GLENCORE PLC - GLN - Corporate update and Production Report for the 12 months ended 31 December 2014

Release Date: 11/02/2015 09:00
Code(s): GLN     PDF:  
Wrap Text
GLN - Corporate update and Production Report for the 12 months ended 31 December 2014

GLENCORE PLC
(Incorporated in Jersey under the Companies (Jersey) Law 1991)
(Registration number 107710)
JSE Share Code: GLN
LSE Share Code: GLEN
HKSE Share Code: 805HK
ISIN: JE00B4T3BW64

NEWS RELEASE
Baar, 11 February 2015

Corporate update and Production Report
for the 12 months ended 31 December 2014

Following completion of the merger with Xstrata on 2 May 2013, production information for all periods covered in this
report has been presented on a combined basis.

Corporate update:

-   Responding to the volatile market backdrop, we have comprehensively reviewed the planned level of sustaining and
    expansionary capex in 2015. Originally guided to $7.9 billion at our investor day on 10 December 2014, we now
    expect 2015 total industrial capex to be in the $6.5 to $6.8 billion range, with reduced spend from across the broad
    portfolio. Further details of this review will be provided in our 2014 preliminary results presentation on 3 March 2015.

-   S&P reaffirmed the company's BBB (stable outlook) credit rating on 4 February 2015.

-   The marketing business performed in line with our expectations in 2014.

Production highlights:

-   Own sourced copper production increased 4% to 1,546,000 tonnes, principally due to the ramp-up of Mutanda, up
    31% to 197,000 tonnes, with the operation running at close to capacity throughout the year.
-   Own sourced zinc production was 1,387,000 tonnes, in-line with 2013 (up 12% quarter-on-quarter). This reflects
    higher production from Mount Isa, McArthur River and Perkoa as their respective expansion projects ramp-up, offset
    by lost production from the closures of Perseverance and Brunswick in June 2013.
-   Own sourced nickel production was 101,000 tonnes, up 3% on 2013, comprising the ramp-up at Koniambo and
    strong production at INO (up 9%) due to higher grades at Raglan, offset by the impact of the Falcondo, Cosmos and
    Sinclair (now sold) mines placed on care and maintenance during 2013.
-   Attributable own sourced ferrochrome production was up 5% at 1,295,000 tonnes, reflecting the ramp-up of Lion
    phase 2, which is progressing to plan and expected to reach full capacity by the middle of 2015.
-   Own sourced coal production was 146.3 million tonnes, up 6% over 2013, relating to productivity improvements and
    delivery of various advanced stage Australian thermal coal projects. A 3 week shutdown at our Australian coal
    operation was carried out over December 2014 and January 2015 in response to the subdued market environment.
-   Glencore oil entitlement was 7.4 million barrels, 47% higher than 2013. The increase relates to full year production
    from Alen (EG) and Badila (Chad) and increased ownership of the Chad assets following the Caracal acquisition.
    The Mangara field (Chad) started production at the end of December 2014 and is expected to ramp-up during 2015.
-   The Group's resources and reserves report was also released today.

For further information please contact:

Investors                                 Media
Paul Smith                                Charles Watenphul
t: +41 (0)41 709 24 87                    t: +41 (0)41 709 24 62
m: +41 (0)79 947 13 48                    m: +41 (0)79 904 33 20
e: paul.smith@glencore.com                e: charles.watenphul@glencore.com

Investors                                 Investors
Martin Fewings                            Elisa Morniroli
t: +41 (0)41 709 28 80                    t: +41 (0)41 709 28 18
m: +41 (0)79 737 56 42                    m: +41 (0)79 833 05 08
e: martin.fewings@glencore.com            e: elisa.morniroli@glencore.com

www.glencore.com

Metals and Minerals
                        
Production from own sources – Total(1)
                                                                                       2014      2013   Change
                                                                                                             %

Total Copper                                                                  kt    1,546.0   1,492.8        4
Total Zinc                                                                    kt    1,386.5   1,398.5      (1)
Total Lead                                                                    kt      307.5     315.0      (2)
Total Nickel                                                                  kt      100.9      98.4        3
Total Gold                                                                    koz       955     1,017      (6)
Total Silver                                                                  koz    34,908    39,041     (11)
Total Cobalt                                                                  kt       20.7      19.4        7
Total Ferrochrome                                                             kt      1,295     1,238        5             
Total Platinum(2)                                                             koz        91        90        1                
Total Palladium(2)                                                            koz        50        50        -               
Total Rhodium(2)                                                              koz        15        15        -
Total Vanadium Pentoxide                                                      mlb      20.8      21.6      (4)
                                                  
Production from own sources – Copper assets(1)
                                                                                       2014      2013   Change
                                                                                                             %
African Copper (Katanga, Mutanda, Mopani)    
                                   Total Copper metal(3)                      kt      465.0     398.6       17
                                   Total Cobalt(4)                            kt       17.2      16.0        8     
Collahuasi(5) 
                                   Copper metal                               kt       11.0      12.5     (12)
                                   Copper in concentrates                     kt      196.0     183.1        7
                                   Silver in concentrates                     koz     2,476     2,217       12
Antamina(6) 
                                   Copper in concentrates                     kt      116.4     149.5     (22)
                                   Zinc in concentrates                       kt       71.2      87.9     (19)
                                   Silver in concentrates                     koz     4,049     5,216     (22)
 
Other South America (Alumbrera, Lomas Bayas, Antapaccay, Punitaqui) 
                                   Total Copper metal                         kt       66.6      86.4     (23)
                                   Total Copper in concentrates               kt      281.1     260.4        8
                                   Total Gold in concentrates and in doré     koz       386       392      (2)
                                   Total Silver in concentrates and in doré   koz     1,901     2,192     (13)
 
Australia (Mount Isa, Ernest Henry, Townsville, Cobar) 
                                   Total Copper metal                         kt      209.5     197.3        6
                                   Total Copper in concentrates               kt       49.6      48.4        2
                                   Total Gold                                 koz        62        45       38
                                   Total Silver                               koz     1,386     1,334        4
Total Copper department    
                                   Total Copper                               kt    1,395.2   1,336.2        4
                                   Total Cobalt                               kt       17.2      16.0        8
                                   Total Zinc                                 kt       71.2      87.9     (19)
                                   Total Gold                                 koz       448       437        3
                                   Total Silver                               koz     9,812    10,959     (10)
                                                  
Production from own sources – Zinc assets(1)
                                                                                       2014      2013   Change
                                                                                                             %
Kazzin           
                                   Zinc metal                                 kt      199.3     216.2      (8)
                                   Lead metal                                 kt       25.7      29.8     (14)
                                   Copper metal                               kt       46.8      50.9      (8)
                                   Gold                                       koz       506       579     (13)
                                   Silver                                     koz     4,273     5,251     (19)
 
Australia (Mount Isa, McArthur River) 
                                   Total Zinc in concentrates                 kt      661.6     608.4        9
                                   Total Lead in concentrates                 kt      216.4     213.6        1
                                   Total Silver in concentrates               koz     8,319     8,450      (2)
            
North America (Matagami, Kidd, Brunswick) 
                                   Total Zinc in concentrates                 kt      135.8     194.3     (30)
                                   Total Lead in concentrates                 kt          -      13.5    (100)
                                   Total Copper in concentrates               kt       47.3      49.0      (3)
                                   Total Silver in concentrates               koz     2,066     4,549     (55)

Other Zinc (AR Zinc, Los Quenuales, Sinchi Wayra, Rosh Pinah, Perkoa) 
                                   Zinc metal                                 kt       23.2      29.7     (22)
                                   Zinc in concentrates                       kt      295.4     262.0       13
                                   Lead metal                                 kt       11.7      11.0        6
                                   Lead in concentrates                       kt       53.7      47.1       14
                                   Copper in concentrates                     kt        2.7       2.1       29
                                   Silver metal                               koz       613       670      (9)
                                   Silver in concentrates                     koz     9,825     9,162        7
Total Zinc department
                                   Total Zinc                                 kt    1,315.3   1,310.6        -
                                   Total Lead                                 kt      307.5     315.0      (2)
                                   Total Copper                               kt       96.8     102.0      (5)
                                   Total Gold                                 koz       506       579     (13)
                                   Total Silver                               koz    25,096    28,082     (11)
                                                 
Production from own sources – Nickel assets(1)
                                                                                       2014      2013   Change
                                                                                                             %
Integrated Nickel Operations (Sudbury, Raglan, Nikkelverk)  
                                   Total Nickel metal                         kt       51.3      47.1        9
                                   Total Nickel in concentrates               kt        0.6       0.5       20
                                   Total Copper metal                         kt       15.7      16.7      (6)
                                   Total Copper in concentrates               kt       38.3      37.6        2
                                   Total Cobalt metal                         kt        0.8       0.7       14
  
Australia (Murrin Murrin, XNA)  
                                   Total Nickel metal                         kt       36.4      35.9        1
                                   Total Nickel in concentrates               kt          -       4.1    (100)
                                   Total Copper in concentrates               kt          -       0.3    (100)
                                   Total Cobalt metal                         kt        2.7       2.6        4
                                   Total Cobalt in concentrates               kt          -       0.1    (100)
  
Falcondo                           Nickel in ferronickel                      kt          -       9.4    (100)
  
Koniambo                           Nickel in ferronickel                      kt       12.6       1.4      800
  
Total Nickel department  
                                   Total Nickel                               kt      100.9      98.4        3
                                   Total Copper                               kt       54.0      54.6      (1)
                                   Total Cobalt                               kt        3.5       3.4        3

Production from own sources – Ferroalloys assets(1)  
                                                                                       2014      2013   Change
                                                                                                             %             
Ferrochrome(7)                                                                kt      1,295     1,238        5
PGM(8)                             Platinum                                   koz        91        90        1
                                   Palladium                                  koz        50        50        -
                                   Rhodium                                    koz        15        15        -
                                   Gold                                       koz         1         1        -
                                   4E                                         koz       157       156        1
  
Vanadium Pentoxide                                                            mlb      20.8      21.6      (4)
                                                  
Total production – Custom metallurgical assets(1)
                                                                                       2014      2013   Change
                                                                                                             %                    
Copper (Altonorte, Pasar, Horne, CCR)                    
                                   Copper metal                               kt      433.8     468.3      (7)
                                   Copper anode                               kt      493.7     514.5      (4)                    
Zinc (Portovesme, San Juan de Nieva, Nordenham, Northfleet)                    
                                   Zinc metal                                 kt      781.8     745.0        5
                                   Lead metal                                 kt      177.4     174.1        2
                                   Silver                                     koz     9,482     7,870       20                    
Ferroalloys                    
                                   Ferromanganese                             kt        116        99       17
                                   Silicon Manganese                          kt        108        92       17
                    
Aluminium (Sherwin Alumina)                    
                                   Alumina                                    kt      1,382     1,606     (14)

1   Controlled industrial assets and joint ventures only. Production is on a 100% basis, except as stated.
2   Relating to the PGM business within Ferroalloys only.
3   Copper metal includes copper contained in copper concentrates and blister.
4   Cobalt contained in concentrates and hydroxides.
5   The Group's pro-rata share of Collahuasi production (44%).
6   The Group's pro-rata share of Antamina production (33.75%).
7   The Group's attributable 79.5% share of the Glencore-Merafe Chrome Venture.
8   Consolidated 100% of Eland and 50% of Mototolo.

Selected average commodity prices
                                                                       2014     2013   Change
                                                                                            %

S&P GSCI Industrial Metals Index                                        349      354      (1)
LME (cash) copper price ($/t)                                         6,866    7,328      (6)
LME (cash) zinc price ($/t)                                           2,164    1,909       13
LME (cash) lead price ($/t)                                           2,096    2,139      (2)
LME (cash) nickel price ($/t)                                        16,892   15,012       13
Gold price ($/oz)                                                     1,266    1,411     (10)
Silver price ($/oz)                                                      19       24     (21)
Metal Bulletin cobalt price 99.3% ($/lb)                                 14       13        8
LME (cash) aluminium price ($/t)                                      1,869    1,846        1
Metal Bulletin alumina price ($/t)                                      331      327        1
Metal Bulletin ferrochrome 6-8% C basis 60% Cr, max 1.5% Si (¢/lb)      105       99        6
Platinum price ($/oz)                                                 1,385    1,486      (7)
Iron ore (Platts 62% CFR North China) price ($/DMT)                      97      135     (28)

OPERATING HIGHLIGHTS

Copper assets
Total own sourced copper production was 1,546,000 tonnes, 4% (53,200 tonnes) higher than 2013, mainly relating to the
ramp-up within African copper. Collahuasi, Antapaccay and Australian Copper also increased production during the year,
however this growth was offset by lower grades at Antamina and operational constraints at Alumbrera and Lomas Bayas.

African copper
Copper production from own sources was 465,000 tonnes, up 17% (66,400 tonnes) on 2013. The increase includes a
46,500 tonnes (31%) increase at Mutanda to 197,100 tonnes with the operation running at near capacity throughout the
year and a 16% increase (21,800 tonnes) at Katanga, reflecting the ongoing expansion programme. The ramp-up at
Katanga is expected to continue as Phase V reaches completion. In 2014 Katanga continued to be impacted by power
availability / reliability, which is now expected to improve through a number of initiatives, including additional back-up
power generator capacity to cover the period for critical operational items until completion of the Inga dam project (first
turbine expected in Q4 2015 and the second turbine in Q2 2017).

Cobalt production was 17,200 tonnes, 8% higher than 2013, mainly relating to the expansion at Mutanda.

Collahuasi
The group's share of Collahuasi's copper production was 207,000 tonnes, up 6% (11,400 tonnes) on 2013, due to higher
ore tonnes milled (SAG mill 3 repowered in mid-2013) and marginally higher grades.

Antamina
The group's share of Antamina's copper production was 116,400 tonnes, down 22% (33,100 tonnes) on 2013, as a result
of planned lower grades and recoveries due to processing of long-term stock piles and transitional ore, in part offset by
higher quantities of ore milled, due to improved plant availability.

Zinc production was 71,200 tonnes, down 19% (16,700 tonnes) over the comparable period, relating to the mining of
lower grade zinc areas.

Other South America
Copper production from Other South America was 347,700 tonnes, marginally higher than 2013. This comprises a 20%
(28,100 tonnes) increase in copper in concentrate production at Antapaccay due to higher milling rates and improved
recoveries, offset by Tintaya SX/EW cathode production which ceased in 2013 (12,200 tonnes), a 10% (7,600 tonnes)
decrease in cathode production at Lomas Bayas due to processing constraints at the plant, and a 6% (7,000 tonnes)
decrease in copper in concentrate production at Alumbrera, resulting from a geotechnical event that temporarily
restricted pit access, during which time long-term stockpiles with lower grades were processed.

Gold production was 386,000 oz, down 2% on 2013, primarily resulting from expected lower head grades at Antapaccay.

Australia
Australian copper production was 259,100 tonnes, 5% (13,400 tonnes) higher than 2013. The increase reflects higher
own sourced cathode output from the Townsville refinery due to increased production of own sourced concentrates,
primarily from the Ernest Henry mine.

Gold production was 62,000 oz, 38% (17,000 oz) higher than 2013, relating to higher grades, including the treatment of
more Ernest Henry material (higher gold content) than in 2013.

Custom metallurgical assets
Custom copper cathode production was 433,800 tonnes, 7% lower than 2013. The reduction mainly relates to lower
production at Pasar (Philippines) due to the damage caused by typhoon Haiyan, which resulted in the plant being closed
for most of Q1 2014.

Custom copper anode production was 493,700 tonnes, 4% lower than 2013. The reduction relates to a scheduled
maintenance shutdown at Altonorte brought forward from 2015.

Zinc assets
Total own sourced zinc production was 1,386,500 tonnes, broadly in-line with 2013. This reflects higher production from
Mount Isa, McArthur River and Perkoa as their respective expansion projects ramp-up, offset by lost production from the
closures of Perseverance and Brunswick in June 2013 (partly replaced by production from the smaller Bracemac-
McLeod mine), lower head grades at Antamina and the prioritisation of third party material processing at Kazzinc.

Total own sourced lead production was 307,500 tonnes, 2% (7,500 tonnes) down on 2013. The reduction reflects closure
of the Brunswick mine (13,500 tonnes), offset by higher production at AR Zinc due to higher milling capacity and grades.

Kazzinc
Zinc production from own sources was 199,300 tonnes, 8% (16,900 tonnes) lower than 2013. The reduction relates to a
decision to opportunistically process more third party sulphide material, in preference to own source oxide material. Total
zinc production (including third party) was 304,500 tonnes, 1% (4,100 tonnes) higher than 2013.

Gold production from own sources was 506,000 oz, 13% (73,000 oz) lower than 2013, primarily due to temporary lower
recoveries at Vasilkovsky. Total gold production (including third party material) was 675,000 oz, 5% lower than 2013.

Lead production from own sources was 25,700 tonnes, 4,100 tonnes lower than 2013, although total lead production was
126,500 tonnes, 40% higher than 2013, reflecting the increased output of the new Isa lead smelter.

Copper production from own sources was 46,800 tonnes, 8% (4,100 tonnes) lower than 2013, due to some maintenance
downtime at the anode furnace. Total copper production was similarly impacted, down 4,200 tonnes at 58,200 tonnes.

Australia
Australia zinc production was 661,600 tonnes, 9% (53,200 tonnes) higher than 2013. The growth reflects successful
expansion of the Lady Loretta mine (Mount Isa) and commissioning of the Phase 3 expansion at McArthur River, which is
expected to increase ore production to 5 million tonnes per annum (from 2.5 million tonnes).

Australia lead production was 216,400 tonnes, slightly (1%) higher than 2013 levels.

North America
North America zinc production was 135,800 tonnes, down 30% (58,500 tonnes) compared to 2013. This reflects lost
production from the closures (end of mine lives) of Perseverance and Brunswick in June 2013 (93,600 tonnes), offset by
the ramp-up of the Bracemac-Mcleod mine, which produced 74,800 tonnes of zinc in 2014 (32,900 in 2013).

North America produced no lead in 2014 (2013 related fully to the closed Brunswick mine).

Other Zinc
The Other Zinc asset group produced 318,600 tonnes of own sourced zinc, a 9% (26,900 tonnes) increase over 2013,
mainly due to the ramp-up of Perkoa (started in April 2013) to 65,000 tonnes of own sourced zinc, from 32,200 tonnes..

Own sourced lead production was 65,400 tonnes, a 13% (7,300 tonnes) increase over 2013, mainly relating to higher
milling capacity and head grades at AR Zinc.

European custom metallurgical assets
Custom zinc production was 781,800 tonnes, up 5%. The increase mainly relates to Portovesme, which benefited from
the commissioning of the SX plant during 2013.

Custom lead production was 177,400 tonnes, up 2%, relating to a full year contribution from Portovesme's lead plant
following the restart in 2013, offset by some lost production at Northfleet due to the Mount Isa lead smelter fire which
temporarily reduced lead bullion shipments.


Nickel assets
Total own sourced production was 100,900 tonnes, 3% up on 2013, comprising the ramp-up at Koniambo (12,600
tonnes) and strong production at INO (up 9%) due to higher grades at the Raglan mine, offset by the impact of the
Falcondo, Cosmos and Sinclair mines placed into care and maintenance during 2013 (13,500 tonnes).

Integrated Nickel Operations ("INO")
INO own sourced nickel production was 51,900 tonnes, a 9% increase on 2013. The increase mainly relates to higher
production from the Raglan mine due to higher grades. Total nickel production, including third party material, was 91,200
tonnes, in line with 2013, which reflects a consistent production performance at the Nikkelverk refinery.

Australia
Australia produced 36,400 tonnes of own sourced nickel, down 9% (3,600 tonnes), reflecting the lost production from the
Cosmos and Sinclair mines put on care and maintenance in 2013 (the Sinclair mine has subsequently been sold). Total
nickel production (including third party material) at Murrin Murrin was 44,100 tonnes, up 7% over 2013, reflecting
consistent plant availability during the year.

Koniambo
Koniambo produced 12,600 tonnes of nickel in ferronickel as its commissioning and ramp-up phase continues.
Production was suspended at the end of December 2014 after detection of a metal leak in Line 1 of the metallurgical
plant. Line 2 received regulatory approval to restart on 18 January 2015 and investigation and repair work has
commenced on Line 1.

Ferroalloys assets

Ferrochrome
Attributable ferrochrome production was 1.3 million tonnes, a 5% increase over 2013, mainly reflecting the ramp-up of
Lion phase 2.

The Lion phase 2 project is progressing to plan and is expected to reach full capacity by the middle of 2015.

Platinum Group Metals ("PGM")
PGM production was 157,000 ounces, comparable with 2013.

Vanadium
Vanadium pentoxide production was 20.8 million lbs, down 4% on 2013. The decline relates to a planned longer annual
maintenance shutdown (three weeks compared to the usual two weeks).

Manganese
Total manganese production (ferromanganese and silicon manganese) was 224,000 tonnes, 17% higher than 2013. The
higher production was driven by efficiency improvements in Norway (silicon manganese) and demand led production
increases in France (ferromanganese).

Aluminium assets

Sherwin Alumina
Sherwin produced 1.4 million tonnes of alumina, 14% down on 2013. The reduction was due to a conscious decision to
temporarily curtail one of the five digestion units throughout H2 2014 reflective of weak market conditions for Atlantic
alumina, coupled with various power supply issues during the year caused by outages at the third party energy supplier.

Energy Products

Production from own sources
             
Coal assets(1)                
                                                                                2014     2013   Change
                                                                                                     %       
Australian coking coal                                                 mt        6.0      7.3     (18)
Australian semi-soft coal                                              mt        3.5      4.5     (22)
Australian thermal coal (export)                                       mt       54.6     48.1       14
Australian thermal coal (domestic)                                     mt        5.4      5.1        6
South African thermal coal (export)                                    mt       23.4     20.6       14
South African thermal coal (domestic)                                  mt       22.7     22.9      (1)
Prodeco                                                                mt       19.5     18.6        5                     
Cerrejón(2)                                                            mt       11.2     11.0        2
Total Coal department                                                  mt      146.3    138.1        6

1 Controlled industrial assets and joint ventures only. Production is on a 100% basis except for joint ventures, where the Group's attributable share of
  production is included.
2 The Group's pro-rata share of Cerrejón production (33.3%).

Oil assets
                                                                                2014     2013   Change
                                                                                                     %
Glencore entitlement interest basis
Equatorial Guinea                                                      kbbl    5,072    4,799        6
Chad                                                                   kbbl    2,279      186    1,125
Total Oil department                                                   kbbl    7,351    4,985       47
 
Gross basis 
Equatorial Guinea                                                      kbbl   24,232   21,917       11
Chad                                                                   kbbl    4,284      619      592
Total Oil department                                                   kbbl   28,516   22,536       27

Selected average commodity prices
                                                                                2014     2013   Change
                                                                                                     %
S&P GSCI Energy Index                                                            311      332      (6)
Coal API4 ($/t)                                                                   72       81     (11)
Coal McCloskey Newcastle (6,000 kcal NAR) ($/t)                                   70       84     (17)
Australian coking coal average realised export price ($/t)                       117      146     (20)
Australian semi-soft coal average realised export price ($/t)                     93      111     (16)
Australian thermal coal average realised export price ($/t)                       72       83     (13)
Australian thermal coal average realised domestic price ($/t)                     32       40     (20)
South African thermal coal average realised export price ($/t)                    68       76     (11)
South African thermal coal average realised domestic price ($/t)                  23       26     (12)
Prodeco (Colombia) thermal coal average realised export price ($/t)               75       83     (10)
Cerrejón (Colombia) thermal coal average realised export price ($/t)              67       73      (8)
Oil price – Brent ($/bbl)                                                         99      109      (9)

OPERATING HIGHLIGHTS

Coal assets
Total coal production was 146.3 million tonnes, 6% (8.2 million tonnes) higher than 2013. The increase mainly relates to
productivity improvements and the delivery of various advanced stage Australian thermal coal projects.

A three week shutdown at the Australian coal operations was carried out over December 2014 and January 2015, in
response to the current oversupply situation.

Australian coking
Australian coking coal production was 6.0 million tonnes, 18% (1.3 million tonnes) lower than 2013, mainly relating to
cost reduction initiatives that resulted in mine plan / roster changes at Newlands, Oaky Creek and Collinsville.

Australian thermal and semi-soft
Australian thermal and semi-soft production was 63.5 million tonnes, 10% (5.8 million tonnes) higher than 2013. The
increase reflects productivity improvements, completion of the Ravensworth North and Rolleston projects and the
commencement of longwall operations at Ulan West.

South African thermal
South African thermal coal production was 46.1 million tonnes, 6% (2.6 million tonnes) higher than 2013. The increase
reflects inclusion of the Hlagisa open cut mine for a full year in 2014, the benefits of productivity improvements at the
Tweefontein underground operations and the opening of the Wonderfontein open cut mine. These increases were
tempered by the closure of certain higher cost mines.

Prodeco
Prodeco production was 19.5 million tonnes, 5% (0.9 million tonnes) higher than 2013, reflecting better equipment
availability at Calenturitas and lower rainfall in 2014.

Cerrejón
Cerrejón attributable production was 11.2 million tonnes, 2% (0.2 million tonnes) higher than 2013. The increase mainly
relates to the impact of the 32 day strike that occurred in Q1 2013, offset by some minor mining restrictions in 2014.

Oil assets
Glencore's share of oil production was 7.4 million barrels, 47% higher than 2013. The increase relates to the first full year
of production from Alen (Equatorial Guinea) and Badila (Chad), as well as the increased ownership of the Chad assets
post completion of the Caracal acquisition in July 2014. The Mangara field (Chad) started production at the end of
December 2014 and is expected to ramp-up during 2015.

Agricultural Products

Processing / production data
                                           2014    2013   Change
                                                               %
Farming                             kt      762     883     (14)
Crushing                            kt    5,664   3,642       56
Long term toll agreement            kt      206     541     (62)
Biodiesel                           kt      757     624       21
Rice milling                        kt      230     273     (16)
Wheat milling                       kt    1,013   1,121     (10)
Sugarcane processing                kt    2,231   2,251      (1)
Total agricultural products         kt   10,863   9,335       16

Selected average commodity prices
                                           2014    2013   Change
                                                               %
S&P GSCI Agriculture Index                  350     402     (13)
CBOT wheat price (US¢/bu)                   588     684     (14)
CBOT corn no.2 price (US¢/bu)               415     578     (28)
CBOT soya beans (US¢/bu)                  1,244   1,407     (12)
ICE cotton price (US¢/lb)                    76      83      (8)
NYMEX sugar # 11 price (US¢/lb)              16      17      (6)

OPERATING HIGHLIGHTS

The agricultural products segment processed / produced 10.9 million tonnes, up 16% over 2013. The increase mainly
relates to the higher crush volumes at Timbues in Argentina, which operated for a full year in 2014 after starting
production in H2 2013, and the impact of our increased ownership in this asset to 50% from 33%. Sugarcane crushing at
Rio Vermelho (Brazil) was at similar levels to 2013, however volumes below potential, owing to the drought in the region.

Appendix – Q4 2013 to Q4 2014

Metals and Minerals
                                                          
Production from own sources – Total(1)
                                                                       Q4        Q1      Q2      Q3      Q4     2014     2013    Change     Change
                                                                     2013      2014    2014    2014    2014                     2014 vs   Q4 14 vs
                                                                                                                                   2013      Q4 13
                                                                                                                                      %          %
Total Copper                                                  kt    426.1     385.6   371.7   391.3   397.4  1,546.0  1,492.8         4        (7)
Total Zinc                                                    kt    336.8     306.4   344.0   347.3   388.8  1,386.5  1,398.5       (1)         15
Total Lead                                                    kt     81.1      79.0    69.9    74.4    84.2    307.5    315.0       (2)          4
Total Nickel                                                  kt     22.8      22.3    26.8    25.9    25.9    100.9     98.4        3          14
Total Gold                                                    koz     267       237     221     230     267      955    1,017       (6)          -
Total Silver                                                  koz   9,837     8,791   7,915   8,761   9,441   34,908   39,041      (11)        (4)
Total Cobalt                                                  kt      4.7       4.6     5.2     5.9     5.0     20.7     19.4         7          6
Total Ferrochrome                                             kt      345       335     317     287     356    1,295    1,238         5          3                
Total Platinum(2)                                             koz      22        21      22      24      24       91       90         1          9
Total Palladium(2                                             koz      12        12      12      13      13       50       50         -          8              
Total Rhodium(2)                                              koz       3         4       4       4       3       15       15         -          -
Total Vanadium Pentoxide                                      mlb     5.7       5.5     4.2     5.5     5.6     20.8     21.6       (4)        (2)
                                                      
Production from own sources – Copper assets(1)
                                                                       Q4        Q1      Q2      Q3      Q4     2014     2013    Change     Change
                                                                     2013      2014    2014    2014    2014                     2014 vs   Q4 14 vs
                                                                                                                                   2013      Q4 13
                                                                                                                                      %          %
African Copper (Katanga, Mutanda, Mopani, Sable) 
Katanga                   Copper metal(3)                     kt     41.4      31.6    41.0    42.6    42.8    158.0    136.2        16          3
                          Cobalt                              kt      0.5       0.5     0.5     0.9     0.9      2.8      2.3        22         80
Mutanda                   Copper metal(3)                     kt     49.1      47.1    51.5    52.0    46.5    197.1    150.6        31        (5)
                          Cobalt(4)                           kt      3.5       3.3     3.8     4.1     3.2     14.4     13.7         5        (9)
Mopani                    Copper metal                        kt     31.4      27.7    13.4    37.4    31.4    109.9    111.8       (2)          -
 
 
African Copper - total production including third party feed 
Mopani                    Copper metal                        kt     53.6      48.5    31.9    51.8    52.9    185.1    212.0      (13)        (1)
Sable                     Copper metal                        kt      3.7       2.5     1.3     1.1       -      4.9     14.6      (66)      (100)
                          Cobalt(4)                           kt      0.2       0.1     0.2     0.1     0.1      0.5      0.4        25       (50)
 
 
                          Total Copper metal(3)               kt    121.9     106.4   105.9   132.0   120.7    465.0    398.6        17        (1)
                          Total Cobalt(4)                     kt      4.0       3.8     4.3     5.0     4.1     17.2     16.0         8          3
  
  
Collahuasi5               Copper metal                        kt      2.4       2.3     2.0     2.7     4.0     11.0     12.5      (12)         67
                          Copper in concentrates              kt     62.4      50.0    51.6    45.8    48.6    196.0    183.1         7       (22)
                          Silver in concentrates              koz     807       675     680     530     591    2,476    2,217        12       (27)
  
  
Antamina6                 Copper in concentrates              kt     43.9      34.2    27.2    26.7    28.3    116.4    149.5      (22)       (36)
                          Zinc in concentrates                kt     19.8      11.1    16.0    24.7    19.4     71.2     87.9      (19)        (2)
                          Silver in concentrates              koz   1,500     1,068     937   1,060     984    4,049    5,216      (22)       (34)
 
 
Other South America (Alumbrera, Lomas Bayas, Antapaccay, Punitaqui) 
Alumbrera                 Copper in concentrates              kt     34.8      26.1    23.3    20.2    33.0    102.6    109.6       (6)        (5)
                          Gold in concentrates and in doré koz         90        81      65      61     110      317      313         1         22
                          Silver in concentrates and in doré koz      177       180     179     156     251      766    1,145      (33)         42
Lomas Bayas               Copper metal                        kt     18.2      18.0    17.3    15.4    15.9     66.6     74.2      (10)       (13)
Antapaccay                Copper metal                        kt      0.3         -       -       -       -        -     12.2     (100)      (100)
                          Copper in concentrates              kt     31.4      37.3    46.0    45.9    37.9    167.1    139.0        20         21
                          Gold in concentrates                koz      11        12      18      24      15       69       79      (13)         36
                          Silver in concentrates              koz     188       220     301     293     234    1,048      946        11         24

                                                                               Q4      Q1      Q2      Q3      Q4     2014     2013   Change     Change
                                                                             2013    2014    2014    2014    2014                    2014 vs   Q4 14 vs
                                                                                                                                        2013      Q4 13
                                                                                                                                           %          %
Punitaqui                 Copper in concentrates                      kt      3.2     3.3     2.6     2.7     2.8     11.4     11.8      (3)       (13)
                          Silver in concentrates                      koz      25      21      18      20      28       87      101     (14)         12
Punitaqui - total production including third party feed 
                          Copper in concentrates                      kt      3.3     3.3     2.6     2.8     2.9     11.6     12.0      (3)       (12)
                          Silver in concentrates                      koz      25      22      18      20      29       89      103     (14)         16
                          Total Copper metal                          kt     18.5    18.0    17.3    15.4    15.9     66.6     86.4     (23)       (14)
                          Total Copper in concentrates                kt     69.4    66.7    71.9    68.8    73.7    281.1    260.4        8          6
                          Total Gold in concentrates and in doré      koz     101      93      83      85     125      386      392      (2)         24
                          Total Silver in concentrates and in doré    koz     390     421     498     469     513    1,901    2,192     (13)         32
Australia (Mount Isa, Ernest Henry, Townsville, Cobar)
Mount Isa, Ernest         Copper metal                                kt     57.5    58.3    50.5    44.8    55.9    209.5    197.3        6        (3)
Henry, Townsville         Copper in concentrates                      kt        -       -       -       -       -        -      2.8    (100)       n.m.
                          Gold                                        koz      18      18      17      11      16       62       44       41       (11)
                          Gold in concentrates                        koz       -       -       -       -       -        -        1    (100)       n.m.
                          Silver                                      koz     299     264     234     221     222      941      895        5       (26)
                          Silver in concentrates                      koz      11       -       -       -       -        -       11    (100)      (100)
Mount Isa, Ernest Henry, Townsville - total production including third party feed
                          Copper metal                                kt     75.2    72.4    73.0    73.3    73.5    292.2    282.3        4        (2)
                          Copper in concentrates                      kt        -       -       -       -       -        -      2.8    (100)       n.m.
                          Gold                                        koz      20      21      21      15      23       80       58       38         15
                          Gold in concentrates                        koz       -       -       -       -       -        -        1    (100)       n.m.
                          Silver                                      koz     618     657     609     998     480    2,744    3,141     (13)       (22)
                          Silver in concentrates                      koz      11       -       -       -       -        -       11    (100)      (100)
Cobar                     Copper in concentrates                      kt     11.5    12.6    10.9    11.7    14.4     49.6     45.6        9         25
                          Silver in concentrates                      koz     107     113      99     112     121      445      428        4         13 
                          Total Copper                                kt     57.5    58.3    50.5    44.8    55.9    209.5    197.3        6        (3)
                          Total Copper in concentrates                kt     11.5    12.6    10.9    11.7    14.4     49.6     48.4        2         25
                          Total Gold                                  koz      18      18      17      11      16       62       45       38       (11)
                          Total Silver                                koz     417     377     333     333     343    1,386    1,334        4       (18)
Total Copper department 
                          Total Copper                                kt    387.5   348.5   337.3   347.9   361.5  1,395.2  1,336.2        4        (7)
                          Total Cobalt                                kt      4.0     3.8     4.3     5.0     4.1     17.2     16.0        8          3
                          Total Zinc                                  kt     19.8    11.1    16.0    24.7    19.4     71.2     87.9     (19)        (2)
                          Total Gold                                  koz     119     111     100      96     141      448      437        3         18
                          Total Silver                                koz   3,114   2,541   2,448   2,392   2,431    9,812   10,959     (10)       (22)
                                                                    
Production from own sources – Zinc assets(1)
                                                                           Q4      Q1      Q2      Q3      Q4     2014     2013    Change     Change
                                                                         2013    2014    2014    2014    2014                     2014 vs   Q4 14 vs
                                                                                                                                     2013      Q4 13
                                                                                                                                        %          %
Kazzinc
                          Zinc metal                          kt         55.9    49.2    50.0    47.8    52.3    199.3    216.2       (8)        (6)
                          Lead metal                          kt          7.2     7.4     4.1     6.7     7.5     25.7     29.8      (14)          4
                          Copper metal                        kt         11.7    10.8     8.3    15.4    12.3     46.8     50.9       (8)          5
                          Gold                                koz         148     126     120     134     126      506      579      (13)       (15)
                          Silver                              koz       1,257   1,132     757   1,206   1,178    4,273    5,251      (19)        (6)
Kazzinc - total production including third party feed
                          Zinc metal                          kt         77.1    75.3    75.9    76.1    77.2    304.5    300.4         1          -
                          Lead metal                          kt         23.9    32.2    29.3    33.0    32.0    126.5     90.6        40         34
                          Copper metal                        kt         16.3    15.4     9.8    16.9    16.1     58.2     62.4       (7)        (1)
                          Gold                                koz         190     161     159     169     186      675      708       (5)        (2)
                          Silver                              koz       4,599   5,014   6,065   6,163   7,776   25,018   18,681        34         69
Australia (Mount Isa, McArthur River)
Mount Isa                 Zinc in concentrates                kt        102.7   100.8   102.9   102.7   130.9    437.3    405.1         8         27
                          Lead in concentrates                kt         46.8    47.2    39.0    38.4    45.6    170.2    167.8         1        (3)
                          Silver in concentrates              koz       1,927   2,054   1,461   1,466   1,877    6,858    6,870         -        (3)
McArthur River            Zinc in concentrates                kt         47.3    45.2    53.3    55.7    70.1    224.3    203.3        10         48
                          Lead in concentrates                kt         10.9     9.3    11.5    12.0    13.4     46.2     45.8         1         23
                          Silver in concentrates              koz         379     297     337     338     489    1,461    1,580       (8)         29
                          Total Zinc in concentrates          kt        150.0   146.0   156.2   158.4   201.0    661.6    608.4         9         34
                          Total Lead in concentrates          kt         57.7    56.5    50.5    50.4    59.0    216.4    213.6         1          2
                          Total Silver in concentrates        koz       2,306   2,351   1,798   1,804   2,366    8,319    8,450       (2)          3
North America (Matagami, Kidd, Brunswick, CEZ Refinery)
Matagami                  Zinc in concentrates                kt         20.0    17.9    19.0    19.0    18.9     74.8     74.5         -        (6)
                          Copper in concentrates              kt          2.7     2.1     2.5     2.3     1.9      8.8      9.1       (3)       (30)
Kidd                      Zinc in concentrates                kt         14.0    10.1    22.0    13.3    15.6     61.0     67.8      (10)         11
                          Copper in concentrates              kt          9.3    10.3     8.1    10.9     9.2     38.5     36.9         4        (1)
                          Silver in concentrates              koz         572     385     506     463     712    2,066    3,234      (36)         24
Brunswick Mine            Zinc in concentrates                kt            -       -       -       -       -        -     52.0     (100)       n.m.
                          Lead in concentrates                kt            -       -       -       -       -        -     13.5     (100)       n.m.
                          Copper in concentrates              kt            -       -       -       -       -        -      3.0     (100)       n.m.
                          Silver in concentrates              koz           -       -       -       -       -        -    1,315     (100)       n.m.
                          Total Zinc in concentrates          kt         34.0    28.0    41.0    32.3    34.5    135.8    194.3      (30)          1
                          Total Lead in concentrates          kt            -       -       -       -       -        -     13.5     (100)       n.m.
                          Total Copper in concentrates        kt         12.0    12.4    10.6    13.2    11.1     47.3     49.0       (3)        (7)
                          Total Silver in concentrates        koz         572     385     506     463     712    2,066    4,549      (55)         24
North America - total production including third party feed 
Brunswick Mine            Zinc in concentrates                kt            -       -       -       -       -        -     56.1     (100)       n.m.
                          Lead in concentrates                kt            -       -       -       -       -        -     14.6     (100)       n.m.
                          Copper in concentrates              kt            -       -       -       -       -        -      3.0     (100)       n.m.
                          Silver in concentrates              koz           -       -       -       -       -        -    1,402     (100)       n.m.
Brunswick Smelter         Lead metal                          kt         20.1    18.7    17.5    16.9    21.5     74.6     75.3       (1)          7
                          Silver metal                        koz       4,555   3,120   2,852   3,727   6,125   15,824   16,146       (2)         34
CEZ Refinery(7)           Zinc metal                          kt         16.8    14.9    15.6    17.2    17.8     65.5     66.3       (1)          6
      
                                                                         Q4      Q1      Q2      Q3      Q4      2014    2013    Change     Change
                                                                       2013    2014    2014    2014    2014                     2014 vs   Q4 14 vs
                                                                                                                                   2013      Q4 13
                                                                                                                                      %          %
Other Zinc (AR Zinc, Los Quenuales, Sinchi Wayra, Rosh Pinah, Perkoa)  
                          Zinc metal                          kt        6.2     1.9     8.3     8.0     5.0     23.2     29.7      (22)       (19)
                          Zinc in concentrates                kt       70.9    70.2    72.5    76.1    76.6    295.4    262.0        13          8
                          Lead metal                          kt        3.0     2.4     3.0     3.1     3.2     11.7     11.0         6          7
                          Lead in concentrates                kt       13.2    12.7    12.3    14.2    14.5     53.7     47.1        14         10
                          Copper in concentrates              kt        0.6     0.8     0.8     0.7     0.4      2.7      2.1        29       (33)
                          Silver metal                        koz       185     133     159     148     173      613      670       (9)        (6)
                          Silver in concentrates              koz     2,403   2,249   2,247   2,748   2,581    9,825    9,162         7          7
Other Zinc - total production including third party feed     
                          Zinc metal                          kt        9.5     2.4     9.3     9.6     7.8     29.1     37.9      (23)       (18)
                          Zinc in concentrates                kt       70.9    70.2    72.5    76.1    76.6    295.4    262.0        13          8
                          Lead metal                          kt        3.0     2.4     3.0     3.1     3.2     11.7     11.0         6          7
                          Lead in concentrates                kt       13.2    12.7    12.3    14.2    14.5     53.7     47.1        14         10
                          Copper in concentrates              kt        0.6     0.8     0.8     0.7     0.4      2.7      2.1        29       (33)
                          Silver metal                        koz       185     133     159     148     173      613      670       (9)        (6)
                          Silver in concentrates              koz     2,403   2,249   2,247   2,748   2,581    9,825    9,162         7          7
Total Zinc department     
                          Total Zinc                          kt      317.0   295.3   328.0   322.6   369.4  1,315.3  1,310.6          -        17
                          Total Lead                          kt       81.1    79.0    69.9    74.4    84.2    307.5    315.0        (2)         4
                          Total Copper                        kt       24.3    24.0    19.7    29.3    23.8     96.8    102.0        (5)       (2)
                          Total Gold                          koz       148     126     120     134     126      506      579       (13)      (15)
                          Total Silver                        koz     6,723   6,250   5,467   6,369   7,010   25,096   28,082       (11)         4
                                                                       
Production from own sources – Nickel assets(1)
                                                                         Q4       Q1     Q2     Q3     Q4    2014   2013   Change     Change
                                                                       2013     2014   2014   2014   2014                 2014 vs   Q4 14 vs
                                                                                                                             2013      Q4 13
                                                                                                                                %          %
Integrated Nickel Operations (Sudbury, Raglan, Nikkelverk)
                       Total Nickel metal             kt               13.4     13.3   13.8   11.7   12.5    51.3   47.1        9        (7)
                          Total Nickel in concentrates       kt         0.1      0.2    0.1    0.1    0.2     0.6    0.5       20        100
                          Total Copper metal                 kt         4.4      3.8    4.2    3.9    3.8    15.7   16.7      (6)       (14)
                          Total Copper in concentrates       kt         9.9      9.3   10.5   10.2    8.3    38.3   37.6        2       (16)
                          Total Cobalt metal                 kt         0.2      0.2    0.2    0.2    0.2     0.8    0.7       14          -
Integrated Nickel Operations - total production including third party feed 
                          Total Nickel metal                 kt        23.2     21.7   22.6   23.1   23.1    90.5   91.0      (1)          -
                          Total Nickel in concentrates       kt         0.2      0.2    0.2    0.2    0.1     0.7    0.7        -       (50)
                          Total Copper metal                 kt         9.9      8.7    7.8    9.8    9.5    35.8   37.5      (5)        (4)
                          Total Copper in concentrates       kt        12.3     11.7   13.5   12.7   10.1    48.0   46.3        4       (18)
                          Total Cobalt metal                 kt         1.0      0.8    0.9    1.0    0.9     3.6    3.4        6       (10)
Australia (Murrin Murrin, XNA) 
                          Total Nickel metal                 kt         7.5      7.8    9.8    9.6    9.2    36.4   35.9        1         23
                          Total Nickel in concentrates       kt           -        -      -      -      -       -    4.1    (100)       n.m.
                          Total Copper in concentrates       kt           -        -      -      -      -       -    0.3    (100)       n.m.
                          Total Cobalt metal                 kt         0.5      0.6    0.7    0.7    0.7     2.7    2.6        4         40
                          Total Cobalt in concentrates       kt           -        -      -      -      -       -    0.1    (100)       n.m.
Australia - total production including third party feed 
                          Total Nickel metal                 kt         8.9      9.4   12.2   11.3   11.2    44.1   41.3        7         26
                          Total Nickel in concentrates       kt           -        -      -      -      -       -    4.1    (100)       n.m.
                          Total Copper in concentrates       kt           -        -      -      -      -       -    0.3    (100)       n.m.
                          Total Cobalt metal                 kt         0.5      0.6    0.8    0.8    0.7     2.9    2.7        7         40
                          Total Cobalt in concentrates       kt           -        -      -      -      -       -    0.1    (100)       n.m.
Falcondo                  Nickel in ferronickel              kt         0.4        -      -      -      -       -    9.4    (100)      (100)
Koniambo                  Nickel in ferronickel              kt         1.4      1.0    3.1    4.5    4.0    12.6    1.4      800        186
Total Nickel department 
                          Total Nickel                       kt        22.8     22.3   26.8   25.9   25.9   100.9   98.4        3         14
                          Total Copper                       kt        14.3     13.1   14.7   14.1   12.1    54.0   54.6      (1)       (15)
                          Total Cobalt                       kt         0.7      0.8    0.9    0.9    0.9     3.5    3.4        3         29
                                                                     
Production from own sources – Ferroalloys assets(1)
                                                                Q4      Q1      Q2      Q3      Q4    2014    2013    Change     Change
                                                              2013    2014    2014    2014    2014                   2014 vs   Q4 14 vs
                                                                                                                        2013      Q4 13
                                                                                                                           %          %              
Ferrochrome(8)                                         kt      345     335     317     287     356   1,295   1,238         5          3     
PGM(9)                 Platinum                        koz      22      21      22      24      24      91      90         1          9
                       Palladium                       koz      12      12      12      13      13      50      50         -          8
                       Rhodium                         koz       3       4       4       4       3      15      15         -          -
                       Gold                            koz       -       -       1       -       -       1       1         -       n.m.
                       4E                              koz      37      37      39      41      40     157     156         1          8
Vanadium Pentoxide                                     mlb     5.7     5.5     4.2     5.5     5.6    20.8    21.6       (4)        (2)
                                                               
Total production – Custom metallurgical assets(1)
                                                                Q4      Q1      Q2      Q3      Q4    2014    2013    Change     Change
                                                              2013    2014    2014    2014    2014                   2014 vs   Q4 14 vs
                                                                                                                        2013      Q4 13
                                                                                                                           %          %
Copper (Altonorte, Pasar, Horne, CCR)
                       Copper metal                    kt    104.2    81.3   118.4   116.3   117.8   433.8   468.3       (7)         13
                       Copper anode                    kt    128.3   125.0   141.0   101.0   126.7   493.7   514.5       (4)        (1)
Zinc (Portovesme, San Juan de Nieva, Nordenham, Northfleet)
                       Zinc metal                      kt    191.0   193.6   194.6   197.5   196.1   781.8   745.0         5          3
                       Lead metal                      kt     52.5    48.5    52.0    37.1    39.8   177.4   174.1         2       (24)
                       Silver                          koz   2,428   2,342   2,823   2,211   2,106   9,482   7,870        20       (13)
Ferroalloys
                       Ferromanganese                  kt       23      30      27      30      29     116      99        17         26
                       Silicon Manganese               kt       26      26      26      28      28     108      92        17          8
Aluminium (Sherwin Alumina)
                       Alumina                         kt      419     385     391     315     291    1,382  1,606      (14)       (31)

1   Controlled industrial assets and joint ventures only. Production is on a 100% basis, except as stated.
2   Relating to the PGM business within Ferroalloys only.
3   Copper metal includes copper contained in copper concentrates and blister.
4   Cobalt contained in concentrates and hydroxides.
5   The Group's pro-rata share of Collahuasi production (44%).
6   The Group's pro-rata share of Antamina production (33.75%).
7   The Group's pro-rata share of CEZ production (25%).
8   The Group's attributable 79.5% share of the Glencore-Merafe Chrome Venture.
9   Consolidated 100% of Eland and 50% of Mototolo.

Energy Products

Production from own sources
                  
Coal assets(1)
                                               Q4     Q1     Q2     Q3     Q4   2014    2013    Change     Change
                                             2013   2014   2014   2014   2014                  2014 vs   Q4 14 vs
                                                                                                  2013      Q4 13
                                                                                                     %          %
Australian coking coal                  mt    1.7    1.5    1.4    1.7    1.4     6.0     7.3     (18)       (18)
Australian semi-soft coal               mt    1.2    0.9    0.9    0.7    1.0     3.5     4.5     (22)       (17)
Australian thermal coal (export)        mt   11.1   11.8   14.2   16.4   12.2    54.6    48.1       14         10
Australian thermal coal (domestic)      mt    1.2    1.4    1.3    1.5    1.2     5.4     5.1        6          -
South African thermal coal (export)     mt    5.5    5.0    5.2    7.2    6.0    23.4    20.6       14          9
South African thermal coal (domestic)   mt    5.1    5.4    6.1    5.5    5.7    22.7    22.9      (1)         12
Prodeco                                 mt    4.4    5.2    5.0    4.9    4.4    19.5    18.6        5          -
Cerrejón2                               mt    3.3    2.9    3.0    2.3    3.0    11.2    11.0        2        (9)
Total Coal department                   mt   33.5   34.1   37.1   40.2   34.9   146.3   138.1        6          4

1 Controlled industrial assets and joint ventures only. Production is on a 100% basis except for joint ventures, where the Group's attributable share of
  production is included.
2 The Group's pro-rata share of Cerrejón production (33.3%).

Oil assets
                                               Q4      Q1      Q2      Q3      Q4     2014     2013    Change     Change
                                             2013    2014    2014    2014    2014                     2014 vs   Q4 14 vs
                                                                                                         2013      Q4 13
                                                                                                            %          %
Glencore entitlement interest basis
Equatorial Guinea                     kbbl  1,394   1,368   1,194   1,243   1,267    5,072    4,799         6        (9)
Chad                                  kbbl    186     321     276     714     968    2,279      186     1,125        420
Total Oil department                  kbbl  1,580   1,689   1,470   1,957   2,235    7,351    4,985        47         41


Gross basis
Equatorial Guinea                     kbbl  6,113   6,304   5,731   6,133   6,064   24,232   21,917        11        (1)
Chad                                  kbbl    619   1,067     916     975   1,326    4,284      619       592        114
Total Oil department                  kbbl  6,732   7,371   6,647   7,108   7,390   28,516   22,536        27         10

Agricultural Products

Processing / production data
                                       Q4      Q1      Q2      Q3      Q4     2014    2013    Change     Change
                                     2013    2014    2014    2014    2014                    2014 vs   Q4 14 vs
                                                                                                2013      Q4 13
                                                                                                   %          %
Farming                         kt    236     232      34     306     190      762     883      (14)       (19)
Crushing                        kt    966   1,062   1,616   1,515   1,471    5,664   3,642        56         52
Long term toll agreement        kt    101      49     157       -       -      206     541      (62)      (100)
Biodiesel                       kt    191     172     169     211     205      757     624        21          7
Rice milling                    kt     70      36      91      73      30      230     273      (16)       (57)
Wheat milling                   kt    267     262     263     257     231    1,013   1,121      (10)       (13)
Sugarcane processing            kt    809       -     723   1,092     416    2,231   2,251       (1)       (49)
Total Agricultural products     kt  2,640   1,813   3,053   3,454   2,543   10,863   9,335        16        (4)

Forward looking statements

This document contains statements that are, or may be deemed to be, "forward looking statements" which are prospective in nature. These forward looking
statements may be identified by the use of forward looking terminology, or the negative thereof such as "plans", "expects" or "does not expect", "is
expected", "continues", "assumes", "is subject to", "budget", "scheduled", "estimates", "aims", "forecasts", "risks", "intends", "positioned", "predicts",
"anticipates" or "does not anticipate", or "believes", or variations of such words or comparable terminology and phrases or statements that certain actions,
events or results "may", "could", "should", "shall", "would", "might" or "will" be taken, occur or be achieved. Such statements are qualified in their entirety by
the inherent risks and uncertainties surrounding future expectations. Forward-looking statements are not based on historical facts, but rather on current
predictions, expectations, beliefs, opinions, plans, objectives, goals, intentions and projections about future events, results of operations, prospects,
financial condition and discussions of strategy.

By their nature, forward looking statements involve known and unknown risks and uncertainties, many of which are beyond Glencore's control. Forward
looking statements are not guarantees of future performance and may and often do differ materially from actual results. Important factors that could cause
these uncertainties include, but are not limited to, those discussed in Glencore's Annual Report 2013 and "Risks and uncertainties" in Glencore's Half-Year
Results 2014.

Neither Glencore nor any of its associates or directors, officers or advisers, provides any representation, assurance or guarantee that the occurrence of the
events expressed or implied in any forward-looking statements in this document will actually occur. You are cautioned not to place undue reliance on these
forward-looking statements which only speak as of the date of this document. Other than in accordance with its legal or regulatory obligations (including
under the UK Listing Rules and the Disclosure and Transparency Rules of the Financial Conduct Authority and the Rules Governing the Listing of
Securities on the Stock Exchange of Hong Kong Limited and the Listing Requirements of the Johannesburg Stock Exchange Limited), Glencore is not
under any obligation and Glencore and its affiliates expressly disclaim any intention, obligation or undertaking to update or revise any forward looking
statements, whether as a result of new information, future events or otherwise. This document shall not, under any circumstances, create any implication
that there has been no change in the business or affairs of Glencore since the date of this document or that the information contained herein is correct as at
any time subsequent to its date.

No statement in this document is intended as a profit forecast or a profit estimate and no statement in this document should be interpreted to mean that
earnings per Glencore share for the current or future financial years would necessarily match or exceed the historical published earnings per Glencore
share.

This document does not constitute or form part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for any
securities. The making of this document does not constitute a recommendation regarding any securities.

SPONSOR

Absa Bank Limited (acting through its Corporate and Investment Banking Division)



Date: 11/02/2015 09:00:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story