.066    25.482
Underground                                                       Underground    
South African Operations -                                        South African Operations -    
                                581.4    4.9    91.343   99.447                                      156.6    3.6    18.357    30.463
Total Underground                                                 Total Underground 


Tailings Storage Facilities                                       Tailings Storage Facilities
(TSF)                                                             (TSF)
Rustenburg (Measured)            90.4     1.1     3.140    3.280  Rustenburg (Proved )
 
Rustenburg (Indicated)                                            Rustenburg (Probable)                  90.4   1.1    3.140    3.280   
South African Operations -                                        South African Operations -
Total Surface                    90.4     1.1     3.140    3.280  Total Surface                          90.4   1.1    3.140    3.280  
Total operations (Incl. TSF -                                     Total operations (Incl. TSF -                                              
Excl. Projects)                                                   Excl. Projects)                                                       
Kroondal                         64.8     3.5     7.356   11.412  Kroondal                               26.8   2.7    2.291    4.981   
Rustenburg                      607.0     4.5    87.127   91.314  Rustenburg                            220.2   2.7   19.206   28.762   
South African Operations     
Total                           671.7     4.4    94.483  102.727  South African Operations 
Total                           246.9     2.7    21.497   33.743   
Non South African                                                 Non South African                                                     
Operations                                                        Operations                                                            
Mimosa (50% Attributable)(3)                                      Mimosa (50% Attributable)(3)                                            
Measured                         31.9     3.7     3.776    4.120  Proved                                  9.2   3.5    1.053    1.310   
Indicated                        15.4     3.6     1.776    1.790  Probable                                5.4   3.7    0.636    0.650   
Inferred                          4.4     3.6     0.512    0.520                                                                        
Inferred  (Oxides)                9.0     3.4     0.981    0.980                                                                        
Mimosa - Total Underground       60.7     3.6     7.045    7.410  Mimosa - Total Underground             14.6   3.6    1.689    1.960   
Non South African                                                 Non South African                                                     
Operations - Total               60.7     3.6     7.045    7.410  Operations - Total                     14.6   3.6    1.689    1.960   
Underground                                                       Underground                                                                
Projects                                                          Projects                                                                   
Millenium                                                                                                                                    
Indicated                                                  1.430                                                                              
Inferred                         17.5     3.1     1.720    0.290                                                                              
Millenium Total                  17.5     3.1     1.720    1.720                                                                              
Vygenhoek                                                                                                                                     
Measured                          1.4     5.1     0.230    0.230                                                                              
Vygenhoek Total                   1.4     5.1     0.230    0.230                                                                              
Sheba's Ridge (3E PGM)                                                                                                                        
Measured                         31.2     0.9     0.880    0.880                                                                              
Indicated                        37.9     0.9     1.040    1.040                                                                              
Inferred                        167.0     1.0     5.180    5.180                                                                              
Sheba's Ridge Total             236.1     0.9     7.100    7.100                                                                              
Zondernaam                                                                                                                                   
Inferred                         77.4     6.4    15.900   15.900                                                                       
Zondernaam Total                 77.4     6.4    15.900   15.900                                                                       
Hoedspruit                                                                                                                             
Indicated                                                  2.450                                                                       
Inferred                                                   0.530                                                                       
Hoedspruit Total                                           2.980                                                                       
Hoogland                                                                                                                               
Indicated                                                  2.810                                                                       
Inferred                                                   0.610                                                                       
Hoogland Total                                             3.420                                                                       
Projects - Total Underground    332.4     2.3    24.950   31.350  Projects - Total Underground                                        
Grand Total                                                       Grand Total 
Underground & Surface          1064.8     3.7   126.478  141.487  Underground & Surface                 261.6     2.7  23.186   35.703    

Mineral Resources are inclusive of Mineral Reserves
All tonnes (t) are expressed as metric units
Mineral Resources were declared at a premium of 10% over the Mineral Reserve metal price

1. Kroondal year on year change includes the sale of Everest Mine during the reporting period and the removal of 
   sub-economic Reserves from the Marikana section. Kroondal is mined under a Pool and Share agreement (PSA) with Anglo American
   Platinum (AAP) and mineral resources and reserves are reported as 50% attributable.
2. .Mimosa's change YoY is associated with depletions. Mimosa (Zimbabwe) is a non RSA operation managed as a standalone company 
   in Zimbabwe, 50% attributable to Sibanye. The Reserves reported are June 2016 declared by Mimosa less depletions to December 2016.
3. Kroondal is mined under a Pool and Share agreement (PSA) with AAP. Kroondal retains exclusive mining rights for the Kroondal Extension 
   and 1.130Moz 4E PGM (50% attributable) is included in the Sibanye statement ending 31 December 2016.

Key aspects that impacted on the 31 December 2016 Statement of the 4E PGM Mineral Resources and Reserves
include:

   -   At the Kroondal operations total 4E PGM Mineral Reserves decreased by 2.7Moz. This reduction
       can be primarily attributed to:
         -   0.4Moz due to mining depletion between June 2015 and December 2016. To align with
               Sibanye reporting processes, this reserve declaration considers 18 months of mining
               depletion.
         -   A 0.9Moz reduction in Mineral Reserves at Marikana. The Marikana operation was placed
               on care and maintenance by Aquarius Platinum during 2015 and did not contribute to the

           2015 Life of mine plans. These Reserves have been reassessed and are not considered
           to be economically viable under Sibanye's economic assumptions.
      -    1.1Moz associated with the sale of Everest South during the reporting period.
      -    The balance of the decrease was made up of technical and modifying factors that
           accounted for approximately 0.3Moz

At the Rustenburg Operations total 4E PGM Mineral Reserves decreased by 9.4Moz year-on-year. This
reduction can be attributed to:

-   1.0Moz depletion due to mining activities during 2016.
    -   Anglo American Platinum declared the ounces contained in Mineral Reserves at the Kroondal
        PSA 'Extension' area, amounting to 2.4Moz's, as 100% attributable to the Rustenburg
        operations in 2015. Aquarius Platinum declared 50% attributable reserves over the same area
        in 2015. Sibanye has reported these reserves as 50% attributable to the Kroondal operations
        from where these reserves will be extracted, thus reducing the Rustenburg declared reserves
        by 2.4Moz's.
    -   The application of Sibanye's more conservative economic assumptions at Rustenburg resulted
        in several areas at Siphumulele, Thembelani and Khusuleka shafts, containing approximately
        6.2Moz, being considered either uneconomic, or unable to generate sufficient returns from
        the capital expenditure required to access these reserves, to meet internal project hurdle
        rates.
    -   A sensitivity analysis has indicated that at sustained metal price increases of between 5%
        and 10%, the majority of these resources could be converted back to mineral reserves.
    -   The 4E PGM Mineral Reserves at Mimosa, a non-managed independent company in which Sibanye
        holds a 50% stake, are reported as at June 2016, less depletions to December 2016. A
        revision in the LoM Plan i will be updated by June 2017.
    -   Mineral Resources at the Hoogland and Hoedspruit projects (6.4Moz's) have not been declared
        in 2016 as these projects have been discontinued by Sibanye.

Abridged review per operation

BEATRIX
Beatrix is a low-cost, high productivity asset with a life of mine (LoM) extending to 2035. The Mineral
Resources include 12.8Moz gold and 27.0Mlb uranium. Gold Mineral Reserves decreased by 5% net of production
depletion of 0.3Moz to 3.8Moz in 2016, primarily as a result of lower grades affecting the tail end of the
production profile   at Beatrix South and Beatrix West sections.

The underground Reserve grade decreased from 3.5g/t in 2015 to 3.2g/t in 2016, primarily due to the
inclusion of additional ground from the lower gold grade Beisa project at Beatrix West (a uranium rich
project which is currently in Feasibility Study stage). The additional Uranium Reserves from Beisa resulted
in an increase of 4.4Mlb

The underground production is supplemented by processing historic rock dumps, with an estimated gold
Mineral Reserve of 0.052Moz at a grade of 0.4g/t.

DRIEFONTEIN
Driefontein is a high-yield, long-term operation with gold Mineral Resources of 17.8Moz, gold Mineral
Reserves of 6.9Moz and a LoM that extends to 2036.   The Mineral Reserves are based on current operations,
as well as the 5 Shaft Depth Extension project which commenced in 2016.

Gold Mineral Reserves decreased by 15% net of production depletion of 0.6Moz year on year.   This reduction
was primarily due to the intersection of a large geological anomaly ("overbank area") at 5 Shaft and the
5 Shaft Depth Extension Project, resulting in a reduction of 0.574Moz and reducing the life of mine by 
7 years. As a result of this geological anomaly, the Reserve Grade at 5 Shaft is expected to decrease by
0.5g/t to 6.5g/t, and by 1.3g/t to 6.0g/t at the 5 Shaft Depth Extension project.   Despite the decrease in
grade, the Depth Extension project is still above the economic hurdle rate of the Group and will continue
as planned. Further exploration is being conducted in the area, but drilling on the opposite site of the
overbank provides assurance that the extent of the overbank is constrained and that the extent of this
lower grade zone is well delineated and should not have any further impact on the Reserves.

Underground production is supplemented by processing of an estimated 0.1Moz of gold Mineral Reserves
contained in historic rock dumps. Further exploration of historic rock dumps extended the life of the
surface operation by another year.

KLOOF
Kloof is a high-yield long-term operation with a LoM extending to 2034 and gold Mineral Resources of
32.6Moz and gold Mineral Reserves of 6.7Moz. Gold Mineral Reserves increased by 2% net of production
depletion year on year, with the underground Reserve grade largely unchanged from 7.5g/t to 7.4g/t.      The
Mineral Reserves is based on the current operations, as well as the 4 Shaft Depth Extension project which
commenced in 2015. The increase in Mineral Reserves is largely due to additional Secondary Reefs (Middelvlei
Reef and Kloof Reef) of 0.2Moz, as well as white areas (0.3Moz).

Underground production is supplemented by processing historic rock dumps with an estimated gold Mineral
Reserve of 0.2Moz, an increase of 22% from last year.

COOKE
Cooke is a short- to medium-term asset, with gold Mineral Resources of approximately 13.9Moz and gold
Mineral Reserves of 0.9Moz. With the cessation of underground mining at the Cooke 4 mine, and closure of
the uranium processing circuit at the Ezulwini plant, the gold and uranium Mineral Reserve decreased by
0.5Moz and 2.9Mlbs respectively. With the exclusion of Cooke 4, as well as the inclusion of the expected
impact of the Grout Project (which will enable mining of high grade crush pillars at Cooke 1 and 3), the
average reserve grade at the Cooke Operations increased from 4.7g/t to 5.2g/t. Underground production is
supplemented by processing of historic tailings facilities at Cooke Plant which will be completed by end
2017.

KROONDAL
Kroondal is a low cost asset, with the current LoM estimated to extend to 2032. The operation is mined
under a pool and share agreement with Anglo Platinum in which the PSA, of which Sibanye has a 50%
stake, has exclusive mining rights to the area. Sibanye, through its Kroondal operations, has the
infrastructure and processing facilities to mine and process the ore from this PSA area. The operation
has 4E PGM Mineral Resources of approximately 7.356Moz (attributable) and 4E PGM Mineral Reserves of
2.291Moz (attributable). Marikana is a lease area situated east of the Kroondal area and forms a
natural extension to the existing mine plan for Kroondal. Marikana is however structurally complex
with the propensity for higher geological losses and as such, affects the extraction rates of this
orebody. The mine plan is sub economic considering the 4E PGM price deck applied to the 2016 valuation
and as such, is removed from reserves. AQPSA, the former owners of Marikana, had already placed this
operation on care and maintenance in 2015 owing to the high costs of extracting the ore from this
section.

RUSTENBURG OPERATIONS
The Rustenburg Operations are long term assets, with the current estimated LoM extending to 2046. The
operations contain 4E PGM Mineral Resources of approximately 87.127Moz and 4E PGM Mineral Reserves of
19.206Moz. The decline in the 4E PGM Mineral Reserves year-on-year, was primarily due to the use of
commodity price assumptions in line with Sibanye reporting standards and SEC guidelines.   These prices
are more conservative and as such resulted in several areas at Siphumulele and Thembelani conventional
shafts being considered uneconomical.

MIMOSA
Mimosa is a long-term asset, with the current LoM estimated to extend to 2033. The operation has 4E
PGM Mineral Resources of approximately 7.0Moz (attributable to Sibanye) and 4E PGM Mineral Reserves
1.7Moz (attributable to Sibanye). The 4E PGM Mineral Reserves have decreased by 0.3Moz year on year,
mainly due to depletion.

Abridged review per project

BURNSTONE
The development of the Burnstone Project commenced in 2015, with the first gold production expected by
2018. With Mineral Reserves of 2.1Moz, the project envisages steady state production of approximately
115,000oz per annum from 2021, with a LoM extending up to 2042.

WEST RAND TAILINGS RETREATMENT PROJECT
The West Rand Tailings Retreatment Project (WRTRP) will process the historical tailings storage
facilities of the Driefontein, Kloof and Cooke operations for gold and uranium. The project has an
estimated gold and uranium Mineral Reserve of 6.2Moz and 97.2Mlb respectively.

The project, which will utilize current metallurgical capacity as well as a Central Processing Plant
and Central Tailings Storage Facility, will have an annual steady state production of ~0.1Moz gold and
~0.9Mlbs uranium. The project life will extend to beyond 2068, and will have the additional benefit
of reducing the environmental liability posed by historical tailings.

DE BRON MERRIESPRUIT
Gold Mineral Reserves of 2.1Moz for the De Bron Merriespruit Project are based on the original
feasibility study previously conducted by Royal HaskoningDHV in 2013. However, the production design
and schedule was modified during 2015 in line with enhanced geological and estimation models, with the
extraction plan optimized in line with new cut-off grades.

Corporate governance
Sibanye reports its Mineral Resources and Mineral Reserves in accordance with the SAMREC Code, the
updated Section 12 of the JSE Listings Requirements and the SEC Industry Guide 7, which is aligned
with the guiding principles of SOX. Guided by a commitment to best practice corporate governance, the
statement has been reviewed by each Division's Technical Services. For the Gold Division, the statement
for the operations was independently reviewed by Amec Foster Wheeler (Mineral Resources) and by Mineral
Corporation Consultancy Proprietary Ltd (Mineral Reserves), and has been found to be compliant with
the relevant codes with no material shortcomings. The Platinum Division for 2016 did not have an
external audit due to the acquisition approval process occurring during the year.

The Mineral Resources and Mineral Reserves are estimates at a particular date, and are affected by
fluctuations in mineral prices, the Rand-US dollar currency exchange rate, operating costs, mining
permits, changes in legislation and operating factors. Although all permits may not be finalised and
in place at the time of reporting, there is no reason to expect that these will not be granted. However,
the length of the approval process for such permits may have an impact on the schedules stated.

All statement figures are managed by Sibanye with the exception of those for Mimosa. Mineral Resources
are reported inclusive of Mineral Reserves, and production volumes are reported in metric tonnes (t).
Gold and uranium estimates are reported separately from each other, therefore no gold equivalents are
stated to avoid potential anomalies as a result of year-on-year metal price differentials. The Platinum
Division statement consists of platinum reported as 4E PGM, which consists of platinum, palladium,
rhodium and gold. Individual proportions of the 4E PGM are determined via prill split proportions as
determined from the assays.

All financial models used to determine Mineral Reserves are based on current tax regulations at 31
December 2016.

For the Gold Division, the lead competent person designated in terms of the SAMREC Code, with
responsibility for the consolidation and reporting of Sibanye's Mineral Resources and Mineral Reserves,
and for overall regulatory compliance of these figures, is Gerhard Janse van Vuuren, who gave his
consent for the disclosure of the 2016 Mineral Resources and Mineral Reserves Statement. Gerhard [GDE
(Mining Eng), MBA, MSCC and B.Tech (MRM)] is registered with SAIMM (706705) and has 29 years' experience
relative to the type and style of mineral deposit under consideration.

For the Platinum Division, the lead competent person designated in terms of the SAMREC Code, who takes
responsibility for the consolidation and reporting of the Division's Mineral Resources and Mineral
Reserves, and for the overall regulatory compliance of these figures, is Andrew Brown, who gave his
consent for the disclosure of the 2016 Mineral Resources and Mineral Reserves Statement. Andrew [M.Sc
Mining Eng] is registered with SAIMM (705060) and has 32 years' experience relative to the type and
style of mineral deposit under consideration.

The respective business unit-based Mineral Resource managers, relevant project managers and the
respective Mineral Resource management discipline heads, have been designated as competent persons, in
terms of the SAMREC Code. These persons take responsibility for the reporting of Mineral Resources and
Mineral Reserves for their respective area(s). Additional information regarding these personnel, as
well as the teams involved with the compilation of the Mineral Resource and Mineral Reserve declaration,
is incorporated in the Mineral Resources and Mineral Reserves Supplement that has been published in
conjunction with this Sibanye Integrated Annual Report 2016.

Contact
James Wellsted
Head of Corporate Affairs
Sibanye Gold Limited
+27 83 453 4014
james.wellsted@sibanyegold.co.za

Sponsor

Sponsor: J.P. Morgan Equities South Africa (Pty) Ltd

FORWARD LOOKING STATEMENTS

Certain statements in this document constitute "forward-looking statements" within the meaning of
Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of
1934.

These forward-looking statements, including, among others, those relating to Sibanye's future
business prospects, revenues and income, wherever they may occur in this document and the exhibits to
this document, are necessarily estimates reflecting the best judgment of the senior management and
directors of Sibanye, and involve a number of known and unknown risks and uncertainties that could
cause actual results, performance or achievements of the Group to differ materially from those
suggested by the forward-looking statements. As a consequence, these forward-looking statements
should be considered in light of various important factors, including those set forth in this
document. Important factors that could cause the actual results to differ materially from estimates
or projections contained in the forward-looking statements include, without limitation, economic,
business, political and social conditions in South Africa, Zimbabwe and elsewhere; changes in
assumptions underlying Sibanye's estimation of its current Mineral Reserves and Resources; the
ability to achieve anticipated efficiencies and other cost savings in connection with past and future
acquisitions, as well as at existing operations; the ability of Sibanye to successfully integrate
acquired businesses and operations (whether in the gold mining business or otherwise) into its
existing businesses; the success of Sibanye's business strategy, exploration and development
activities; the ability of Sibanye to comply with requirements that it operate in a sustainable
manner; changes in the market price of gold, platinum group metals ("PGMs") and/or uranium; the
occurrence of hazards associated with underground and surface gold, PGMs and uranium mining; the
occurrence of labour disruptions and industrial action; the availability, terms and deployment of
capital or credit; changes in relevant government regulations, particularly environmental, tax health
and safety regulations and new legislation affecting water, mining, mineral rights and business
ownership, including any interpretations thereof which may be subject to dispute; the outcome and
consequence of any potential or pending litigation or regulatory proceedings or other environmental,
health and safety issues; power disruptions, constraints and cost increases; supply chain shortages
and increases in the price of production inputs; fluctuations in exchange rates, currency
devaluations, inflation and other macro-economic monetary policies; the occurrence of temporary
stoppages of mines for safety incidents and unplanned maintenance; Sibanye's ability to hire and
retain senior management or sufficient technically skilled employees, as well as its ability to
achieve sufficient representation of historically disadvantaged South Africans' in its management
positions; failure of Sibanye's information technology and communications systems; the adequacy of
Sibanye's insurance coverage; any social unrest, sickness or natural or man-made disaster at informal
settlements in the vicinity of some of Sibanye's operations; and the impact of HIV, tuberculosis and
other contagious diseases. These forward-looking statements speak only as of the date of this
document.

The Group undertakes no obligation to update publicly or release any revisions to these forward-
looking statements to reflect events or circumstances after the date of this document or to reflect
the occurrence of unanticipated events.
Date: 03/03/2017 01:38:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.