Wrap Text
Mbeya Definitive Mining Feasibility Study - Stage 2: Geotechnical Drill Programme Completed
Kibo Mining Plc (Incorporated in Ireland)
(Registration Number: 451931)
(External registration number: 2011/007371/10)
Share code on the JSE Limited: KBO
Share code on the AIM:KIBO
ISIN: IE00B97C031
("Kibo" or "the Company")
15 October 2015
Mbeya Definitive Mining Feasibility Study - Stage 2: Geotechnical Drill Programme
Completed
Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed
mineral exploration and development company, is pleased to announce completion of Phase 1of
the Mbeya Definitive Mining Feasibility Study (MDMFS). This is a critical work stream of the
final Stage of the broader Mbeya Coal to Power Project, Mining Feasibility Study.
Key highlights
* 820 meter diamond core drill programme to confirm slope angles of pit design;
* Metallurgical sampling programme to verify specific coal properties, required for detail
design requirements of power station; and
* Additional data obtained from drill programme to enable restatement of Mbeya Coal
Resource, during Phase 2 of MDMFS.
Louis Coetzee, CEO of Kibo Mining, said: "The MCPP, as an integrated project, is persistently
growing in stature. This is best reflected in the continued progress we are making towards
concluding critical commercial arrangements on the MCPP, to ensure optimal value creation and
realization on the Company's flagship asset. These efforts are in turn strongly supported by the
ongoing feasibility work that is continuing in parallel, and at pace.
It is clear from the information above and the exciting financial results announced on 12 October
that Kibo is entering the final phases of the MDMFS with confidence and significant momentum.
During the MDMFS the final mine designs, mine plans and construction planning will be
completed in preparation for the construction phase that will follow.
Understanding the context of this announcement as well as the RNS of 12 October is of critical
importance. The MCPP is totally dependent on the reliability and sustainability of its fuel source
i.e. the Mbeya coal mine. The results announced on 12 October not only confirmed that the mine
is technically, operationally and financially robust, but that the MCPP power component has, as a
direct result thereof, a solid foundation on which it can be developed."
Background MDMFS; Phase 1
Kibo and its advisers, Minxcon Projects, have now completed Phase 1 of the MDMFS which
mostly comprised of a geotechnical drilling programme on the Mbeya coal mine site. 90% of the
work scheduled for Phase 1 of the MDMFS consisted of the 820 meter diamond core drill
programme. The geotechnical drill programme represents a mission-critical component of the
MDMFS. This was required to confirm the ground conditions in and around the final pit position,
which in turn determines the final slope angles in the pit design. The final slope angles are an
absolute pre-requisite for final and detailed mine design. (The pit position and parameters were
determined during Ph2, Stage 1, MDMFS (Pre-Feasibility Study).
The drill programme comprised a total of 8 holes, accurately angled and directed at specific
strategic positions to penetrate the pit hanging wall at depths varying from 95 - 120m and totalling
820m. Geotechnical samples were collected from the recovered core and submitted for laboratory
analysis and these results will form the basis of the geotechnical input parameters for the final
mine design during the MDMFS. Visual assessment of the core re-confirmed all previous
geotechnical findings to date.
To accelerate development, the Company designed the geotechnical drill programme to double up
as an extensive metallurgical sampling programme as well. The metallurgical analysis to be
conducted from the sampling program, will verify specific coal properties that are required for
detail design requirements of the MCPP power station component.
Combining the two activities also brought about a significant saving on the MCPP feasibility
study budget, due to the fact that a separate drill programme for the purposes of metallurgical
testing will now not be required. It also provided a significant amount of new data that will enable
a restatement of the Mbeya Coal Resource, during Phase 2 of the MDMFS.
The programme was executed and completed within scope, schedule and budget. Laboratory
results are expected within eight weeks.
Contacts
Louis Coetzee
+27 (0) 83 2606126
Kibo Mining plc
Chief Executive Officer
Andreas Lianos
+27 (0) 83 4408365
River Group
Corporate Adviser and Designated Adviser on JSE
Jon Belliss
+44 (0) 207 382 8300
Beaufort Securities Limited
Broker
Oliver Morse
+61 8 9480 2500
RFC Ambrian
LimitedNominated Adviser on AIM
Daniel Thöle
+44 (0) 203 772 2500
Bell Pottinger
Investor and Media Relations
Kibo Mining - Notes to editors
Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The
Company is focused on exploration and development of mineral projects in Tanzania, and
controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and
stable operating environment for the mineral resource industry and Kibo Mining therein.
Kibo Mining holds a thermal coal deposit at Rukwa, which has a significant JORC compliant
defined resource (See Table 1 below), and is developing a 250-350MW mouth-of-mine thermal
power station (“the MCPP�) with an established management team that includes Standard Bank as Financial
Advisor. Kibo is undertaking a Coal Mining Definitive Feasibility Study and a Power Pre-
Feasibility Study for Mbeya with initial findings to be released in the near term. On 20 April 2015,
Kibo signed a Joint Development Agreement for completion of the Definitive Feasibility Studies and
development of the MCPP with China based EPC contractor SEPCO III.
The Company also has extensive gold focused interests including Lake Victoria Goldfields and
Morogoro projects. At Lake Victoria, the Company has projects with a 550,000oz JORC
compliant gold Mineral Resource at Imweru Project (See Table 2 below) and a 168,000oz NI
43-101 compliant gold Mineral Resource at Lubando Project (See Table 3 below) in which the
Company holds a 90% attributable interest. The Company is currently undertaking a Definitive
Feasibility Study on its Imweru Project, with Preliminary Economic Assessment study findings
to be released in the near term.
Kibo also holds the Haneti Nickel Project on which the latest technical report confirms
prospectivity for nickel, PGMs, gold and strategic metals including Lithium.
Kibo Mining also holds the Pinewood (coal & uranium) project where the company has signed
a MOU to enter into a 50/50 Exploration Joint Venture with Metal Tiger PLC.
The Company's projects are located in the established and gold prolific Lake Victoria
Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern
Tanzania where the Government has prioritised infrastructural development attracting
significant recent investment in coal and uranium. The Company has a positive working
relationship with the Tanzanian government at local, regional and national levels and works
hard to maintain positive relationships with all communities where company interests are held.
The Company recognises the potential to enhance the quality of life and opportunity for
Tanzanian citizens through careful development of its projects.
Updates on the Company's activities are regularly posted on its website www.kibomining.com
Technical data
Rukwa Mineral Resource
Table 1 below presents a table showing the Mineral Resource estimate for the Rukwa Coal Project. The
table is taken from an NI 43 101-Compliant Report by GEMECS (Pty) Ltd dated April 2012.
Table 1
RUKWA COAL RESOURCE SUMMARY- GEMECS (Pty) Ltd
SEAM NI 43-101 IN SITU
SEAM THICKNESS CLASS MILLION TONS
S4 1.14 Indicated 2.17
S3U 2.04 Indicated 6.92
S3L 2.3 Indicated 12.63
S2 3.45 Indicated 23.43
S1U 2.48 Indicated 7.34
S1L 2.92 Indicated 17.4
S0 1.08 Indicated 1.44
Total Indicated Resources 71.34
S4 1.31 Inferred 1.38
S3U 2.24 Inferred 2.94
S3L 2.27 Inferred 3.86
S2 3.42 Inferred 7.94
S1U 2.05 Inferred 6.5
S1L 3.15 Inferred 12.83
S0 1.06 Inferred 2.6
Total Inferred Resources 38.05
TOTAL RESOURCES *109.39
*Kibo holds 100% of the Rukwa Mineral Resource
Imweru Mineral Resource
Table 2 below presents a table showing the Mineral Resource estimate for the Imweru Project at a
base case economic cut-off grade for the reporting of the resource of 0.4 g/t. The table is taken from a
JORC-Compliant Report by Tetra Tech EBA dated February 2014.
Table 2
Area Material Classification Cut-off Specific Metric Short Tons Gold Contained Gold
Type (g/t) Gravity Tonnes (t) Grade
(g/t) Ounces (troy)
Central
Laterite Indicated 0.40 2.50 131,000 144,000 1.785 8,000
Saprolite Indicated 0.40 2.50 706,000 778,000 1.387 32,000
Bedrock Indicated 0.40 2.89 1,895,000 2,089,000 1.043 64,000
Total Indicated 0.40 2.77 2,732,000 3,012,000 1.168 103,000
Laterite Inferred 0.40 2.50 685,000 755,000 1.317 29,000
Saprolite Inferred 0.40 2.50 1,047,000 1,154,000 1.040 35,000
Bedrock Inferred 0.40 2.89 7,838,000 8,640,000 1.029 259,000
Total Inferred 0.40 2.82 9,569,000 10,548,000 1.051 323,000
East Total Inferred 0.40 2.70 2,653,000 2,925,000 1.449 124,000
Imweru Property Total
Indicated 0.4 2.77 2,732,000 3,012,000 1.168 103,000
Inferred 0.4 2.79 12,222,000 13,473,000 1.137 447,000
Combined
(inf+ind) 0.4 2.79 14,954,000 16,485,000 1.143 550,000
*Kibo holds 90% of the Imweru mineral resource
* Total estimates are rounded, based on composites capped at 26 g/t gold at Imweru Central and 25 g/t at Imweru East, the cut-off grade is
based on a gold price of US$1,200 and a 90% metallurgical recovery is assumed in calculation of cut-off grade. A base case of 0.40 g/t
has been selected.
** Classification of Mineral Resources incorporates the terms and definitions from the Australian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (JORC Code) published by the Joint Ore Reserve Committee (JORC)
Lubando Mineral Resource
Table 3 below presents a table showing the Mineral Resource estimate for the Lubando Project at a base
case economic cut-off grade for the reporting of the resource of 0.5 g/t Au. The table is taken from an
NI 43 101-Compliant Report by EBA Engineering Consultants Limited (now part Tetra Tech EBA)
dated August 2009.
TABLE3: LUBANDO MINERAL RESOURCE SUMMARY - BASECASE*
Category West Zone East Zone South East Zone Mid East Zone North Total
Measured Resource
Measured Resource(t) 107,900 4,880 16,900 54,440 184,150
Grade(g/t) 1.6 2.52 1.72 2.48 1.95
Total Gold(oz) 5,900 400 950 4,340 11,500
Indicated Resource
Indicated Resource(t) 280,710 18,330 61,000 149,350 509,420
Grade(g/t) 1.6 2.23 1.89 2.73 1.99
Total Gold(oz) 14,500 1,300 3,700 13,120 32,600
Inferred Resource
Total Resource(t) 1,090,000 65,470 209,340 535,330 1,900,140
Grade(g/t) 1.2 1.56 3.34 3.13 2.03
Total Gold(oz) 44,550 3,300 22,500 53,900 124,200
* Kibo holds 90% of the Lubando mineral Resource
* Numbers are rounded. Composites capped at 10.85g/t gold. Cut-off grade of 0.5 g/t gold based on a gold price of US$850/oz
and assumed 100% metallurgical recovery.CIM definitions were followed for Mineral Resources.
Pursuant to the terms of an inherited agreement with Barrick East Africa Exploration LTD (BEAL), Kibo
currently has an effective 90% interest in the Imweru and Lubando Project (and thus a 90% attributable
interest in the Imweru and Lubando Mineral Resources shown in Table 2 and 3 above), with Barrick having
a 10% carried interest up to a decision to mine at which point they have to contribute or be diluted to a 2%
net smelter royalty. BEAL also has a first right of refusal pursuant to which they can buy the 90% interest
in the project at an agreed market related value after completion of a Bankable Feasibility Study. Kibo
remains the operator of the project.
Review by Qualified Persons
The information in this announcement that relates to the Rukwa Coal Mineral Resource is taken from a
report titled "Independent Technical Report for the Rukwa Coal Project, Mbeya Region, United Republic
of Tanzania" dated 19th April 2012 by CD van Niekerk Director and Principal Geologist with the firm
GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for
Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the
Geological Society of South Africa. He has relevant experience and technical qualifications to be a
"Qualified Person" for reporting coal resources to the NI 43-101 Standard
Information in this announcement that relates to the Imweru Mineral Resource is taken from the report
titled "Resource Update for the Imweru Property Geita Region Northern, Tanzania, JORC Competent
Persons Report" dated February 17th 2014 (the "Report"). The Report states a JORC-compliant Mineral
Resource estimate and was prepared for Kibo Mining plc by James Barr P.Geo. and Darryn Hitchcock
P.Geo. Senior Geologist and Geologist respectively with TetraTech EBA Ltd. Both Mr. Barr and Mr.
Hitchcock are registered as Certified Professional Geologists with Association of Professional Engineers
and Geoscientists of British Columbia a recognised professional organisation. Mr Barr as principal author
responsible for the Report has experience in the evaluation and reporting of Archaean Gold projects and is
a "Qualified Person" for reporting gold resources to the JORC Standard. He consents to the inclusion in
this document of the matters based on his information in the form and context in which they appears.
The information in this announcement that relates to the Lubando Mineral Resources is taken from a report
titled "Technical Report on the Lubando property, Mwanza, Tanzania" dated 31st August 2009" (the
"Report") The Report is NI 43-101 compliant and was prepared for Great Basin Gold Rusaf Gold Limited
by Nathan Eric Fier C.P.G., P.Eng. Market Director for EBA Engineering Consultants Ltd and a Senior
Mining Consultant. Mr. Fieris registered as a Certified Professional Geologist with the American Institute
of Professional Geologists, Registration No 10062, and a professional Engineer in British Columbia,
Canada Registration No. 135165. He has extensive experience in the evaluation and reporting of Archaean
Gold projects.
The Company's Exploration Director, Noel O'Keeffe has reviewed the resource reports and the references
to them in this announcement.
Johannesburg
15 October 2015
Designated and Corporate Advisor
River Group
Date: 15/10/2015 08:00:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE').
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct,
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
information disseminated through SENS.