LONMIN PLC - 2014 Interim Results

Release Date: 12/05/2014 08:01
Code(s): LON     PDF:  
Wrap Text
2014 Interim Results

Lonmin Plc   
(Incorporated in England and Wales)
(Registered in the Republic of South Africa under registration number 1969/000015/10)
JSE code: LON
Issuer Code: LOLMI & ISIN : GB0031192486 
("Lonmin")

Lonmin Plc
4 Grosvenor Place
London SW1X 7YL
United Kingdom
T: +44 (0)20 7201 6000
F: +44 (0)20 7201 6100
www.lonmin.com

REGULATORY RELEASE  

12 May 2014 
                                                      2014 Interim Results 
 
Lonmin Plc, ("Lonmin" or "the Company"), the world’s third largest primary platinum producer, today publishes its Interim Results 
for the period ended 31 March 2014 and an update on events to today’s date. 
 
Key Features 
 
Safety is our number one priority: 
           - Improved LTIFR to 3.23 incidents per million man hours compared to 3.66 in the prior year period 
           - We regret that we suffered one fatality at the start of H1 2014 

Results significantly impacted by the industrial action: 
           - Minimal operations during the striking period – 3.2 million tonnes produced, down 43% 
           - 155,720 of equivalent saleable Platinum ounces lost as result of the strike 
           - Saleable metal in concentrate of 215,117 Platinum ounces, down 41% on prior year period 
           - Platinum sales of 263,675 ounces – down 19% on the prior year period 
           - Basket price down 16% to $1,056 per PGM ounce despite supply side concerns around the strike action 
           - Rand unit cost at R13,058 per PGM ounce, up 46% on prior year period 
           - Underlying EBIT $34 million, down from $93 million in the prior year period 
           - Solid track record in overall concentrator recoveries – improved from 86.8% in prior year period to 87.7% 
           - Net cash of $71 million with available committed debt facilities of $589 million 
           - Cash flow requirements on resumption of operations may put the business in a net debt position. 
           - Force majeure notices issued to customers, suppliers and contractors during strike period 
               
Focus on maintaining integrity of operations, in readiness for re-start and safe and effective ramp up: 
           - Furnaces idling and being monitored; concentrators and refineries shut 
           - Pipeline stocks not fully depleted. It is intended to resume processing operations in May to process remaining 
             pipeline 
           - Available ore reserve position at 3.7 million centares provides for flexibility 
           - Cash conservation measures reduced cash outflows by around 60% of normal operating costs and capital 
             expenditure 
 
Market outlook:  
           - Deficits in 2014 as protected strike continues and South African supply shrinks  
           - Improving automotive demand and sustained and increasing jewellery demand 
               
Guidance: 
           - K4 return to be delayed  
           - Sales guidance will be predicated on timing of return to work   
           - Expect unit cost per PGM ounce to be above wage inflation and capex to be lower than previous guidance of $210 
             million – we will provide guidance in due course  
 
Ben Magara Chief Executive Officer, said: "This has been a challenging first half of the year, latterly dominated by protracted 
industrial action across the PGM sector. Whilst we continue to work to resolve this dispute we have also taken decisive and early 
action to reduce cash burn, to safeguard our great assets and protect our balance sheet integrity ahead of a safe and successful 
ramp up when the strike ends; something we have demonstrated we excel in."                                           

Financial Highlights  
                                          6 months to       6 months to 
                                        31 March 2014     31 March 2013 
                                                                        
Revenue                                         $578m             $735m 
Underlying (i) operating profit                  $34m              $93m 
Operating (loss) / profit (ii)                $(131)m              $90m 
Underlying (i) profit before taxation            $26m              $89m 
(Loss) / profit before taxation               $(278)m              $54m 
Underlying (i) earnings per share                3.5c             12.3c 
(Loss) / earnings per share                   (35.5)c             13.3c 
                                                                        
Trading cash outflow per share (iii)          (12.5)c           (17.2)c 
Free cash outflow per share (iv)              (23.4)c           (31.9)c 
                                                                        
Net cash as defined by the Group (v)             $71m             $194m 
                                                                        
Interest cover (times) (vi)                     21.0x              9.1x 
Gearing (vii)                                       -                 - 
                                                                        

 
Footnotes: 

(i)      Underlying results and earnings per share are based on reported results and (loss) / earnings per share excluding the effect of special items as disclosed in note 3 to 
         the interim statements. 
(ii)     Operating (loss) / profit is defined as revenue less operating expenses before impairment of available for sale financial assets, finance income and expenses and 
         before share of (loss) / profit of equity accounted investments. 
(iii)    Trading cash flow is defined as cash flow from operating activities.
(iv)     Free cash flow is defined as trading cash flow less capital expenditure on property, plant and equipment and intangibles, proceeds from disposal of assets and 
         dividends paid to non-controlling interests. 
(v)      Net cash as defined by the Group comprises cash and cash equivalents, bank overdrafts repayable on demand and interest bearing loans and borrowings less 
         unamortised bank fees, unless the unamortised bank fees relate to undrawn facilities in which case they are treated as other receivables. 
(vi)     Interest cover is calculated for the twelve month periods to 31 March 2014 and 31 March 2013 on the underlying operating profit divided by the underlying net bank 
         interest payable excluding exchange differences. 
(vii)    Gearing is calculated as the net debt attributable to the Group divided by the total of the net debt attributable to the Group and equity shareholders’ funds.

                                               

ENQUIRIES 
 
Investors / Analysts: 
Lonmin 
Tanya Chikanza (Head of Investor Relations)                      +27 11 218 8358 /
                                                                  +44 20 7201 6007 
Floyd Sibandze (Investor Relations Manager)                        +27 11 218 8300 
 
Media: 
Cardew Group 
James Clark / Emma Crawshaw                                       +44 20 7930 0777
Sue Vey                                                            +27 72 644 9777
 
Notes to editors 
 
Lonmin, which is listed on both the London Stock Exchange and the Johannesburg Stock Exchange, is one of the world's largest 
primary producers of PGMs. These metals are essential for many industrial applications, especially catalytic converters for internal 
combustion engine emissions, as well as their widespread use in jewellery. 
 
Lonmin's operations are situated in the Bushveld Igneous Complex in South Africa, where nearly 80% of known global PGM 
resources are found. 
 
The Company creates value for shareholders through mining, refining and marketing PGMs and has a vertically integrated 
operational structure - from mine to market. Lonmin's mining operations extract ore from which the Process Division produces 
refined PGMs for delivery to customers. Underpinning the operations is the Shared Services function which provides high quality 
levels of support and infrastructure across the operations. 
 
For further information please visit our website: http://www.lonmin.com 
Chief Executive Officer’s Review 
 
1. Introduction 
 
The six month period to 31 March 2014 was significantly impacted by the protracted wage strike which has beset the platinum 
industry in South Africa and is now in its sixteenth week. The length of the strike has put an industry that is already struggling with 
the combined pressures of low PGM prices and high cost inflation under enormous pressure and challenges the viability of some of 
the marginal operating shafts in the industry.  
 
At Lonmin, production at both the mining and processing divisions at our Marikana operations have been minimal since 23 January 
2014 when the Association of Mineworkers and Construction Union (AMCU), representing 70% of the workforce (as at 31 March), 
commenced protected strike action, impacting performance for the half year. 
 
    -    Sadly we lost a colleague due to a vehicle related accident at E3 shaft. 
    -    We mined 3.2 million attributable tonnes during the period, down 43% from the prior year period. Production momentum 
         in the first quarter was impacted by Section 54 safety stoppages and low productivity levels arising from the tensions 
         around the then wage negotiations. In quarter two, operations have been at a virtual standstill for nine of the twelve 
         possible weeks of production as a result of the strike. 
    -    Production losses directly associated with industrial action are around 2.6 million tonnes, equivalent to 160,475 ounces of 
         saleable Platinum ounces, of which 155,720 ounces were directly related to the strike. 
    -    The depressed PGM pricing environment experienced in the first quarter of the financial year continued in the second 
         quarter despite supply side concerns around the strike actions. 
    -    We delivered 215,117 ounces of Platinum in concentrate, down 41% from the prior year period.  
    -    However we achieved Platinum sales of 263,675 ounces during the period, down 19% as we benefitted from a healthy 
         closing pipeline position at the end of the 2013 financial year. In addition, we anticipated the strike towards the end of 
         quarter one and managed our stock to enable us to continue to supply our customers into quarter two.  
    -    We have made progress with our unit cost containment in the last 18 months, but as a result of relatively low production 
         volumes unit cost of production increased by 46% to R13,058 per PGM ounce when compared with the prior year period.  
    -    The favourable ZAR/USD exchange rate was partially offset by the low PGM price environment and has resulted in 
         underlying EBITDA of $103 million (excluding fixed production overheads incurred during the strike and other strike 
         related costs which have been classified as special costs), compared to $171 million in the prior year period. When the 
         strike related costs are included the operating loss in the half year was $131 million, compared to a profit of $90 million in 
         the prior year period and loss before tax of $278 million compared to $54 million profit in 2013. 
      
We have focused on safeguarding the business through a number of initiatives. This has been done with a view to ensuring an 
efficient ramp up when operations resume but also retaining the flexibility to effect further measures to safeguard the assets in the 
event of a prolonged strike: 

    -    We took decisive action on cost containment and cash conservation measures during the strike and have seen normal cash 
         outflows reduce by around 60%, with potential to decrease further. Our spend on capital was $46 million and our net cash 
         balance was $71 million at 31 March 2014 with available committed debt facilities of $589 million. This compares with net 
         cash of $201 million at 30 September 2013.  
    -    We issued force majeure notices to our PGM customers, suppliers and contractors. 
    -    We secured the integrity of our operations ahead of the strike and have been idling the furnaces. This, combined with the 
         healthy available ore reserve position which stood at 3.7 million centares and our solid track record in consistently 
         achieving high concentrator recovery rates means we are well positioned to safely and effectively ramp up when 
         operations resume as we did in 2012. 
    -    In anticipation of finding a solution to the strike we will start the processing operations during May 2014 to process the 
         remaining material in the pipeline. However, if the strike continues, we will fully deplete the pipeline and limit further cash 
         outflow. 
    -    We have a programme for further cash conservation which potentially includes a restructuring plan should the anticipated 
         start up not materialise. This will further reduce the daily cash burn. 
                                      

2. Safety 
 
Regrettably one of our colleagues, Mr Siyabonga Sibango, was fatally injured in an underground vehicle accident at E3 shaft on 26 
October 2013. We extend our deepest condolences to his family and friends. This fatality and a rise in fatalities across the 
Rustenburg region contributed to the production losses attributable to management induced stoppages and Section 54s 
experienced only during quarter one. The safety of our employees is central to all that we do and we continue to emphasise the 
importance of applying safe working practices throughout our operations. Notwithstanding the loss of our colleague Siyabonga, our 
safety record during the first half of the year was encouraging. Our rolling twelve month average Lost Time Injury Frequency Rate 
(LTIFR) to 31 March 2014, improved to 3.23 incidents per million man hours, compared to 3.66 at 31 March 2013 and reflects the 
reduced hours of work as a result of the strike.  
 
3. Production Performance  
 
Our production performance in the first half of the 2014 financial year declined significantly as a result of the industrial action led 
by AMCU. This unprecedented strike action has rendered the latter part of the half year unproductive, with limited mining activity 
from contract mining.  
 
Mining Division 
 
Total tonnes mined during the half year of 3.2 million, showed a decrease of 43% when compared to the prior year period 
production of 5.7 million tonnes. The Marikana underground mining operations produced 3.0 million tonnes during the half year, a 
decrease of 2.3 million tonnes or 44% on the prior year period as the strike impacted all underground shafts. 
 
Production from our Merensky opencast operations of 155,000 tonnes was 46% lower than the prior year period as this operation 
is run by non-striking contractors but has been scaled back due to the subdued price environment. Pandora (100%) production 
decreased by 107,000 tonnes, or 41% on the prior year period due to the impact of the strike.  
 
In total, 2,806,000 tonnes of underground production were lost during the half year, of which 2,592,000 tonnes were lost due to 
industrial action, 191,000 tonnes related to Section 54 safety stoppages and 23,000 tonnes to management induced safety 
stoppages. This compared to a total of 220,000 tonnes lost in the prior year period of which 101,000 tonnes were due to Section 54 
safety stoppages, and 40,000 tonnes and 79,000 tonnes were due to management induced safety stoppages and labour stoppages 
respectively.  
 
Ore reserve development 
The reserve position remains healthy such that our immediately available ore reserves at Marikana at the end of the period, were 
3.7 million centares. This level of ore reserves represents an average of 18 months based on production levels before the start of 
the strike and will support our ramp up programme when operations re-start as we will have the necessary flexibility to deploy our 
production stoping crews and effectively ramp up. 
 
Process Division 
 
Concentrators 
Operations in the Process Division have also been impacted by the strike action in view of the minimal production from mining. 
Total tonnes milled in the half year period at 3.4 million tonnes were down 2.3 million tonnes on the prior year period or 41% as 
the concentrating division was also shut down from 23 January.   
 
Underground milled head grade decreased by 0.7% to 4.60 grammes per tonne (5PGE+Au) compared to the prior year period. 
Overall the milled head grade was 4.50 grammes per tonne, down 1.3% on the prior year period due to a change in mix between 
the higher grade and lower grade shafts.  
 
Underground concentrator recoveries for the half year increased by 1.2% to 87.9% when compared to the prior year period. Overall 
concentrator recoveries for the period continued the upward improvements and increased by 1.1% to 87.7% when compared to 
the prior period. 
 
Total PGMs and Platinum in concentrate for the period under review were 412,170 and 215,117 saleable ounces respectively being 
40% and 41% lower respectively when compared to the prior year period as a result of strike related concentrator plant shut down. 

Smelters and Refineries 
Our furnaces have idled and our refinery plants have been shut during the strike period to save power and costs. As a result, total 
refined production for the period at 257,217 ounces of saleable Platinum was down 21% when compared against the prior year 
period. PGMs produced in the half year were 543,179 ounces, representing a decrease of 12% on the prior year period.  
 
Pipeline 
At this stage we have not fully depleted our pipeline stocks. We will however start the processing operations comprised of three 
concentrators and one furnace in May to process ore from the contract mine areas as well as third party concentrate and the 
remaining material in the pipeline.  
 
Platinum sales for the half year at 263,675 ounces were 19% lower than the prior year period, and the 547,413 PGM ounces 
achieved during the period, were 6.7% lower than the prior year period. 
 
Production statistics for Quarter Two of the year can be found in a separate announcement published today or on the Company’s 
website: www.lonmin.com. 
 
4. Wage Negotiations and Strike Update 
 
Industrial relations remain an increasing challenge and risk in South Africa’s mining industry with the platinum sector losing billions 
of Rand in revenue to wage strikes since 2011. Lonmin and AMCU have been engaged in wage negotiations around increases which 
would be effective from 1 October 2013, with AMCU seeking a basic wage of R12,500 per month for the lowest level employee. 
Following non-resolution, a protected strike, unlike the illegal strike we experienced during the Events at Marikana in August 2012, 
commenced on 23 January. The strike involves an estimated 70,000 AMCU members across the three affected platinum producers, 
namely Lonmin, Impala Platinum Holdings and Anglo Platinum (the Companies). This action has seen the Companies come together 
in seeking resolution to this impasse. Although unsuccessful in gaining resolution, we are grateful to the South African Government 
for its intervention early on in the process, through the Commission for Conciliation, Mediation and Arbitration (CCMA), and more 
recently through the Department of Labour. More still needs to be done with regards to law enforcement in order to allow 
employees freedom to come to work should they so wish.  
 
Revised Settlement Offer 
In April 2014, the Companies tabled a revised settlement offer in respect of the wages and benefits to AMCU and its members. This 
followed engagements between the CEOs of the Companies and the President of AMCU, Mr Joseph Mathunjwa, and AMCU’s 
national leadership, facilitated by the officials of the Department of Labour.  
 
This revised offer ensures that the minimum total cash remuneration (comprising basic wages and holiday, living out and other 
allowances) for entry level underground employees will rise to R12,500 per month take home pay before deductions from 1 July 
2017. To achieve this, the basic salary for the Lonmin employees would rise by between 7.5% and 9.5% per year across the various 
bands of our employees. 
 
Fundamentally, AMCU’s insistent demand to achieve R12,500 basic monthly salary over four years still represents an annual 
increase of 29%. This remains completely unaffordable and would have disastrous consequences for our business, people, 
communities and country if we were to agree to it as it will result in shaft closures and job losses. In addition, the prolonged 
industrial action by AMCU has made restructuring inevitable. 
 
The revised settlement offer, represents an increase from the 7.5% to 9% per year CCMA offer, and the 7.5% to 8.5% per year offer 
made prior to the commencement of the strike. The Companies, acting in good faith, have made various attempts over the last 
three months to end the industrial action. The offer will result in an overall 9.7% increase in total cost to Company of our current 
salary and wage bill for the 2014 financial year. Labour costs account for approximately 55% to 60% of annual production costs and 
unsustainable increases in these costs will be damaging to the viability of the industry and the South African economy.  
 
The offer currently includes the payment of wage increase back pay related to the annual increase from 1 October 2013 for Lonmin 
employees, for which there is no legal requirement. The affordability of the back pay becomes increasingly challenging as the 
duration of the strike increases. The principle of ‘no work, no pay’ applies for the duration of the strike. 
 
Alternative Solutions  
Unfortunately this revised offer has been rejected by AMCU. As a result, Lonmin similar to Impala and Anglo Platinum has now 
taken the offer directly to its employees as individuals, as allowed by the South African labour law. We expect to be able to assess 
the success of the return to work by the end of May 2014 with production provisionally scheduled to start in June if successful. In 
the event that the positive responses we have received from employees are not sufficient to enable operations to resume, the 
Company will consider its other options to mitigate against further costs and conserving cash in order to protect our business. 
These may include measures to reduce capital and a review of the business operations. Fundamentally, the longer the strike 
continues, the greater the impact on our higher cost shafts, our ability to return to a normal operating environment and critically, 
on jobs. 

 
Our Philosophy on Unions and Wage Negotiations 
 
We are committed to finding peaceful solutions to challenging issues and believe that the fact we have been talking with AMCU, 
and other unions represented at Lonmin and directly with our employees, reflects Lonmin’s commitment to finding peaceful and 
sustainable solutions to these issues. We are resolute that our improving relationships with employees and unions will continue 
when operations resume. 
 
We have worked hard to rebuild relationships with both our majority and minority unions in what is a changing landscape – not just 
in the mining industry but other sectors as well. We acknowledge that employees choose the union they wish to represent them. 
We are clear about the fact that the Company’s future, and by implication its profitability, rests as much on the relationships it has 
with its employees and wider stakeholder group as it does on the core fundamentals of mining and the market. Lonmin is focused 
on improving its relationship with its employees and empowering managers to have a direct relationship with their employees. 
Instrumental in the process has been the establishment of an internal communications structure and establishment of workplace 
forums to facilitate a two way dialogue. This has been particularly useful in the two-way communication we have had with our 
employees around the status of negotiations and in receiving feedback during the strike. 
 
Impact on Employees and our Communities 
While the negative impact of the strike on our national GDP and the country’s balance sheet is well understood, the impacts on the 
ground – in the communities around our operations and from which we draw our labour – are far reaching given the multiplier 
effect of the platinum mines’ revenues and expenditures. The strike has also eroded the health and financial position of our 
employees, with many workers in an unstable financial situation. We believe much responsibility and care should be exercised by 
union leadership in educating their members on the economic realities of our business, as opposed to continually advancing 
arguments that price jobs beyond what the markets can afford.  
 
Holistic Solution Required as Response to the Social Issues 
We acknowledge that there are historical labour inequities in South Africa. We believe that many steps have been and are being 
taken towards remedying these inequalities over the years, but we also acknowledge that much more still needs to be done. It has, 
however, been recognised that business cannot deal with many of these socioeconomic challenges alone and a holistic solution is 
required for meaningful and sustainable changes to the labour system. We welcome the greater involvement of Government in this 
area.  
 
Meaningful and sustainable changes to the labour system are required. However, structural change can only be achieved over time 
through a carefully considered labour compact that not only considers the disposable income of workers, but also the 
socioeconomic wellbeing of workers and the mining communities that host our operations; and the sustainability of these 
operations. 
 
5. Cash Management 
 
Cash and Cost Conservation 
Since the strike started on 23 January we have implemented a series of cash conservation measures, resulting in reducing normal 
cash outflows by around 60% of normal operating costs on the back of a similar reduction in both planned operating costs and 
capital expenditure. However, given our single location dependency, these measures have been taken with a view to maintaining a 
business state most prepared for a safe and rapid ramp up on resolution of the strike. Measures taken include temporarily putting 
on hold leave encashment and encouraging non-striking employees with overdue leave to go on leave. This has been voluntary and 
we are grateful to all employees who actioned this call for assistance.  
 
Net cash as at 31 March 2014 reduced to $71 million from $201 million at 30 September 2013. The Group has additional support in 
the form of its debt facilities comprised of a revolving credit facility of $400 million at a Lonmin Plc level and three bilateral facilities 
of R660 million each, the sum total of which is equivalent to $189 million at a subsidiary level. These facilities have been committed 
and are available to use. 
 
The Company has a robust programme for further cash conservation measures to protect the assets, which may include a 
restructuring plan should the anticipated start up in June 2014 not materialise. This will further reduce the daily cash burn rate. 
Whilst this will conserve cash and is crucial in the near term, it will ultimately impact our ability to quickly ramp up when operations 
eventually resume. 
                                      

Capital Expenditure 
As a result of the strike, we scaled back our capital expenditure in line with our management agenda to conserve cash by deferring 
major capital spend during this period. As a result, capital spend in the half year was $46 million compared to $73 million in the 
prior year period. Capital expenditure in the first six months was mainly on stay in business capital across the various shafts and 
processing facilities, development of ore reserves at K3, Rowland and Saffy shafts as well as critical ore pass rehabilitation work on 
K4. The hostel conversion programme continued as it is an important part of improving the living conditions of our employees. The 
feasibility study on the bulk tailings retreatment initiative was also completed. We will start this project when cash flows permit. 
 
Customers and Suppliers 
We have issued force majeure notices to suppliers and contractors and placed a moratorium on new hires, travel and training, 
unless absolutely critical or already contracted. We have also sadly declared force majeure with our customers due to the 
prolonged strike. We are, however, still able to deliver a small amount of metal being returned from our tolling contracts. The 
relationships we have with our customers are longstanding. We are grateful for their understanding and we continue to find ways 
to manage their requirements. 
 
6. Ramp Up 
 
We have developed a comprehensive ramp up programme aimed at ensuring a safe start up when employees return to work. This 
has been presented to the Department of Minerals and Resources (DMR) to ensure there is alignment to our zero harm aspirations 
when we start up. Our ability to ramp up safely was demonstrated in the first quarter of the 2013 financial year following the 
Events at Marikana in 2012. Unlike 2012, we anticipated the current industrial action and managed an orderly shut down of our 
operations and mitigated the risks to the integrity of our infrastructure. We secured our shafts and underground work areas were 
made safe whilst heavy equipment has been parked away in clean dry places for its protection. We also continue to carry out 
routine maintenance.  
 
Furnace Integrity 
The Furnaces performed well up to the commencement of the strike. Furnace One reliability was increased by the new barrel 
installed in June 2013. Furnace Two also performed well and the design changes made to the roof proved to be successful. 
 
During this extended strike, maintaining the integrity of the furnaces has remained critical to ensure a successful start up of the 
smelting operations. The measureable and monitored parameters on the furnaces (furnace movement and hearth temperatures) 
are still showing a stable trend after sixteen weeks. The furnaces are monitored daily and changes are made as required to ensure a 
reduced impact on furnace integrity. The concentrators, base metal and precious metal refineries have been safely shut down in 
such a manner as to enable an efficient start up in May.  
 
Initial Phase 
As part of the production ramp up, we will secure the return of our employees as many went home at the beginning of the strike. 
We will invest many hours in safety training and carrying out medicals on the employees before re-opening operations in order to 
minimise the risk of any safety failure. The initial phase of the ramp up will also involve checks of the operations. Our ongoing 
monitoring of work areas indicate that there has been minimal damage to underground workings to date although actual 
conditions will become more apparent once the rock faces are re-started. The healthy state of our ore reserves will provide us with 
the flexibility we will need to resume operations as we will have the option to move crews from compromised areas to more secure 
levels as we re-start.  
 
The longer the strike continues the greater the risk that the strike will cause irreparable damage to our assets and make the 
operations unsafe and more costly for us to rehabilitate and safely re-start.   
 
7. Going Concern 
 
The Directors have assessed the Group’s ability to continue as a going concern and have concluded that the Group’s capital 
structure provides sufficient head room to cushion against downside operational risks and minimise the risk of breaching debt 
covenants on the assumption that the strike action will end and employees return to their stations in June 2014. However, a 
delayed resolution of the strike action would require the Group to take other operational measures to ensure that it has sufficient 
funds to facilitate all ongoing operations on start up. The lack of clarity over the end date of the strike represents a material 
uncertainty that may cast doubt about the going concern assumptions. 
 
Nevertheless, based on the Group’s expectation that the strike action will be resolved within a reasonable period and further 
management actions which would be taken if this proved not to be the case being possible and successful, the Directors believe 
that the Group will continue to have adequate financial resources to meet obligations as they fall due and comply with its financial 
covenants and accordingly have formed a judgement that it is appropriate to prepare the financial statements on a going concern 
basis. Therefore, these financial statements do not include any adjustments that would result if the going concern basis of 
preparation is inappropriate.                                        

8. Transformation 2014 Targets   
 
The Mining Charter, which was originally issued in October 2002 and revised and reissued in September 2010 alongside a new 
Scorecard, following consultation with government and industry stakeholders, creates a statutory framework which formalises the 
mining industry transformation responsibilities. The charter and scorecard are a fundamental element of our licence to operate as 
it is both a legal obligation which is linked to the delivery of our Social Labour Plan (SLP) commitments and the right thing to do. We 
are committed to contributing towards this fundamental change that is required and we continue to strive to do so. A healthy and 
profitable Lonmin brings benefits to all stakeholders, be they investors, our employees, the authorities or communities in which we 
operate.  
 
We have a robust plan around achieving our December 2014 goals and have made significant inroads in working towards some of 
them. We have six headline transformation targets, linked to our SLPs: 

     -    Black Economic Empowerment (BEE) equity – Achieve 26% equity ownership in Lonmin by Historically Disadvantaged 
          South Africans (HDSAs); 
     -    HDSAs in management – Increase the participation of employees from designated groups within each level of 
          management to at least 40%; 
     -    Women in Mining – Increase female participation at the mine to 10%; 
     -    Procurement – Meet the Charter targets on our discretionary spend with HDSA suppliers;  
     -    Housing and accommodation – Work towards individual and family accommodation for employees, moving away from 
          the single sex hostel system; and  
     -    Communities – Improve the quality of life of employees and the communities around our operations. 
 
BEE Equity Ownership 
 
Lonmin is continuing with its projects to achieve 26% BEE equity ownership by December 2014. This is not only because of a 
regulatory requirement but because our values support improving and developing the communities where we are operating and 
aligning the interests of employees and host communities with those of shareholders. In that context, engagements are ongoing on 
three transactions to increase our BEE equity ownership: 

     -    a transaction with the Bapo ba Mogale community to convert royalties and their share in Pandora into equity; 
     -    an Employee Share Ownership Plan (ESOP); and 
     -    a Community Trust. 
 
Engagements on these transactions are ongoing. The ongoing strike action is delaying the consultation process and 
implementation, however, we are confident that the above proposed transactions or a combination thereof will be implemented 
timeously so that we achieve our targets.  
 
HDSA Management 
 
Lonmin has committed to achieve 40% HDSA in management by the end of 2014. As at 31 March 2014, 49% of Lonmin’s 
management was HDSA, including white females, as prescribed by the DMR. We also monitor our HDSA percentage, excluding 
white females and this was 38% at the end of the half year. We continue to focus on this and are striving to achieve this target by 
the end of the calendar year. For Lonmin, it is not just compliance but more about creating an environment where all employees 
irrespective of their race and gender are able to be their best as this ultimately also benefits Lonmin and the greater community. 
 
Women in Mining 
 
We continue to target women to join the industry as we believe this to be beneficial for the industry and our wider transformation 
goals. However, this is an area in which we face both historical and cultural challenges, not least in making underground work 
appealing to women, something which has not always been easy. We are targeting women for our mining related skills 
programmes, but acknowledge that achieving the 10% of women in mining target by the end of the 2014 calendar year will remain 
a big challenge. The uptake of women has been severely impacted by the current industrial action. In addition, the drive for this 
programme of recruitment will likely be impacted by cash constraints, given the strike.  
                                     

Procurement  
 
Lonmin has made excellent progress in this area in meeting our targets as we aim to broaden economic participation in our host 
communities. However, many local HDSA companies do not have the experience or resources to meet our business needs. We 
introduced supplier development programmes as an integral part of our preferential procurement strategy to bridge the gap. The 
strike has significantly impacted our HDSA suppliers as we have issued force majeure to some of them, many of whom are in the 
Greater Lonmin Community (GLC). 
 
Housing and Accommodation 
 
Hostel Conversions  
Lonmin is in the last year of fulfilling its commitment to convert its hostel blocks to decent and affordable family and single units. Of 
the 128 single-sex traditional hostel blocks, 108 blocks were converted as at the end of the 2013 financial year.  Our aim is to 
complete the remaining 20 hostel blocks during this calendar year at an estimated cost of R90 million. As in earlier phases of this 
programme, we have continued to contract this work out to HDSA GLC contractors. Our ability to complete the conversion on time 
is however being hampered by the ongoing strike. At the end of the programme the 128 converted blocks will yield a total of 2,664 
units, comprised of 796 family and 1,868 single units. 
 
Communities 
 
We continue to look at the most effective ways of improving employees’ living conditions and create programmes to deliver on 
these commitments. We have launched a comprehensive review of requirements to create sustainable communities. We will 
review infrastructure requirements, such as number, location and type of accommodation units required and the rental and 
ownership mix, as well as the financial commitment necessary to achieve this.  We are partners with all levels of local government, 
the Department of Human Settlements and projects such as the Presidential Task team’s Rustenburg living conditions initiative.  
 
Marikana Extension 2 Housing Project 
On 29 October 2013, we donated the Marikana Extension 2 comprising 50.1 hectares, to the Rustenburg Local Municipality under 
the direction of, and in collaboration with the North West Member of the Executive Committee (MEC) responsible for Human 
Settlement under the auspices of the Special Presidential Initiatives. The donated land comprises 850 serviced stands that will be 
developed by the Rustenburg Local Municipality utilising provincial and national government funding. At this early planning phase, 
rezoning and consolidation is being considered to develop approximately 2,600 of mixed housing schemes. The beneficiaries will be 
the Marikana community of which Lonmin category 4 to 9 employees represent the greatest portion. 
 
9. Strategy – Development and Optimisation 
 
Our immediate priority to enhance value creation through higher asset utilisation for improved returns has been adversely 
impacted by the prolonged strike. Saffy is among the key ramp up shafts where progress has been disrupted and we continue to 
prepare this shaft for its re-start. We anticipate continuing with our plans to deploy crews from low margin shafts to enhance 
returns and drive down costs but industrial action will delay the timing to steady state production. We will provide more detail 
around this in due course.  
 
The momentum established at Rowland following the gains achieved from the de-bottlenecking project have been eroded by the 
industrial action. The full impact will be better understood as employees return to work. 
 
K4, an important shaft in our portfolio, was scheduled to be brought back from care and maintenance in the 2015 financial year, 
predicated on improved market conditions and the Company being cash flow positive. We now anticipate that as a consequence of 
the industrial action, K4 will continue to be on care and maintenance until the Company is cash flow positive and market 
circumstances allow for its return. The exact timing of when this shaft may be brought back will be better understood once the 
strike has ended. The delay is likely to result in K4’s ounces being replacement rather than growth ounces.  
 
Exploration 
Lonmin has PGM exploration joint ventures with Vale and Wallbridge Mining on properties around the Sudbury Basin in Ontario, 
Canada. Lonmin as the operator of the Vale Sudbury PGM joint venture will be carrying out further drilling and studies on the 
Denison PGM resource as well as pursuing targets on other properties. We are planning to spend approximately $5 million on 
exploration on our Wallbridge Sudbury Camp and North Range joint ventures this year, with the summer programme focused on 
trenching and drilling of targets identified from extensive geophysical surveys. 
                                        

10. Markets  
 
Looking beyond the current challenges, we remain confident about the fundamentals of PGMs as the world will continue to need 
platinum and other PGMs. Emissions legislation continues to tighten in established markets and is planned to do the same in 
emerging ones. Whilst we will always see thrifting and three-way substitution, new markets and applications continue to open up. 
Whilst we are going through a very tough period in terms of demand and prices, we remain optimistic on the future fundamentals 
and that the protracted strike may have brought that future nearer. 
 
Automotive Production – positive growth bodes well for PGM demand 
Vehicle production trends continue to moderately increase with a rise of 13.7 million units recorded between 2007 and 2013; 2.2 
million were added last year alone. LMC Automotive forecast growth in most of the markets in 2014 and almost 50 million units are 
expected to be added between 2013 and 2025.  
 
Automotive PGM Demand 
The return to growth in many automotive markets coupled with tightening emissions legislation bodes well for demand in PGMs. 
Europe is expected to remain the biggest automotive platinum market where demand will be driven by ever stricter emissions 
legislation and a sustained diesel market. Platinum demand will also continue to grow in Heavy Duty Diesel and Non-road demand. 
Automotive palladium demand rose strongly in North America, Western Europe and China. The biggest increase in demand was 
recorded in China, where palladium-rich gasoline cars dominate and where vehicle production was up by 12%. Rhodium 
automotive demand also rose in all major markets except Japan and India. Rhodium is expected to retain an important role in 
automotive catalyst formulations and demand is expected to grow.  
 
Jewellery Remains a Platinum Affair 
The China platinum jewellery market grew year on year from 2012 to 2013 by an estimated 3% according to Platinum Guild 
International and is forecast to grow by a further 5% in 2014 if current price ranges prevail. The Indian wedding market is growing 
due to a larger middle class and active promotion of the engagement ring in addition  to wedding bands only. SFA Oxford estimates 
that India’s demand for platinum jewellery could more than double over the next ten years.  
 
Fuel Cells Vehicles – a real market for platinum 
Automotive fuel cell technology represents a growing market for our metals, with several automakers on track to put noteworthy 
numbers of vehicles into the mainstream market in 2015. The success of Fuel Cell Vehicles is a virtuous circle, as loadings come 
down to affordable levels fuelling infrastructure gets built and, governments give tax breaks to get emissions down - much of this 
growth potential relies on the nature of these tax breaks offered by legislators in given markets. Stationary fuel cells also provide 
growth opportunities. 
 
Investment Gaining Momentum 
Last year began quietly for platinum Exchange Traded Fund (ETF) demand until Absa Bank (Absa) launched its NewPlat ETF in May 
2013. Within nine weeks it became the largest single platinum ETF and finished the year holding 910,000 ounces. The Absa ETF was 
almost entirely responsible for global ETF holdings rising by 909,000 ounces to 2,559,000 ounces in 2013. January 2014 saw the first 
concerted selling from the Absa ETF which dropped to 885,000 ounces by February, but buying then picked up and the fund has 
now breached 1 million ounces. The major palladium ETF’s had a subdued 2013 with holdings at 2,035,000 ounces. The two South 
African palladium ETF’s, launched at the end of March this year, were met with interest and could potentially add to the already 
deep fundamental deficit placing further pressure on prices and potentially accelerating a switch back to platinum and rhodium.  
 
South African Strike Impacts 2014 
By the end of March, SFA Oxford estimated a loss of 640,000 ounces of platinum, 300,000 ounces of palladium and 85,000 ounces 
of rhodium supply from South African operations as a result of the strike. However, this does not include the possibility of lost 
production from re-starting mines up to steady state levels and the restocking of the process pipeline stocks. Taking this into 
consideration South African output could drop to just over 3 million platinum ounces in 2014 compared with 4.13 million ounces in 
2013. The strikes have also widened the palladium market deficit to 1.8 million ounces in 2014. There are also concerns over future 
supplies of palladium from Russia, given geo-political events in that region. Reverse substitution of palladium back to rhodium in 
three-way autocatalysis could relieve some pressure on stocks. Currently it is once again cheaper to manufacture a rhodium-rich 
catalyst. The impact of current strike action could lead to a deficit of 150,000 ounces of rhodium for this year. 
 
PGM recycling an Established Supply Competitor 
Global PGM recycling has grown from less than 1 million ounces in 2000 to 4.6 million ounces in 2013. Palladium has grown the 
most, it being 9.5 times higher than in 2000, compared to platinum and rhodium which are 3.6 times and 2.6 times higher 
respectively. This growth can be attributed to both the cocktail of metals and higher loadings of metals in catalysts that are coming 
back to market via scrapped vehicles. Recycling has become essential to ensure sustainability of the PGM market, helping to cap 
extreme metal price volatility, particularly with supply from South Africa contracting since 2006.                                      

Diversity and Innovation Sustain PGM Markets 
The market will be in significant deficit in 2014, drawing down at least 1 million ounces of above ground stocks, possibly more, 
depending on duration of the strike. Looking ahead, automotive production will continue to grow, legislation continues to tighten 
and jewellery will remain strong especially in China and is growing in India. 
 
Opportunities lie with a stronger recovery in Europe and higher loadings as Euro 6 is promulgated in 2014, while jewellery demand 
in China is growing strongly beyond bridal. China was the world’s largest consumer of platinum in 2013, mainly in jewellery. In 
addition, the Indian platinum jewellery market is burgeoning with supportive demographics. Jewellery looks set to continue to be 
an important and growing end use for platinum adding diversity to its portfolio. The risk of substitution, however, remains ever 
present. 
 
11. Legislative Environment - MPRDA Update 
 
MPRDA Update 
 
The end of February saw an announcement that the South African Mineral and Petroleum Resources Development Act (MPRDA) 
Amendment Bill was going to be delayed to allow for further consultations to determine whether the oil and gas sectors should be 
dealt with in a separate legislation. Notwithstanding this publicly announced delay, it was subsequently announced by the Public 
Portfolio Committee that it had approved its amendments to the Bill. The Bill has also been approved by the National Council of 
Provinces and is currently awaiting signature by President Zuma.  
 
Whilst several concessions in respect of the Bill were made by the DMR during a bilateral consultation process headed by the 
Chamber of Mines, the extent to which Ministerial discretion is permitted remains a challenge. The discretion granted to the 
Minister to declare a mineral as strategic is likely to have the biggest impact on Lonmin and other mining companies, given that the 
Minister may declare PGM’s as strategic in which event the Minister is empowered to determine what volumes of such minerals 
are to be available to be sold locally. The lack of clarity on pricing and rates information to be used remains a concern. However this 
would not be a concern if free market pricing was to be allowed. 
 
With the general downturn of investment in greenfield mining projects, South Africa’s need for a sound mining legislative 
framework has been greatly increased. The current MPRDA Amendment Bill is far from perfect, but does provides a platform for a 
regulatory framework and a policy direction for the future of mining in South Africa. The Regulations to the Bill have not yet been 
drafted so implementation of the Act’s provisions is likely to be delayed until the Regulations are completed.  
 
Labour Relations Act 
Progress has been slow as regards finalising the labour relations legislative framework. Whilst the Employment Tax Incentive Act 
(otherwise known as the Youth Subsidy Act) became law on 1 January 2014 and provides tax incentives to employers who employ 
qualifying persons between the ages of 18 and 29, amendments to the Labour Relations Act and the Basic Conditions of 
Employment Act continue to be debated before submission to Cabinet for final approval. Contentious issues include whether there 
should be circumstances in which a strike can be suspended and who can take part in picketing activities. It appears that the 
amended legislation will not contain provisions banning labour brokers or providing for a ballot process prior to the 
implementation of a strike. Once the amended versions of the various pieces of legislation have been submitted to and approved 
by Cabinet, the President will be entitled to sign the amended legislation into law and it will become effective on a date stipulated 
in the Amendment Acts. 
 
12. Farlam Commission  
 
The Farlam Commission of Inquiry into the Events at Marikana in August 2012 is still in progress. ‘Phase 1’ is continuing and is 
looking at evidence relating to the events, on and leading up to, 16 August 2012. The Commission has now concurrently embarked 
on ‘Phase 2’ of its inquiry, which will look at the underlying socioeconomic conditions that may have contributed to the events. This 
has taken the form of a series of public seminars to enable the Commission to obtain information and advice from a wide range of 
experts on identified topics (such as migrant labour and collective bargaining) and open these matters up for public debate. While 
the inquiry was due to conclude at the end of April 2014, it has been granted a final extension to 31 July 2014 by President Zuma. 
The Commission is still investigating the role of the South African Police Services’ leadership and is yet to call Lonmin to the stand. 
 
Lonmin continues to fully support the inquiry and is cooperating fully with the Commission’s investigations. 
                                       

13. Outlook 
 
The protracted wage strike which has been the main feature of the first half of the year, has significantly impacted the Company’s 
profitability. Our ability to achieve a sustained steady state production is predicated on when operations resume. We expect unit 
costs to exceed wage inflation and capital spend to be less than the previously guided $210 million. We will update the market on 
the production, associated unit costs and capital spend outlook once the strike has ended.  
 
14. Management and Board Update 
 
On 7 November 2013, we announced that the Chairman, Roger Phillimore, had indicated his intention to retire from office during 
2014.  As a result, Roger Phillimore retired as Chairman and as a Director of the Company at the close of business on 30 April 2014.  
 
Brian Beamish, an independent Non-executive Director who joined the Board on 1 November 2013, became Interim Chairman with 
effect from 1 May 2014.  
 
We are grateful for Roger’s commitment and wise contributions to the Company over the last seventeen years. He joined the Board 
in 1997, became Deputy Chairman in 2002 and then took over the mantle of Chairman in 2009. During his five years as our 
Chairman he has led the Board through some of the most challenging years in the Company’s long history. We welcome Brian who 
brings a wealth of experience, knowledge and skills to our boardroom, and in particular has a deep insight into the needs of 21st 
century South Africa which we value greatly.   
 
15. Employee Contribution 
 
I would like to express my gratitude to the Lonmin Board, employees and management, our contractors, the GLC and all 
stakeholders who have shown incredible amount of resilience and support during what has been a challenging first half of the year. 
I hope that AMCU and its members make the right choice to return to work so as to ensure a sustainable Lonmin for their and our 
benefits and should avoid the prolonged suffering of our employees, partners and the GLC. 
 
Ben Magara 
Chief Executive Officer  
9 May 2014 
                                        

Financial Review 
 
Overview 
 
The impact of the protected strike action in the South African platinum sector which commenced on 23 January 2014 is a dominant 
feature of our financial performance during the six months ended 31 March 2014. Key in this impact has been the reduction in the 
volume of Platinum Group Metals (PGMs) produced and sold while fixed production costs continued to be incurred during the 
strike period which has had an adverse effect on the Group’s profitability. 
 
The depressed PGM pricing environment experienced in the first quarter of the financial year continued in the second quarter 
despite supply side concerns due to strike action. As a result revenue was severely impacted by reduced production and subdued 
metal prices. 
 
On the cost side we have separately accounted for fixed production overheads incurred during the protected strike for which there 
was no associated production output as well as additional costs arising directly as a result of the strike action. These have been 
disclosed as special costs to assist in understanding the financial performance achieved by the Group on a comparable basis with 
prior periods. As a result our underlying performance excludes the impact of the strike action. Other than the impact of the strike, 
movements in underlying costs were driven primarily by the release of stock locked up at end of the previous financial year end and 
utility and overhead escalations, somewhat mitigated by favourable exchange movements. The cost of production per PGM ounce 
for the 2014 period, including the adverse impact of the strike action, was R13,058 compared to R8,960 for  the 2013 
corresponding period. The loan to Shanduka, our HDSA partner, was impaired by $160 million during the period. The security for 
the loan is the value of Shanduka’s shareholding in Incwala. This valuation has fallen driven by a downward revision in PGM price 
assumptions. At 31 March the balance of the receivable stood at $260 million. 
 
Despite a decrease in capital expenditure during the period, the declining profitability on the back of the strike action impacted the 
Group’s ability to generate cash. However, the balance sheet strength attained during the 2013 financial year when we undertook a 
rights issue and settled our debt has allowed the Group to absorb the operational disruption caused by the strike to date and still 
end the period in a net cash position of $71 million. We continue to put in place measures to conserve cash and protect our 
balance sheet position in order to support a successful ramp up on return to production. However uncertainty remains around the 
strike resolution date which may have a bearing on the going concern assumption as detailed in the basis of preparation section of 
the interim financial statements. 
 
Income Statement 
 
The $59 million movement between the underlying operating profit of $34 million for the six months ended 31 March 2014 and 
that of $93 million for the six months ended 31 March 2013 is analysed below.  

 
                                                                    $m
Period to 31 March 2013 reported operating profit                   90
Period to 31 March 2013 special items                                3
Period to 31 March 2013 underlying operating profit                 93
 
PGM price                                                         (71)
PGM volume                                                        (46) 
PGM mix                                                           (27) 
Base metals                                                       (13) 
Revenue changes                                                  (157)
Cost changes (net of positive foreign exchange impact of $135m)     98
 
Period to 31 March 2014 underlying operating profit                 34 
Period to 31 March 2014 special items                            (165)
Period to 31 March 2014 reported operating loss                  (131)
 
Revenue 
 
Total revenue for the six months ended 31 March 2014 decreased by $157 million from the six months ended 31 March 2013 to 
$578 million. 
 
As noted in the overview the PGM pricing environment deteriorated over the prior period and the impact on the average prices 
achieved on the key metals sold is shown below: 

 
    Six months    Six months 

                                                ended       ended 
                                             31.03.14    31.03.13 
                                                 $/oz        $/oz 
Platinum                                        1,400       1,598 
Palladium                                         735         713 
Rhodium                                         1,003       1,196 
PGM basket (excluding by-product revenue)         999       1,178 
PGM basket (including by-product revenue)       1,056       1,252 

 
The US Dollar PGM basket price (excluding by-products) decreased by 15% resulting in a $71 million reduction in revenue. It should 
be noted that whilst the US Dollar basket price has decreased by 15% over the 2013 comparable period, in Rand terms the basket 
price (excluding by-products) remained flat compared to 2013 propped up by the significantly weaker Rand.  
 
PGM sales volume for the six months to 31 March 2014 was 7% down on the six months to 31 March 2013. The impact of the strike 
was partially diluted by the release of inventory locked up at the end of the 2013 financial year as a result of the smelter incident. 
The reduction in PGM volumes contributed $46 million to the overall decrease in revenue. The mix of metals sold resulted in a 
negative impact of $27 million mainly due to a higher proportion of Palladium, Rhodium and Ruthenium due to metal-in-process 
inventory timing differences. Base metal revenue was down $13 million on the back of lower volumes sold and softer metal prices.  
 
Operating Costs 
 
Total underlying costs (excluding the impact of the strike disruption) in US Dollar terms decreased by $98 million mainly due to the 
impact of decreased production as a result of the strike and positive foreign exchange movements partially offset by the impact of 
metal stock movements and cost escalations. A track of these changes is shown in the table below. 

 
                                                                   $m
Six months ended 31 March 2013 – underlying costs                 642
 
Increase / (decrease): 
 
Marikana underground mining                                       (62)
Marikana opencast mining                                          (14) 
Limpopo mining                                                     (2) 
Concentrating and processing                                       (1) 
Overheads                                                            8 
Idle fixed production overheads excluded from underlying costs   (157)
Operating costs                                                  (228)
Pandora and W1 ore purchases                                      (11)
Metal stock movement                                               285 
Foreign exchange                                                 (135) 
Depreciation and amortisation                                      (9) 
Cost changes (net of positive foreign exchange impact)            (98)
Six months ended 31 March 2014 – underlying costs                  544

 
Marikana underground mining costs decreased in the period by $62 million or 14%, as wage and utility escalations were more than 
offset by the impact of reduced production and withholding of wages as a result of the strike action. Marikana opencast mining 
costs decreased by $14 million or 48% due to similar reasons. 
 
Concentrator and processing costs remained flat compared to the prior year period, as the impact of reduced production as a result 
of the strike was offset by cost escalations and an increase in maintenance during plant idle time.  
 
Overheads increased by $8 million or 9% largely due to cost escalation effects.  
 
Ore purchases decreased by $11 million or 36% as volumes of ore produced were impacted by the strike action. 

The six months under review saw a release of stock in process locked up following last year’s smelter incident as well as a general 
reduction in inventory as a result of lower production. This has resulted in a $285 million negative impact on operating profit, 
excluding exchange impacts, arising from metal stock movements. The $285 million comprises of a $157 million stock decrease in 
2014 and a $128 million increase in stock in 2013. 
 
The Rand weakened considerably against the US Dollar during the period under review averaging ZAR10.46 to USD1 compared to 
an average of ZAR8.79 to USD1 in the 2013 period resulting in a $135 million positive impact on operating costs. 
 
Depreciation and amortisation decreased by $9 million over the 2013 period reflecting the decrease in production during the 
period. Depreciation is calculated on a units of production basis, spreading costs in relation to proved and probable reserves.  
 
Cost of Production per PGM Ounce 
 
The cost of production per PGM ounce for the six months to 31 March 2014 was R13,058 compared to R8,960 for the six months to 
31 March 2013, an increase of 45.7%. Cost escalations during the period were exacerbated by significant production disruptions 
due to increased Section 54 and management induced safety stoppages in the first quarter of the year and the protected strike 
action over the major portion of the second quarter. It should be noted that the cost of production per PGM ounce is based on all 
production costs including idle fixed production overheads which have been excluded from our underlying results as discussed 
below. If these strike related costs are excluded the unit cost per PGM ounce produced for the 2014 reporting period would have 
actually reduced by 2.5% compared to the 2013 reporting period. 
 
Further details of unit costs can be found in the Operating Statistics. 
 
Special Operating Costs 
 
Special operating costs for the six months ended 31 March 2014 are made up as follows: 

 
                                                        $m
 
Strike related costs                                   164
                  -     Idle fixed production costs    157
                  -     Contract costs                   3
                  -     Security costs                   4 
Other                                                    1
 
                                                       165

 
As highlighted earlier, fixed production overheads incurred during the strike period for which there was no associated production 
output and costs arising directly as a result of the strike action have been classified as special items. The total of these strike related 
costs amounted to $164 million. Idle fixed production costs incurred during the strike period amounted to $157 million. Costs 
relating to contractors not being able to fulfil their obligations amounted to $3 million while the costs of additional security totalled 
$4 million.  
 
For the six months ended 31 March 2013, special costs totalled $3 million and related to residual costs arising from the strike action 
of 2012 ($2 million) and restructuring costs ($1 million). 

Net Finance Costs 
 
                                                     6 months to 31 March 
                                                    2014              2013 
                                                      $m                $m 
Net bank interest and fees                           (8)              (14) 
Capitalised interest payable and fees                  4                 9 
Exchange                                               2                 8 
Other                                                (4)              (10) 
Underlying net finance costs                         (6)               (7) 
HDSA receivable                                    (139)              (15) 
Exchange loss in respect of Rights Issue               -              (10) 
Net effects of unwinding the interest rate swap        -               (7) 
Net finance costs                                  (145)              (39) 

The total net finance costs of $145 million for the six months ended 31 March 2014 represent a $106 million movement compared 
to total net finance costs of $39 million for the six months ended 31 March 2013.  

Net bank interest and fees decreased from $14 million to $8 million for the six months ended 31 March 2014 largely as a result of 
the non-recurring unwinding of previously unamortised bank fees on settlement of old loan facilities in 2013 and a reduction in 
average drawn facilities during the period under review. Interest totalling $4 million was capitalised to assets (2013 - $9 million). 
 
The Historically Disadvantaged South Africans (HDSA) receivable, being the Sterling loan to Shanduka Resources (Proprietary) 
Limited (Shanduka), decreased by $139 million during the period to 31 March 2014 as positive exchange movements of $12 million 
and accrued interest of $9 million were more than offset by an impairment charge of $160 million. The impairment charge arose as 
the value of the security for the loan (being the value of Shanduka’s shareholding in Incwala calculated based on discounted cash 
flows of Incwala’s underlying investments in WPL, EPL and Akanani) had fallen below the carrying amount of the receivable largely 
driven by a downward revision in PGM price assumptions applied in the valuation models.  This compares to adverse exchange 
movements of $23 million and accrued interest of $8 million in the period to 31 March 2013. At 31 March 2014 the balance of the 
receivable stood at $260 million (2013 - $366 million).  
 
The financial effects of forward exchange contracts in synchronisation with the Rights Issue process and unwinding of the interest 
rate swap in 2013 did not recur in 2014. 
 
Taxation 
 
Reported tax for the current six month period was a credit of $67 million compared to a credit of $34 million in the 2013 period. 
The underlying tax charge of $2 million in the 2014 period becomes a $67 million tax credit after taking into account exchange gains 
on the retranslation of Rand denominated deferred tax liabilities ($23 million) and the tax impact of special items ($46 million). 
These gains are treated as special items. In the prior year comparative period exchange gains had an effect of $47 million on the tax 
credit.  
 
Cash Generation and Net Cash 
 
The following table summarises the main components of the cash flow during the period: 

 
                                              Six months ended 31 March 

                                              2014                 2013
                                                $m                   $m
Operating (loss)/profit                      (131)                   90
Depreciation, amortisation and impairment       69                   78
Changes in working capital                    (10)                (226)
Other                                            8                  (2)
Cash flow utilised in operations              (64)                 (60)
Interest and finance costs                     (8)                 (23)
Tax received/(paid)                              1                  (2)
Trading cash outflow                          (71)                 (85)
Capital expenditure                           (46)                 (73)
Distribution from joint venture                  -                    2
Dividends paid to minority shareholders       (16)                    -
Free cash outflow                            (133)                (156)
Net proceeds from equity issuance                -                  767
Cash (outflow)/inflow                        (133)                  611
Opening net cash/(debt)                        201                (421)
Foreign exchange                                 3                   10
Unamortised fees                                 -                  (6)
Closing net cash                                71                  194
 
Trading cash outflow (cents per share)     (12.5)c              (17.2)c 
Free cash outflow (cents per share)        (23.4)c              (31.9)c 

 
Cash flow utilised in operations in the six months ended 31 March 2014 at $64 million reflects a $4 million increase from the same 
period in 2013. For the six months ended 31 March 2014, the cash outflow is largely driven by the operating loss as a result of the 
strike action partially offset by improved working capital movements on the back of a release of stock. In 2013 the cash outflow 
was largely as a result of working capital movements, a significant portion of which was attributed to the replenishment of the 
metal in process pipeline following the production stoppage of 2012.                                       

Trading cash outflow for the six months to 31 March 2014 amounted to $71 million (2013 – $85 million). The cash flow on interest 
and finance costs decreased by $15 million largely as a result of non-recurring amendment fees for the revised facilities and the 
costs of unwinding the interest rate swap in 2013. The trading cash outflow per share was 12.5 cents for the six months ended 31 
March 2014 (2013 – 17.2 cents). 
 
Capital expenditure cash flow at $46 million was $27 million below the prior period as our capital investment programme was 
impacted by the strike. Capital expenditure in the first six months was mainly on stay in business capital across the various shafts 
and processing facilities, development of ore reserves at K3, Rowland and Saffy shafts as well as critical ore pass rehabilitation work 
on K4. The hostel conversion programme continued as it is an important part of improving the living conditions of our employees. 
The feasibility study on the bulk tailings retreatment initiative was also completed. 
 
Dividends paid to minority shareholders in the year of $16 million reflect the minimum payments required to enable Incwala to 
service its loan facilities. 
 
The Group undertook a successful Rights Issue which was completed in December 2012 and raised total net proceeds of $767 
million after costs and foreign exchange charges. The proceeds of the Rights Issue were utilised to settle debt resulting in a net cash 
position at 31 March 2013 of $194 million. This position of balance sheet strength has allowed the Group to absorb the operational 
disruption caused by strike to date. However, the impact of the strike action on the business has resulted in the net cash position 
receding to $71 million at 31 March 2014. 
 
Principal Risks and Uncertainties 
 
The Group faces many risks in the operation of its business. The Group’s strategy takes into account known risks, but risks will exist 
of which we are currently unaware. The principal risks and uncertainties highlighted in our 2013 annual report have largely 
remained unchanged except for the elevation of the risk associated with employee relations given the ongoing strike action and the 
resulting liquidity concerns as detailed below. 
 
Financial Risk Management 
 
The main financial risks faced by the Group relate to the availability of funds to meet business needs (liquidity risk), the risk of 
default by counterparties to financial transactions (credit risk) and fluctuations in interest, foreign exchange rates and commodity 
prices (market risk). Factors which are outside the control of management which can have a significant impact on the business 
remain, specifically, volatility in the Rand / US Dollar exchange rate, PGM commodity prices and in recent times, production 
disruptions as a result of labour action. 
 
These are the critical factors to consider when addressing the issue of whether the Group is a Going Concern.  
 
Liquidity Risk 
 
The policy on liquidity is to ensure that the Group has sufficient funds to facilitate all ongoing operations. The Group funds its 
operations through a mixture of equity funding and borrowings. The Group’s philosophy is to maintain an appropriately low level of 
financial gearing given the exposure of the business to fluctuations in PGM commodity prices and the Rand / US Dollar exchange 
rate. We ordinarily seek to fund capital requirements from equity. 
 
As part of the annual budgeting and long-term planning process, the Group's cash flow forecast is reviewed and approved by the 
Board. The cash flow forecast is amended for any material changes identified during the year, for example material acquisitions and 
disposals or changes in production forecasts.  Where funding requirements are identified from the cash flow forecast, appropriate 
measures are taken to ensure these requirements can be satisfied. Factors taken into consideration are: 
 
     - the size and nature of the requirement; 
     - preferred sources of finance applying key criteria of cost, commitment, availability, security / covenant conditions; 
     - recommended counterparties, fees and market conditions; and 
     - covenants, guarantees and other financial commitments. 
      
The Group’s current debt facilities are summarised as follows: 
 
     - Revolving Credit Facility of $400 million at a Lonmin Plc level; and 
     - Three bilateral facilities of R660 million each at a Western Platinum Limited (WPL) level.                                        

The following financial covenants apply to these facilities: 
 
    - consolidated tangible net worth will not be less than $2,250 million; 
    - consolidated net debt will not exceed 25 per cent of consolidated tangible net worth; and 
    - if: 
              - in respect of the amended US Dollar Facilities Agreement, the aggregate amount of outstanding loans exceeds 
                $75 million at any time during the last six months of any test period; or 
              - in respect of both the amended US Dollar Facilities Agreement and the amended Rand Facilities Agreements, 
                consolidated net debt exceeds $300 million as of the last day of any test period, 
 
         the capital expenditure of the Group must not exceed the limits set out in the table below, provided that, if 110 per cent 
         of budgeted capital expenditure for any test period ending on or after 30 September 2013 is lower than the capital 
         expenditure limit set out in the table below for that test period, then the capital expenditure limit for that test period shall 
         be equal to 110 per cent of such budgeted capital expenditure. 

 
         Test Period                                       Capital expenditure limit (ZAR) 
 
1 October 2012 to 31 March 2013 (inclusive)                          800,000,000 
1 October 2012 to 30 September 2013 (inclusive)                    1,600,000,000 
1 April 2013 to 31 March 2014 (inclusive)                          1,800,000,000 
1 October 2013 to 30 September 2014 (inclusive)                    2,000,000,000 
1 April 2014 to 31 March 2015 (inclusive)                          3,000,000,000 
1 October 2014 to 30 September 2015 (inclusive)                    4,000,000,000 
1 April 2015 to 31 March 2016 (inclusive)                          4,000,000,000 
1 October 2015 to 30 September 2016 (inclusive)                    4,000,000,000 

While the capital structure referred to above has allowed the business to absorb the impact of the current strike action to date, the
impact on the balance sheet has been a reduction in net cash resources as highlighted above. The non-resolution of the strike will 
impact the availability of funds to meet business needs and the going concern assumption as discussed in detail in the basis of 
preparation section of the interim financial statements. It is envisaged that the working capital requirements of the business to 
ramp up production following the resolution of the strike as well as its ongoing sustaining capital requirements may result in the 
business operating in a net debt position for the foreseeable future. This may necessitate steps such as a review of the Group’s 
capital structure or a reduction in capital expenditure in future. 
 
Credit Risk 
 
Banking Counterparties 
 
Banking counterparty credit risk is managed by spreading financial transactions across an approved list of counterparties of high 
credit quality. Banking counterparties are approved by the Board and consist of the ten banks that participate in Lonmin’s bank 
debt facilities. These counter-parties comprise: BNP Paribas S.A., Citigroup Global Markets Limited, FirstRand Bank Limited, HSBC 
Bank Plc, Investec Bank Limited, J.P. Morgan Limited, Lloyds TSB Bank Plc, The Royal Bank of Scotland N.V., The Standard Bank of 
South Africa Limited and Standard Chartered Bank. 
 
Trade Receivables 
 
The Group is exposed to significant trade receivable credit risk through the sale of PGMs to a limited group of customers. 
 
This risk is managed as follows: 
 
- aged analysis is performed on trade receivable balances and reviewed on a monthly basis; 
- credit ratings are obtained on any new customers and the credit ratings of existing customers are monitored on an ongoing 
  basis; 
- credit limits are set for customers; and 
- trigger points and escalation procedures are clearly defined. 
 
It should be noted that a significant portion of Lonmin’s revenue is from two key customers. However, both of these customers 
have strong investment grade ratings and their payment terms are very short, thereby reducing trade receivable credit risk 
significantly.                                     

HDSA Receivables 
 
HDSA receivables are secured on the HDSA’s shareholding in Incwala Resources (Pty) Limited. Refer to note 8 in the financial 
statements for details on the valuation of this security and the resulting impairment charge. 
 
Interest Rate Risk 
 
Currently amounts on deposit as well as our outstanding borrowings are in both US Dollars and South African Rand and at floating 
rates of interest. Given current market rates, this position is not considered to be high risk at this point in time. This position is kept 
under constant review in conjunction with the liquidity policy outlined above and future funding requirements of the business.  
 
Foreign Currency Risk 
 
The Group’s operations are predominantly based in South Africa and the majority of the revenue stream is in US Dollars.  However, 
the bulk of the Group’s operating costs and taxes are paid in Rand. Most of the cash received in South Africa is in US Dollars. Most 
of the Group’s funding sources are in US Dollars. 
 
The Group’s reporting currency is the US Dollar and the share capital of the Company is based in US Dollars. 
 
During the period under review Lonmin did not undertake any foreign currency hedging.  
 
Commodity Price Risk 
 
Our policy is not to hedge commodity price exposure on PGMs, excluding gold, and therefore any change in prices will have a direct 
effect on the Group’s trading results.   
 
For base metals and gold, hedging is undertaken where the Board determines that it is in the Group’s interest to hedge a 
proportion of future cash flows.  The policy allows Lonmin to hedge up to a maximum of 75% of the future cash flows from the sale 
of these products looking forward over the next 12 to 24 months. The Group did not undertake any hedging of base metals under 
this authority in the period under review and no forward contracts were in place in respect of base metals at the end of the period. 
 
In respect of gold, Lonmin entered into a prepaid sale of 75% of its current gold production for the next 54 months in March 2012. 
In terms of this contract Lonmin will deliver 70,700 ounces of gold over the period with delivery on a quarterly basis and in return 
received an upfront payment of $107 million. The upfront receipt was accounted for as deferred revenue on our balance sheet and 
is being released to profit and loss as deliveries take place at an average price of $1,510/oz delivered. 
 
Contingent Liabilities 
 
The Group provided third party guarantees to Eskom as security to cover estimated electricity consumption for three months. At 31 
March 2014 these guarantees amounted to $10 million (2013 - $10 million). 
 
Simon Scott 
Chief Financial Officer 

Operating Statistics for the 6 months to 31 March 2014

                                                                                6 months to   6 months to
                                                                                   31 March      31 March
                                                                         Units         2014          2013
Tonnes mined      Marikana                   K3 shaft                     kt            771         1,521
                                             K4 shaft                     kt              -             4
                                             1B/4B shaft                  kt            480           898
                                             Karee                        kt          1,251         2,423
                                             Rowland shaft                kt            553           867
                                             Newman shaft                 kt            239           476
                                             Hossy shaft                  kt            295           491
                                             W1 shaft                     kt             54            73
                                             Westerns                     kt          1,140         1,907
                                             Saffy shaft                  kt            387           526
                                             East 1 shaft                 kt             57           199
                                             East 2 shaft                 kt            135           182
                                             East 3 shaft                 kt             12            46
                                             Easterns                     kt            591           953
                                             Underground                  kt          2,982         5,284
                                             Opencast                     kt            155           288
                                             Total                        kt          3,136         5,571
                  Pandora (100%)(1)          Underground                  kt            156           263
                  Limpopo (2)                Underground                  kt              9             -
                  Lonmin (100%)              Total tonnes mined (100%)    kt          3,301         5,834
                                             % tonnes mined from UG2
                                             reef (100%)                  %           74.4%         73.3%
                  Lonmin (attributable)      Underground & Opencast       kt          3,211         5,683
Ounces Mined (3)  Lonmin excluding Pandora   Pt ounces                    oz        198,884       350,493
                  Pandora (100%)             Pt ounces                    oz         11,372        18,865
                  Limpopo                    Pt ounces                    oz            359             -
                  Lonmin                     Pt ounces                    oz        210,616       369,358

                  Lonmin excluding Pandora   PGM ounces                   oz        380,556       650,883
                  Pandora (100%)             PGM ounces                   oz         22,366        35,936
                  Limpopo                    PGM ounces                   oz            804             -
                  Lonmin                     PGM ounces                   oz        403,726       686,819
Tonnes milled (4) Marikana                   Underground                  kt          2,982         5,238
                                             Opencast                     kt            208           213
                                             Total                        kt          3,190         5,450
                  Pandora (5)                Underground                  kt            151           266
                  Limpopo (6)                Underground                  kt             27             -
                  Lonmin Platinum            Underground                  kt          3,161         5,503
                                             Opencast                     kt            208           213
                                             Total                        kt          3,368         5,716
Milled head       Lonmin Platinum            Underground                  g/t          4.60          4.63
grade (7)                                    Opencast                     g/t          3.09          2.93
                                             Total                        g/t          4.50          4.56
Concentrator      Lonmin Platinum            Underground                  %            87.9          86.8
recovery rate (8)                            Opencast                     %            84.3          85.4
                                             Total                        %            87.7          86.8

                                                             6 months to  6 months to
                                                                31 March     31 March
                                                      Units         2014         2013
Metals in       Marikana                 Platinum      oz        201,366      345,083
concentrate (9)                          Palladium     oz         93,436      156,088
                                         Gold          oz          4,894        8,820
                                         Rhodium       oz         29,035       45,508
                                         Ruthenium     oz         47,033       70,132
                                         Iridium       oz          9,671       16,124
                                         Total PGMs    oz        385,434      641,754
                Limpopo                  Platinum      oz          1,121            -
                                         Palladium     oz            974            -
                                         Gold          oz             93            -
                                         Rhodium       oz            114            -
                                         Ruthenium     oz            161            -
                                         Iridium       oz             44            -
                                         Total PGMs    oz          2,508            -
                Pandora                  Platinum      oz         10,988       19,095
                                         Palladium     oz          5,203        8,756
                                         Gold          oz             74          143
                                         Rhodium       oz          1,867        2,992
                                         Ruthenium     oz          2,974        4,537
                                         Iridium       oz            488          837
                                         Total PGMs    oz         21,595       36,360
                Lonmin Platinum before   Platinum      oz        213,475      364,178
                concentrate purchases    Palladium     oz         99,613      164,844
                                         Gold          oz          5,060        8,962
                                         Rhodium       oz         31,016       48,500
                                         Ruthenium     oz         50,168       74,669
                                         Iridium       oz         10,203       16,960
                                         Total PGMs    oz        409,536      678,115
                Concentrate purchases    Platinum      oz          1,642        1,880
                                         Palladium     oz            482          548
                                         Gold          oz              9            5
                                         Rhodium       oz            198          185
                                         Ruthenium     oz            212          197
                                         Iridium       oz             91           79
                                         Total PGMs    oz          2,634        2,896
                Lonmin Platinum          Platinum      oz        215,117      366,059
                                         Palladium     oz        100,095      165,392
                                         Gold          oz          5,069        8,968
                                         Rhodium       oz         31,214       48,686
                                         Ruthenium     oz         50,380       74,866
                                         Iridium       oz         10,295       17,039
                                         Total PGMs    oz        412,170      681,010
                                         Nickel (10)   oz          1,087        1,789
                                         Copper (10)   oz            699        1,147

                                                                                    6 months to  6 months to
                                                                                       31 March     31 March
                                                                             Units         2014         2013
Refined          Lonmin refined metal production   Platinum                  oz         256,665      324,720
production                                         Palladium                 oz         128,283      145,964
                                                   Gold                      oz           6,360        9,049
                                                   Rhodium                   oz          62,953       35,746
                                                   Ruthenium                 oz          61,986       82,187
                                                   Iridium                   oz          18,817       12,853
                                                   Total PGMs                oz         535,065      610,519
                 Toll refined metal production     Platinum                  oz             551        1,364
                                                   Palladium                 oz           1,010          312
                                                   Gold                      oz              73          271
                                                   Rhodium                   oz             896        1,717
                                                   Ruthenium                 oz           4,482        5,185
                                                   Iridium                   oz           1,102          913
                                                   Total PGMs                oz           8,114        9,762
                 Total refined PGMs                Platinum                  oz         257,217      326,084
                                                   Palladium                 oz         129,293      146,276
                                                   Gold                      oz           6,433        9,321
                                                   Rhodium                   oz          63,848       37,463
                                                   Ruthenium                 oz          66,469       87,372
                                                   Iridium                   oz          19,919       13,766
                                                   Total PGMs                oz         543,179      620,282
                 Base metals                       Nickel (11)               MT           1,312        1,650
                                                   Copper (11)               MT             764        1,030
Sales            Lonmin Platinum                   Platinum                  oz         263,675      326,142
                                                   Palladium                 oz         136,573      140,775
                                                   Gold                      oz           6,500        8,337
                                                   Rhodium                   oz          53,993       33,469
                                                   Ruthenium                 oz          66,830       66,417
                                                   Iridium                   oz          19,843       11,614
                                                   Total PGMs                oz         547,413      586,753
                                                   Nickel (11)               MT           1,338        1,687
                                                   Copper (11)               MT             804        1,024
                                                   Chrome (11)               MT         505,101      651,010
Average prices                                     Platinum                  $/oz         1,400        1,598
                                                   Palladium                 $/oz           735          713
                                                   Gold                      $/oz         1,510        1,529
                                                   Rhodium                   $/oz         1,003        1,196
                                                   Ruthenium                 $/oz            54           76
                                                   Iridium                   $/oz           490        1,005
                                                   Basket price of PGMs (12) $/oz           999        1,178
                                                   Basket price of PGMs (13) $/oz         1,056        1,252
                                                                        
                                                   Basket price of PGMs (12) R/oz        10,457       10,410
                                                   Basket price of PGMs (13) R/oz        11,049       11,056
                                                   Nickel (11)               $/MT        11,572       14,184
                                                   Copper (11)               $/MT         6,890        7,472
                                                   Chrome (11)               $/MT            19           18

Footnotes:
(1)  Pandora underground tonnes mined represents 100% of the total tonnes mined on the Pandora joint venture of which 42.5% is attributable to Lonmin.
(2)  Limpopo underground tonnes mined represents low grade development tonnes mined whilst on care and maintenance.
(3)  Ounces mined have been calculated at achieved concentrator recoveries and as from 2014 with Lonmin standard downstream processing recoveries to present produced
     saleable ounces.
(4)  Tonnes milled excludes slag milling.
(5)  Lonmin purchases 100% of the ore produced by the Pandora joint venture for onward processing which is included in downstream operating statistics.
(6)  Limpopo tonnes milled represents low grade development tonnes milled.
(7)  Head grade is the grammes per tonne (5PGE + Au) value contained in the tonnes milled and fed into the concentrator from the mines (excludes slag milled).
(8)  Recovery rate in the concentrators is the total content produced divided by the total content milled (excluding slag).
(9)  Metals in concentrate include metal derived from slag processing and as from 2014 have been calculated at Lonmin standard downstream processing recoveries to present
     produced saleable ounces.
(10) Corresponds to contained base metals in concentrate.
(11) Nickel is produced and sold as nickel sulphate crystals or solution and the volumes shown correspond to contained metal. Copper is produced as refined product but
     typically at LME grade C. Chrome is produced in the form of chromite concentrate and volumes shown are in the form of chromite.
(12) Basket price of PGMs is based on the revenue generated in Rand and Dollar from the actual PGMs (5PGE + Au) sold in the period based on the appropriate Rand / Dollar
     exchange rate applicable for each sales transaction.
(13) As per note 10 but including revenue from base metals.

                                                                                           6 months to    6 months to
                                                                                              31 March       31 March
                                                                                   Units          2014           2013
Capital expenditure(1)                                                             Rm              491            656
                                                                                   $m               46             73
Exchange rates     Average rate for period (2)                                     R/$           10.46           8.79
                   Closing rate                                                    R/$           10.54           9.22
Underlying cost    PGM operations              Mining                              $m            (334)          (467)
of sales           segment                     Concentrating                       $m             (61)           (75)
                                               Smelting and refining (3)           $m             (60)           (68)
                                               Shared services                     $m             (36)           (39)
                                               Management and marketing services   $m             (14)           (13)
                                               Ore and concentrate purchases       $m             (17)           (31)
                                               Limpopo mining                      $m              (2)            (4)
                                               Special item adjustment             $m              157              -
                                               Royalties                           $m              (3)            (4)
                                               Share based payments                $m             (13)           (11)
                                               Inventory movement                  $m            (105)            129
                                               FX and Group charges                $m               15             28
                   Total PGM Operations                                                          (473)          (555)
                                               Evaluation – excluding FX                             -              -
                                               Exploration – excluding FX                          (2)            (1)
                                               Corporate – excluding FX                              -            (6)
                                               FX                                                    -            (2)
                   Total underlying costs of sales                                 $m            (475)          (564)

                   PGM operations              Mining                              Rm          (3,462)        (4,136)
                   segment                     Concentrating                       Rm            (626)          (656)
                                                                     
                                               Smelting and refining (3)           Rm            (619)          (599)
                                               Shared services                     Rm            (381)          (346)
                                               Management and marketing services   Rm            (144)          (112)
                                               Ore and concentrate purchases       Rm            (181)          (278)
                                               Limpopo mining                      Rm             (17)           (32)
                                               Special item adjustment             Rm           1,726               -
                                               Royalties                           Rm             (31)           (33)
                                               Share based payments                Rm            (134)          (100)
                                               Inventory movement                  Rm            (923)          1,286
                                               FX and Group charges                Rm            (481)          (693)
                                                                                   Rm          (5,272)        (5,699)

                                                                                         6 months to  6 months to
                                                                                            31 March     31 March
                                                                                 Units          2014         2013
Cost of production   Cost                    Mining                              Rm          (3,462)      (4,136)
(PGM operations                              Concentrating                       Rm            (626)        (656)
                                                                   
segment)                                     Smelting and refining (3)           Rm            (619)        (599)
                                             Shared services                     Rm            (381)        (346)
                                             Management and marketing services   Rm            (144)        (112)
                                                                                 Rm          (5,233)      (5,849)
                                             Mined ounces excluding ore
                     PGM saleable ounces
                                             purchases                           oz          380,556      650,883
                                             Metals in concentrate before
                                             concentrate purchases               oz          407,029      678,115
                                             Refined ounces                      oz          543,179      620,282
                                             Metals in concentrate including
                                             concentrate purchases               oz          409,663      681,010

                     Cost of production      Mining                              R/oz        (9,097)      (6,355)
                                             Concentrating                       R/oz        (1,538)        (968)
                                             Smelting and refining (3)           R/oz        (1,140)        (965)
                                             Shared services                     R/oz          (929)        (508)
                                             Management and marketing services   R/oz          (352)        (165)
                                                                                 R/oz       (13,058)      (8,960)

                     % increase in cost of   Mining                              %               43%          n/a
                     production              Concentrating                       %               59%          n/a
                                             Smelting and refining (3)           %               18%          n/a
                                             Shared services                     %               83%          n/a
                                             Management and marketing services   %              114%          n/a
                                                                                 %               46%          n/a

Footnotes:
(1)  Capital expenditure is the aggregate of the purchase of property, plant and equipment and intangible assets (includes capital accruals and excludes capitalised interest).
(2)  Exchange rates are calculated using the market average daily closing rate over the course of the period.
(3)  Comprises of smelting and refining costs as well as direct process operations shared costs.

Responsibility statement of the directors in respect of the interim financial report

We confirm that to the best of our knowledge:

-   the condensed set of financial statements has been prepared in accordance with IAS 34 Interim Financial Reporting
    as adopted by the EU, and

-   the interim management report includes a fair review of the information required by:

    (a) DTR4.2.7R of the Disclosure and Transparency Rules, being an indication of important events that have
        occurred during the first six months of the financial year and their impact on the condensed set of financial
        statements; and a description of the principal risks and uncertainties for the remaining six months of the year;
        and

    (b) DTR4.2.8R of the Disclosure and Transparency Rules, being related party transactions that have taken place in
        the first six months of the current financial year and that have materially affected the financial position or
        performance of the entity during that period; and any changes in the related party transactions described in the
        last annual report that could do so.

Brian Beamish                                                     Simon Scott
Chairman                                                          Chief Financial Officer

9 May 2014

INDEPENDENT REVIEW REPORT TO LONMIN PLC

Introduction

We have been engaged by the company to review the condensed set of financial statements in the half-yearly financial
report for the six months ended 31 March 2014 which comprises the consolidated income statement, consolidated
statement of comprehensive income, consolidated statement of financial position, consolidated statement of changes in
equity, consolidated statement of cash flows and the related explanatory notes. We have read the other information
contained in the half-yearly financial report and considered whether it contains any apparent misstatements or material
inconsistencies with the information in the condensed set of financial statements.

This report is made solely to the company in accordance with the terms of our engagement to assist the company in
meeting the requirements of the Disclosure and Transparency Rules ("the DTR") of the UK’s Financial Conduct Authority
("the UK FCA"). Our review has been undertaken so that we might state to the company those matters we are required
to state to it in this report and for no other purpose. To the fullest extent permitted by law, we do not accept or assume
responsibility to anyone other than the company for our review work, for this report, or for the conclusions we have
reached.

Directors’ responsibilities
The half-yearly financial report is the responsibility of, and has been approved by, the directors. The directors are
responsible for preparing the half-yearly financial report in accordance with the DTR of the UK FCA.

As disclosed in note 1, the annual financial statements of the group are prepared in accordance with IFRSs as adopted
by the EU. The condensed set of financial statements included in this half-yearly financial report has been prepared in
accordance with IAS 34 Interim Financial Reporting as adopted by the EU.

Our responsibility
Our responsibility is to express to the company a conclusion on the condensed set of financial statements in the half-
yearly financial report based on our review.

Scope of review
We conducted our review in accordance with International Standard on Review Engagements (UK and Ireland) 2410
Review of Interim Financial Information Performed by the Independent Auditor of the Entity issued by the Auditing
Practices Board for use in the UK. A review of interim financial information consists of making enquiries, primarily of
persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review
is substantially less in scope than an audit conducted in accordance with International Standards on Auditing (UK and
Ireland) and consequently does not enable us to obtain assurance that we would become aware of all significant matters
that might be identified in an audit. Accordingly, we do not express an audit opinion.

Conclusion
Based on our review, nothing has come to our attention that causes us to believe that the condensed set of financial
statements in the half-yearly financial report for the six months ended 31 March 2014 is not prepared, in all material
respects, in accordance with IAS 34 as adopted by the EU and the DTR of the UK FCA.

Emphasis of matter – Going concern
In forming our conclusion on the condensed set of financial statements, which is not modified, we have considered the
adequacy of the disclosures made in note 1 in the condensed set of financial statements concerning the Group’s ability
to continue as a going concern; in particular, the uncertainty over the end date of the strike which has been ongoing
since 23 January 2014, and the uncertainty as to the continued availability of sufficient, appropriate debt facilities,
including the ability of the Group to withstand down side scenarios affecting cash flows and covenants and the
successful implementation of any mitigating operational measures. These conditions, along with the other matters
explained in note 1 of the condensed set of financial statements, indicate the existence of a material uncertainty which
may cast significant doubt on the Group’s ability to continue as a going concern. The condensed set of financial
statements do not include the adjustments that would result if the Group were unable to continue as a going concern.

Robert Seale
for and on behalf of KPMG LLP
Chartered Accountants
15 Canada Square
London E14 5GL
9 May 2014

Consolidated income statement
for the 6 months to 31 March 2014

                                                                                                                                                              Year
                                                 6 months to               6 months to   6 months to               6 months to    Year ended                 ended
                                                    31 March    Special       31 March      31 March     Special      31 March        30 Sep     Special    30 Sep
                                                        2014      items           2014          2013      items           2013          2013       items      2013
                                                 Underlying    (note 3)          Total    Underlying    (note 3)         Total    Underlying    (note 3)     Total
                                        Note              $m         $m             $m            $m         $m             $m            $m         $m         $m
Revenue                                    2             578          -            578           735           -           735         1,520           -     1,520

                     
(LBITDA)/EBITDA (ii)                       2             103      (165)           (62)           171         (3)           168           321        (17)       304
Depreciation, amortisation and
impairment                                              (69)          -           (69)          (78)           -          (78)         (157)           -     (157)
                            
Operating (loss) / profit (iii)            2              34      (165)          (131)            93         (3)            90           164        (17)       147
Impairment of available for sale
financial assets                                           -          -              -             -           -             -             -         (2)       (2)
Finance income                             4               4         21             25             9          16            25             9          26        35
Finance expenses                           4            (10)      (160)          (170)          (16)        (48)          (64)          (19)        (25)      (44)
Share of (loss) / profit of equity
accounted investments                                    (2)          -            (2)             3           -             3             4           -         4
(Loss) / profit before taxation                           26      (304)          (278)            89        (35)            54           158        (18)       140
                    
Income tax credit (iv)                     5             (2)         69             67          (13)          47            34          (27)          85        58
(Loss) / profit for the period                            24      (235)          (211)            76          12            88           131          67       198
Attributable to:
- Equity shareholders of Lonmin Plc                       20      (222)          (202)            61           5            66           109          57       166
- Non-controlling interests                                4       (13)            (9)            15           7            22            22          10        32

(Loss) / earnings per share                6                                   (35.5)c                                   13.3c                               31.2c
                                      
Diluted (loss) / earnings per share (v)    6                                   (35.5)c                                   13.3c                               31.1c

Footnotes:
(i)   Underlying results are based on reported results excluding the effect of special items as defined in note 3.
(ii)  (LBITDA) / EBITDA is operating (loss) / profit before depreciation, amortisation and impairment of goodwill, intangibles and property, plant and equipment.
(iii) Operating (loss) / profit is defined as revenue less operating expenses before impairment of available for sale financial assets, finance income and expenses and share of
      (loss) / profit of equity accounted investments.
(iv)  The income tax credit substantially relates to overseas taxation and includes exchange gains of $23 million (6 months to 31 March 2013 - exchange gains of $47 million and
      year ended 30 September 2013 - exchange gains of $80 million) as disclosed in note 5.
(v)   Diluted (loss) / earnings per share is based on the weighted average number of ordinary shares in issue adjusted by dilutive outstanding share options.

Consolidated statement of comprehensive income
for the 6 months to 31 March 2014
                                                                                     6 months to   6 months to     Year ended
                                                                                        31 March      31 March   30 September
                                                                                            2014          2013           2013
                                                                              Note            $m            $m             $m
(Loss) / profit for the period                                                             (211)            88            198

Items that may be reclassified subsequently to the income statement
- Changes in fair value of available for sale financial assets                  8            (1)           (2)              -
- Changes in settled cash flow hedges released to the income statement                         -             8              8
- Foreign exchange loss on retranslation of equity accounted investments                     (2)           (6)            (9)
- Deferred tax on items taken directly to the statement of comprehensive income                1             -              -
Total other comprehensive expenses for the period                                            (2)             -            (1)

Total comprehensive (loss) / income for the period                                         (213)            88            197

Attributable to:
- Equity shareholders of Lonmin Plc                                                        (204)            67            166
- Non-controlling interests                                                                  (9)            21             31
                                                                                           (213)            88            197

Consolidated statement of financial position                                                    
as at 31 March 2014                                                                             
                                                              As at      As at          As at   
                                                           31 March   31 March   30 September   
                                                               2014       2013           2013   
                                                    Note         $m         $m             $m   
Non-current assets                                                                              
Goodwill                                                         40         40             40   
Intangible assets                                               460        469            462   
Property, plant and equipment                                 2,891      2,885          2,908   
Equity accounted investments                                     32         36             36   
Other financial assets                                 8        289        399            430   
                                                              3,712      3,829          3,876   
Current assets                                                                                  
Inventories                                                     351        381            449   
Trade and other receivables                                      55         99             86   
Tax recoverable                                                   1          4              4   
Cash and cash equivalents                              9        660        196            201   
                                                              1,067        680            740   
Current liabilities                                                                             
Trade and other payables                                      (166)      (248)          (295)   
Interest bearing loans and borrowings                  9      (277)        (2)              -   
Deferred revenue                                               (23)       (23)           (23)   
                                                              (466)      (273)          (318)   
Net current assets                                              601        407            422   
Non-current liabilities                                                                         
Interest bearing loans and borrowings                  9      (312)          -              -   
Deferred tax liabilities                                      (431)      (527)          (501)   
Deferred revenue                                               (37)       (61)           (47)   
Provisions                                                    (138)      (139)          (140)   
                                                              (918)      (727)          (688)   
Net assets                                                    3,395      3,509          3,610   
Capital and reserves                                                                            
Share capital                                                   569        568            569   
Share premium                                                 1,411      1,411          1,411   
Other reserves                                                   88         88             88   
Retained earnings                                             1,151      1,240          1,341   
Attributable to equity shareholders of Lonmin Plc             3,219      3,307          3,409   
Attributable to non-controlling interests                       176        202            201   
Total equity                                                  3,395      3,509          3,610   


Consolidated statement of changes in equity
for the 6 months to 31 March 2014
                                                                         Equity shareholders' funds

                                                           Called      Share                                                 Non-
                                                         up share    premium        Other      Retained               controlling       Total
                                                           capital   account  reserves(i)  earnings(ii)     Total  interests(iii)      equity
                                                              $m          $m           $m            $m        $m              $m          $m
At 1 October 2012                                            203         997           80         1,208     2,488             257       2,745
Profit for the period                                          -           -            -            66        66              22          88
Total other comprehensive income:                              -           -            8           (7)         1             (1)           -
- Change in fair value of available for sale financial
  assets                                                       -           -            -           (2)       (2)               -         (2)
- Changes in settled cash flow hedges released to
  the income statement                                         -           -            8             -         8               -           8
- Foreign exchange loss on retranslation of equity
  accounted investments                                        -           -            -           (5)       (5)             (1)         (6)
Transactions with owners, recognised directly in
equity:                                                      365         414            -          (27)       752            (76)         676
- Share-based payments                                         -           -            -            12        12               -          12
- Incwala equity accounting adjustment (iv)                    -           -            -          (39)      (39)            (76)       (115)
- Share capital and share premium recognised on
  Rights Issue (v)                                           365         459            -             -       824               -         824
- Rights Issue costs charged to share premium (v)              -        (45)            -             -      (45)               -        (45)
At 31 March 2013                                             568       1,411           88         1,240     3,307             202       3,509
At 1 April 2013                                              568       1,411           88         1,240     3,307             202       3,509
Profit for the period                                          -           -            -           100       100              10         110
Total other comprehensive expense:                             -           -            -           (1)       (1)               -         (1)
- Change in fair value of available for sale financial
  assets                                                       -           -            -             2         2               -           2
- Foreign exchange loss on retranslation of equity
  accounted investments                                        -           -            -           (3)       (3)               -         (3)
Transactions with owners, recognised directly in
equity:                                                        1           -            -             2         3            (11)         (8)
- Share-based payments                                         -           -            -             2         2               -           2
- Shares issued on exercise of share options                   1           -            -             -         1               -           1
- Dividends                                                    -           -            -             -         -            (11)        (11)
At 30 September 2013                                         569       1,411           88         1,341     3,409             201       3,610

                                                                        Equity shareholders' funds

                                                            Called       Share                                               Non-
                                                          up share     premium        Other      Retained               controlling      Total
                                                           capital     account   reserves(i)  earnings(ii)    Total  interests(iii)     equity
                                                                $m          $m          $m             $m        $m              $m         $m

At 1 October 2013                                              569       1,411           88         1,341     3,409             201      3,610
Loss for the period                                              -           -            -         (202)     (202)             (9)      (211)
Total other comprehensive expense:                               -           -            -           (2)       (2)               -        (2)
- Change in fair value of available for sale financial
  assets                                                         -           -            -           (1)       (1)               -        (1)
- Foreign exchange loss on retranslation of equity
  accounted investments                                          -           -            -           (2)       (2)               -        (2)
- Deferred tax on items taken directly to the
  statement of comprehensive income                              -           -            -             1         1               -          1
Transactions with owners, recognised directly in
equity:                                                          -           -            -            14        14            (16)        (2)
- Share-based payments                                           -           -            -            14        14               -         14
- Dividends                                                      -           -            -             -         -            (16)       (16)
At 31 March 2014                                               569       1,411           88         1,151     3,219             176      3,395

Footnotes:

(i)     Other reserves at 31 March 2014 represent the capital redemption reserve of $88 million (31 March 2013 and 30 September 2013 - $88 million).
(ii)    Retained earnings include $4 million of accumulated credits in respect of fair value movements on available for sale financial assets (31 March 2013 - $3 million and 30
        September 2013 - $5 million) and an $8 million debit of accumulated exchange on retranslation of equity accounted investments (31 March 2013 - $2 million debit and 30
        September 2013 - $6 million debit).
(iii)   Non-controlling interests represent a 13.76% effective shareholding in Eastern Platinum Limited, Western Platinum Limited and Messina Limited and a 19.87% effective
        shareholding in Akanani Mining (Proprietary) Limited.
(iv)    Where an associate owns an equity interest in a group entity an adjustment is made to the equity accounting and the non-controlling interest to avoid double counting.
        Any difference between the adjustment to the investment in the associate and non-controlling interest is taken direct to equity.
(v)     During December 2012 the Group undertook a Rights Issue in which 365,496,943 shares were issued.

Consolidated statement of cash flows                                                                                    
for the 6 months to 31 March 2014                                                                                       
                                                                             6 months to   6 months to     Year ended   
                                                                                31 March      31 March   30 September   
                                                                                    2014          2013           2013   
                                                                      Note            $m            $m             $m   
(Loss) / profit for the period                                                     (211)            88            198   
Taxation                                                                 5          (67)          (34)           (58)   
Share of loss / (profit) after tax of equity accounted investments                     2           (3)            (4)   
Finance income                                                           4          (25)          (25)           (35)   
Finance expenses                                                         4           170            64             44   
Impairment of available for sale financial assets                        3             -             -              2   
Non-cash movement on deferred revenue                                               (10)          (10)           (24)   
Depreciation, amortisation and impairment                                             69            78            157   
Change in inventories                                                                 98         (121)          (189)   
Change in trade and other receivables                                                 31          (15)            (2)   
Change in trade and other payables                                                 (129)          (80)           (32)   
Change in provisions                                                                 (6)          (14)           (23)   
Share-based payments                                                                  14            12             14   
Loss on disposal of property, plant and equipment                                      -             -              5   
Cash (outflow) / inflow from operations                                             (64)          (60)             53   
Interest received                                                                      2             1              1   
Interest and bank fees paid                                                         (10)          (24)           (34)   
Tax recovered / (paid)                                                                 1           (2)            (4)   
Cash (outflow) / inflow from operating activities                                   (71)          (85)             16   
Cash flow from investing activities                                                                                     
Distribution from joint venture                                                        -             2              1   
Purchase of property, plant and equipment                                           (45)          (70)          (156)   
Purchase of intangible assets                                                        (1)           (3)            (3)   
Cash outflow from investing activities                                              (46)          (71)          (158)   
Cash flow from financing activities                                                                                     
Dividends paid to non-controlling interests                                         (16)             -           (11)   
Proceeds from current borrowings                                         9           395             -            257   
Repayment of current borrowings                                          9         (118)         (120)          (380)   
Proceeds from non-current borrowings                                     9           312           200            369   
Repayment of non-current borrowings                                      9             -         (819)          (988)   
Proceeds from equity issuance                                                          -           823            823   
Costs of issuing shares                                                                -          (45)           (45)   
Loss on forward exchange contracts on equity issuance                                  -          (11)           (11)   
Issue of ordinary share capital other than through the Rights
Issue                                                                                  -             -              1   
Cash inflow from financing activities                                                573            28             15   
Increase / (decrease) in cash and cash equivalents                       9           456         (128)          (127)   
Opening cash and cash equivalents                                        9           201           315            315   
Effect of exchange rate changes                                          9             3             9             13   
Closing cash and cash equivalents                                        9           660           196            201   


Notes to the accounts

1   Statement on accounting policies

Basis of preparation

Lonmin Plc (the Company) is a Company domiciled in the United Kingdom. The condensed consolidated interim financial
statements of the Company as at and for the six months to 31 March 2014 comprise the Company and its subsidiaries
(together referred to as the Group) and the Group's interests in equity accounted investments.

These condensed consolidated interim financial statements have been prepared in accordance with IAS 34 - Interim
Financial Reporting, as adopted by the EU. The annual financial statements of the Group are prepared in accordance
with International Financial Reporting Standards (IFRSs), as adopted by the EU. As required by the Disclosure and
Transparency Rules of the Financial Conduct Authority, the condensed set of financial statements have been prepared
applying the accounting policies and presentation that were applied in the preparation of the Company’s published
consolidated financial statements for the year ended 30 September 2013, except as noted below. They do not include all
of the information required for full annual financial statements and should be read in conjunction with the consolidated
financial statements of the Group for the year ended 30 September 2013.

The comparative figures for the financial year ended 30 September 2013 are not the Group's full statutory accounts for
that financial year. Those accounts have been reported on by the Group's auditors and delivered to the registrar of
companies. The report of the auditors was (i) unqualified, (ii) did not include a reference to any matters to which the
auditors drew attention by way of emphasis without qualifying their report, and (iii) did not contain a statement under
section 498 (2) or (3) of the Companies Act 2006.

The consolidated financial statements of the Group as at and for the year ended 30 September 2013 are available upon
request from the Company's registered office at 4 Grosvenor Place, London, SW1X 7YL.

These condensed consolidated interim financial statements were approved by the Board of Directors on 9 May 2014.

These condensed consolidated interim financial statements apply the accounting policies and presentation that will be
applied in the preparation of the Group's published consolidated financial statements for the year ending 30 September
2014.

Going concern

In determining the appropriate basis of preparation of the financial statements, the Directors are required to consider
whether the Group can continue in operational existence for the foreseeable future.

In December 2012, following the events at Marikana, Lonmin Plc successfully concluded a Rights Issue which raised net
proceeds of $767 million. In conjunction with the Rights Issue, Lonmin Plc negotiated certain amendments to the terms
of the Group’s existing debt facilities. The proceeds of the Rights Issue were utilised to reduce the Group’s debt
exposure. The debt facilities currently available to the Group are summarised as follows:

-   Revolving Credit Facility of $400 million at a Lonmin Plc level; and
-   Three bilateral facilities of R660 million each at a Western Platinum Limited (WPL) level.

At 31 March 2014 these facilities were fully drawn down and the Group had cash resources of $660 million. The revised
capital structure has allowed the business to absorb the financial impact of the current protected strike action in the
South African Platinum sector which commenced on 23 January 2014 and is ongoing at the date of approval of these
condensed interim financial statements. The strike has had a significant financial impact as fixed production overheads
continue to be incurred with no associated production output. The non-resolution of the current strike action therefore
poses the most significant risk to the Group’s ability to continue as a going concern.

The financial performance of the Group is also dependent upon the wider economic environment in which the Group
operates. Factors exist which are outside the control of management which can have a significant impact on the
business, specifically, volatility in the Rand / US Dollar exchange rate and PGM commodity prices.

In assessing the Group’s ability to continue as a going concern, the Directors have prepared cash flow forecasts for a
period in excess of 12 months. These cash flow forecasts are based on the assumption that the strike action will end and
workers will return to their stations in June 2014 and the Group’s existing drawn down facilities will be rolled over within
the terms of the existing facilities including those for rollover in August 2014. In addition to this, various scenarios have
been considered to test the Group’s resilience against operational risks including:

-   Adverse movements in the Rand / US Dollar exchange rate and PGM commodity prices or a combination thereof.
-   Failure to meet forecast production targets.

The Directors have concluded that the Group’s capital structure provides sufficient head room to cushion against
downside operational risks and minimises the risk of breaching debt covenants on the assumption that the strike action
will end and the workers return to their stations in June 2014.

However, should the resolution of the strike action be delayed beyond June 2014, this would require the Group to take
other operational measures to ensure that it has sufficient funds to facilitate all ongoing operations on start-up. These
may include, but are not limited to:

-   Renegotiating conditions of employment with employees not on strike and other cost reduction measures.
-   Renegotiating some or all of the Group’s existing bank facilities and covenants.
-   Tapping into alternative sources of funding.
-   Restructuring the business.

The lack of clarity over:

-   the end date of the strike;
-   the continued availability of sufficient, appropriate debt facilities and, in particular, the ability of the Group to
    withstand down side scenarios affecting cash flows and covenants which is largely dependent on timing of resolution
    of the strike; and
-   whether such operational measures, if required should the resolution of the strike action be delayed beyond June
    2014, would be possible and successful,

represents a material uncertainty that may cast significant doubt about the Group’s ability to continue as a going concern
such that the Group may be unable to realise its assets and discharge its liabilities in the normal course of business.

Nevertheless, based on the Group’s expectation that the strike action will be resolved within a reasonable period and
further management actions which would be taken if this proved not to be the case being possible and successful, the
Directors believe that the Group will continue to have adequate financial resources to meet obligations as they fall due
and comply with its financial covenants and accordingly have formed a judgement that it is appropriate to prepare the
financial statements on a going concern basis. Therefore, these financial statements do not include any adjustments that
would result if the going concern basis of preparation is inappropriate.

New standards and amendments in the period

The following IFRS’s have been adopted in these condensed consolidated financial statements. The application of these
IFRS’s have not had any material impact on the amounts reported for the current and prior periods.

        IFRIC 20 – Stripping costs in the production phase of a surface mine (effective 1 January 2013) requires that
        stripping costs incurred, which provide improved access to the ore, be recognised as a non-current asset
        ("stripping activity asset") when certain criteria are met. The principles of IFRIC 20 were adopted by the Group
        in 2012.

        Amendment to IAS 16 – Property, plant and equipment (effective 1 January 2013) clarifies the accounting for
        spare parts, stand-by equipment and servicing equipment.

        Amendment to IAS 34 – Disclosure of segment assets and segment liabilities (effective 1 January 2013) aligns
        the disclosure requirements for segment assets and segment liabilities in interim financial reporting with IFRS 8
        Operating segments.

        IFRS 13 – Fair value measurement (effective 1 January 2013) defines fair value, establishes a framework for
        measuring fair value and sets out disclosure requirements for fair value measurements.

        Amendments to IAS 36 - Recoverable amount disclosures for non-financial assets (effective 1 January 2014,
        but early adopted by the Group) reverses the unintended requirement in IFRS 13 Fair Value Measurement to
        disclose the recoverable amount of every cash-generating unit to which significant goodwill or indefinite-lived
        intangible assets have been allocated. Under the amendments, recoverable amount is required to be disclosed
        only when an impairment loss has been recognised or reversed.

There were no other new standards, interpretations or amendments to standards issued and effective for the period
which materially impacted the Group.

New standards that are relevant to the Group but not yet effective

There are no new standards, interpretations or amendments to standards issued, but not yet effective for the period
which are expected to materially impact the Group’s financial statements.

2   Segmental analysis

The Group distinguishes between three reportable operating segments being the Platinum Group Metals (PGM)
Operations segment, the Evaluation segment and the Exploration segment.

The PGM Operations segment comprises the activities involved in the mining and processing of PGMs, together with
associated base metals, which are carried out entirely in South Africa. These operations are integrated and designed to
support the process for extracting and refining PGMs from underground. PGMs move through each stage of the process
and undergo successive levels of refinement which result in fully refined metals. The Chief Executive Officer, who
performs the role of Chief Operating Decision Maker (CODM), views the PGM Operations segment as a single whole for
the purposes of financial performance monitoring and assessment and does not make resource allocations based on
margin, costs or cash flows incurred at each separate stage of the process. In addition, the CODM makes his decisions
for running the business on a day to day basis using the physical operating statistics generated by the business as these
summarise the operating performance of the entire segment.

The Evaluation segment covers the evaluation through pre-feasibility of the economic viability of newly discovered PGM
deposits. Currently all of the evaluation projects are based in South Africa.

The Exploration segment covers the activities involved in the discovery or identification of new PGM deposits. This
activity occurs on a worldwide basis.

No operating segments have been aggregated. Operating segments have consistently adopted the consolidated basis of
accounting and there are no differences in measurement applied. Other covers mainly the results and investment
activities of the corporate Head Office. The only intersegment transactions involve the provision of funding between
segments and any associated interest.

                                                                       6 months to 31 March 2014
                                                   PGM
                                            Operations    Evaluation   Exploration                 Intersegment
                                               Segment       Segment       Segment        Other     Adjustments    Total
                                                    $m            $m            $m           $m              $m       $m
Revenue (external sales by product):
   Platinum                                        369             -             -            -               -      369
   Palladium                                       100             -             -            -               -      100
   Gold                                             10             -             -            -               -       10
   Rhodium                                          54             -             -            -               -       54
   Ruthenium                                         4             -             -            -               -        4
   Iridium                                          10             -             -            -               -       10
   PGMs                                            547             -             -            -               -      547
   Nickel                                           15             -             -            -               -       15
   Copper                                            6             -             -            -               -        6
   Chrome                                           10             -             -            -               -       10
                                                   578             -             -            -               -      578
Underlying (i):
EBITDA / (LBITDA) (ii)                             105             2           (2)          (2)               -      103
Depreciation, amortisation and
impairment                                        (69)             -             -            -               -     (69)
                           
Operating profit / (loss) (ii)                      36             2           (2)          (2)               -       34
Finance income                                       4             -             -           10            (10)        4
Finance expenses                                  (14)             -             -          (6)              10     (10)
Share of loss of equity accounted
investments                                        (2)             -             -            -               -      (2)
Profit / (loss) before taxation                     24             2           (2)            2               -       26
Income tax expense                                 (2)             -             -            -               -      (2)
Underlying profit / (loss) after taxation           22             2           (2)            2               -       24
Special items (note 3)                            (96)             -             -        (139)               -    (235)
(Loss) / profit after taxation                    (74)             2           (2)        (137)               -    (211)
              
Total assets (iii)                               3,792           273             3        1,791         (1,080)    4,779
                  
Total liabilities (iv)                         (1,807)         (186)          (46)        (425)           1,080  (1,384)
Net assets / (liabilities)                       1,985            87          (43)        1,366               -    3,395

Share of net assets of equity accounted
investments                                         32             -             -            -               -       32
Additions to property, plant, equipment
and intangibles                                     50             -             -            -               -       50

Material non-cash items – share-based
payments                                            14             -             -            -               -       14

                                                                       6 months to 31 March 2013
                                                   PGM
                                            Operations    Evaluation   Exploration                  Intersegment
                                               Segment       Segment       Segment          Other    Adjustments    Total
                                                    $m           $m             $m             $m             $m       $m

Revenue (external sales by product):
   Platinum                                        521             -             -              -              -      521
   Palladium                                       100             -             -              -              -      100
   Gold                                             13             -             -              -              -       13
   Rhodium                                          40             -             -              -              -       40
   Ruthenium                                         5             -             -              -              -        5
   Iridium                                          11             -             -              -              -       11
   PGMs                                            690             -             -              -              -      690
   Nickel                                           24             -             -              -              -       24
   Copper                                            8             -             -              -              -        8
   Chrome                                           13             -             -              -              -       13
                                                   735             -             -              -              -      735
Underlying (i):
                       
EBITDA / (LBITDA) (ii)                             180             4           (1)           (12)              -      171
Depreciation, amortisation and
                                                                                                                     (78)
impairment                                        (78)             -             -              -              -
Operating profit / (loss) (ii)                     102             4           (1)           (12)              -       93
Finance income                                      11             -             -              5            (7)        9
Finance expenses                                  (14)             -             -            (9)              7     (16)
Share of profit of equity accounted
                                                                                                                        3
investments                                          3             -             -              -              -
Profit / (loss) before taxation                    102             4           (1)           (16)              -       89
Income tax expense                                (13)             -             -              -              -     (13)
Underlying profit / (loss) after taxation           89             4           (1)           (16)              -       76
Special items (note 3)                              45             -             -           (33)              -       12
Profit / (loss) after taxation                     134             4           (1)           (49)              -       88

Total assets (iii)                               3,819           275             1          1,507        (1,093)    4,509
                  
Total liabilities (iv)                         (1,828)         (193)          (48)           (24)          1,093  (1,000)
Net assets / (liabilities)                       1,991            82          (47)          1,483              -    3,509

Share of net assets of equity accounted
investments                                         36             -             -              -              -       36
Additions to property, plant, equipment
and intangibles                                     75             7             -              -              -       82

Material non-cash items – share-based
payments                                            12             -             -              -              -       12

                                                                       Year ended 30 September 2013
                                                   PGM
                                            Operations    Evaluation     Exploration                  Intersegment
                                               Segment       Segment         Segment         Other     Adjustments    Total
                                                    $m            $m              $m            $m              $m       $m
Revenue (external sales by product):
   Platinum                                      1,055             -               -             -               -    1,055
   Palladium                                       224             -               -             -               -      224
   Gold                                             28             -               -             -               -       28
   Rhodium                                          85             -               -             -               -       85
   Ruthenium                                        13             -               -             -               -       13
   Iridium                                          27             -               -             -               -       27
   PGMs                                          1,432             -               -             -               -    1,432
   Nickel                                           46             -               -             -               -       46
   Copper                                           15             -               -             -               -       15
   Chrome                                           27             -               -             -               -       27
                                                 1,520             -               -             -               -    1,520
Underlying (i):
                       
EBITDA / (LBITDA) (ii)                             339             8             (4)          (22)               -      321
Depreciation, amortisation and
impairment                                       (157)             -               -             -               -    (157)
                           
Operating profit / (loss) (ii)                     182             8             (4)          (22)               -      164
Finance income                                      13             -               -            14            (18)        9
Finance expenses                                  (25)             -               -          (12)              18     (19)
Share of profit of equity accounted
investments                                          4             -               -             -               -        4
Profit / (loss) before taxation                    174             8             (4)          (20)               -      158
Income tax expense                                (27)             -               -             -               -     (27)
Underlying profit / (loss) after taxation          147             8             (4)          (20)               -      131
Special items (note 3)                              68             -               -           (1)               -       67
Profit / (loss) after taxation                     215             8             (4)          (21)               -      198

Total assets (iii)                               3,899           276               -         1,603         (1,162)    4,616
                  
Total liabilities (iv)                         (1,909)         (187)            (42)          (30)           1,162  (1,006)
Net assets / (liabilities)                       1,990            89            (42)         1,573               -    3,610

Share of net assets of equity accounted
investments                                         36             -               -             -               -       36
Additions to property, plant, equipment
and intangibles                                    174             7               -             -               -      181

Material non-cash items – share-based
payments                                            13             -               -             1               -       14

Revenue by destination is analysed by geographical area below:

                 6 months to     6 months to          Year ended   
               31 March 2014   31 March 2013   30 September 2013   
                          $m              $m                  $m   
The Americas              91             221                 411   
Asia                     167             237                 461   
Europe                   252             215                 451   
South Africa              68              62                 197   
                         578             735               1,520   


The Group's revenues are all derived from the PGM Operations segment. This segment has two major customers who
contributed 59% ($341 million) and 26% ($150 million) of revenue in the six months to 31 March 2014, 59% ($431 million)
and 32% ($234 million) in the six months to 31 March 2013 and 62% ($937 million) and 30% ($459 million) in the year ended
30 September 2013.

Metal sales prices are based on market prices which are denominated in US Dollars. The majority of sales are also invoiced
in US Dollars with the exception of certain sales in South Africa which are invoiced in South African Rand based on exchange
rates determined in accordance with the contractual arrangement.

Non-current assets, excluding financial instruments, by geographical area are shown below:

                       As at           As at               As at   
               31 March 2014   31 March 2013   30 September 2013   
                          $m              $m                  $m   
South Africa           3,423           3,429               3,446   
Europe                     -               1                   -   
                       3,423           3,430               3,446   


Footnotes:

(i)   Underlying results are based on reported results excluding the effect of special items as defined in note 3.
(ii)  (LBITDA) / EBITDA and operating (loss) / profit are the key profit measures used by management.
(iii) The assets under "Other" include the HDSA receivable of $260 million (31 March 2013 - $366 million, 30 September 2013 - $399 million) and intercompany receivables of
      $1,008 million (31 March 2013 - $1,019 million, 30 September 2013 - $1,162 million).
(iv)  The liabilities under "Other" include borrowings of $401 million (31 March 2013 and 30 September 2013 - $nil).

3   Special items

"Special items" are those items of financial performance that the Group believes should be separately disclosed on the face of
the consolidated income statement to assist in the understanding of the financial performance achieved by the Group and for
consistency with prior periods.

                                                                           6 months to   6 months to     Year ended
                                                                              31 March      31 March   30 September
                                                                                  2014          2013           2013
                                                                                    $m            $m             $m
Operating loss:                                                                  (165)           (3)           (17)
                       
- Strike related costs (i)
    Idle fixed production costs                                                  (157)             -              -
    Contract costs                                                                 (3)             -              -
    Security costs                                                                 (4)             -            (1)
    Other costs                                                                      -           (2)            (6)
                                         
- Restructuring and reorganisation costs (ii)                                      (1)           (1)           (10)
Impairment of available for sale financial assets                                    -             -            (2)
Net finance (expenses) / income:                                                 (139)          (32)              1
- Interest accrued from HDSA receivable (iii)                                        9             8             17
- Foreign exchange gain / (loss) on HDSA receivable (iii)                           12          (23)              1
- Impairment of HDSA receivable (iii)                                            (160)             -              -
- Net change in fair value of settled cash flow hedges                               -             7              7
- Unwinding fees relating to early settlement of interest rate swap                  -          (14)           (14)
- Foreign exchange gain on holding Rights Issue proceeds received in
  advance                                                                            -             1              1
- Loss on forward exchange contracts in respect of Rights Issue                      -          (11)           (11)

Loss on special items before taxation                                            (304)          (35)           (18)
Taxation related to special items (note 5)                                          69            47             85
Special (loss) / gain before non-controlling interests                           (235)            12             67
Non-controlling interests                                                           13           (7)           (10)
Special (loss) / gain for the period attributable to equity shareholders
of Lonmin Plc                                                                    (222)            5              57

Footnotes:
(i)     Fixed production overheads incurred during the protected strike period for which there was no associated revenue and costs arising directly as a result of the strike action
        have been classified as special items. The total of these strike related costs amounted to $164 million. Idle fixed production costs incurred during the strike period
        amounted to $157 million. Costs relating to contractors not being able to fulfil their obligations as a result of the disruption amounted to $3 million. Additional security
        costs of $4 million were also incurred.
(ii)    These costs relate to the management restructuring exercise completed in 2013.
(iii)   During the year ended 30 September 2010 the Group provided financing to assist Lexshell 806 Investments (Proprietary) Limited, a subsidiary of Shanduka Resources
        (Proprietary) Limited (Shanduka) to acquire a majority shareholding in Incwala, Lonmin's Black Economic Empowerment partner. This financing gave rise to foreign
        exchange movements and the accrual of interest. Refer to note 8 for details regarding the impairment of the HDSA receivable.

4   Net finance expenses

                                                                      6 months to   6 months to     Year ended
                                                                         31 March      31 March   30 September
                                                                             2014          2013           2013
                                                                               $m            $m             $m
Finance income:                                                                 4             9              9
- Interest receivable on cash and cash equivalents                              2             1              1
- Foreign exchange gains on net cash / (debt) (i)                               2             8              8
Finance expenses:                                                            (10)          (16)           (19)
- Interest payable on bank loans and overdrafts                               (5)           (9)           (11)
- Bank fees                                                                   (5)           (3)            (7)
- Unamortised bank fees realised on settlement of old loan facility             -           (3)            (3)
- Capitalised interest ii                                                       4             9             11
- Unwind of discounting on provisions                                         (4)          (10)            (9)

Special items (note 3):                                                     (139)          (32)              1
- Interest accrued on HDSA receivable                                           9             8             17
- Foreign exchange gain / (loss) on HDSA receivable                            12          (23)              1
- Impairment of HDSA receivable                                             (160)             -              -
- Net change in fair value of settled cash flow hedges                          -             7              7
- Unwinding fees relating to early settlement of interest rate swap             -          (14)           (14)
- Foreign exchange gain on holding Rights Issue proceeds
  received in advance                                                           -             1              1
- Loss on forward exchange contracts in respect of Rights Issue                 -          (11)           (11)

Net finance expenses                                                        (145)          (39)            (9)

Footnotes:
(i)   Net cash as defined by the Group comprises cash and cash equivalents, bank overdrafts repayable on demand and interest bearing loans and borrowings less unamortised
      bank fees, unless the unamortised bank fees relate to undrawn facilities in which case they are treated as other receivables.
(ii)  Interest expenses incurred have been capitalised on a Group basis to the extent that there is an appropriate qualifying asset. The weighted average interest rate used by the
      Group for capitalisation in the period was 5.0% (6 months to 31 March 2013 – 5.7%, year ended 30 September 2013 – 5.9%).

5   Taxation
                                                                  6 months to  6 months to      Year ended
                                                                     31 March     31 March    30 September
                                                                         2014         2013            2013
                                                                           $m           $m              $m
Current tax charge (excluding special items):
United Kingdom tax expense
- Current tax expense at 23% (March 2013 - 24%, September 2013 –
  23.5%) (i)                                                                -             -              -

Overseas current tax expense at 28% (2013 – 28%)                            2             -              2
- Corporate tax expense – current year                                      2             -              3
- Adjustment in respect of prior years                                      -             -            (1)

Deferred tax charge (excluding special items):
Deferred tax expense – UK and overseas                                      -            13             25
- Origination and reversal of temporary differences                         4            13             26
- Adjustment in respect of prior years                                    (4)             -            (1)

Tax credit on special items - UK and overseas (note 3):                  (69)          (47)           (85)
- Exchange on current taxation (ii)                                         -             -              1
- Exchange on deferred taxation (ii)                                     (23)          (47)           (81)
- Deferred tax on special items impacting profit before tax              (46)             -            (5)

Actual tax credit                                                        (67)          (34)           (58)

Tax charge excluding special items (note 3)                                 2            13             27

Effective tax rate                                                      (24%)         (63%)          (41%)

Effective tax rate excluding special items (note 3)                        8%           15%            17%

5   Taxation (continued)

A reconciliation of the standard tax charge to the actual tax charge was as follows:

                                                           6 months to   6 months to   6 months to   6 months to     Year ended     Year ended
                                                              31 March      31 March      31 March      31 March   30 September   30 September
                                                                  2014          2014          2013          2013           2013           2013
                                                                     %            $m             %            $m              %             $m
Tax (credit) / charge on (loss) / profit at standard tax
rate                                                              (28)          (78)            28            15             28             39
Tax effect of:
                     
- Unutilised losses (iii, iv)                                       13            38            17             9              4              5
- Foreign exchange impacts on taxable profits                      (3)           (9)          (26)          (14)           (17)           (23)
- Adjustment in respect of prior years                             (1)           (4)             -             -            (1)            (2)
- Disallowed expenditure                                            19            53             -             -              1              1
- Expenses not subject to tax                                        1             2             5             3              5              7
- Special items as defined above                                  (25)          (69)          (87)          (47)           (61)           (85)
Actual tax credit                                                 (24)          (67)          (63)          (34)           (41)           (58)

The Group's primary operations are based in South Africa. The South African statutory tax rate is 28% (2013 - 28%). Lonmin
Plc operates a branch in South Africa which is subject to a tax rate of 28% on branch profits (2013 – 28%).

Footnotes:
(i)   Effective from 1 April 2014 the United Kingdom tax rate will change from 23% to 21% and from 21% to 20% from 1 April 2015. This does not materially impact the Group's
      recognised deferred tax liabilities.
(ii)  Overseas tax charges are predominantly calculated in Rand as required by the local authorities. As these subsidiaries’ functional currency is US Dollar this leads to a variety
      of foreign exchange impacts being the retranslation of current and deferred tax balances and monetary assets, as well as other translation differences. The Rand
      denominated deferred tax balance in US Dollars at 31 March 2014 is $366 million (31 March 2013 - $425 million, 30 September 2013 - $388 million).
(iii) Unutilised losses increased due to a change in SA tax legislation of $37million.
(iv)  Unutilised losses reflect losses generated in entities for which no deferred tax is provided as it is not thought probable that future profits can be generated against which a
      deferred tax asset could be offset or previously unrecognised losses utilised.

6   (Loss) / earnings per share

(Loss) / earnings per share ((LPS) / EPS) has been calculated on the loss for the period attributable to equity shareholders
amounting to $202 million (6 months to 31 March 2013 - profit of $66 million, year ended 30 September 2013 - profit of $166
million) using a weighted average number of 569.5 million ordinary shares in issue for the 6 months to 31 March 2014 (6
months to 31 March 2013 – 495.1 million ordinary shares, year ended 30 September 2013 – 532.1 million ordinary shares).

Diluted (loss) / earnings per share is based on the weighted average number of ordinary shares in issue adjusted by dilutive
outstanding share options in accordance with IAS 33 - Earnings Per Share. In the 6 months to 31 March 2014 outstanding
share options were anti-dilutive and so were excluded from diluted loss per share in accordance with IAS 33 – Earnings Per
Share.

                              6 months to 31 March 2014          6 months to 31 March 2013        Year ended 30 September 2013

                              Loss                            Profit                   Per      Profit                  Per
                           for the      Number  Per share    for the       Number    share     for the      Number    share
                            period   of shares     amount     period    of shares   amount        year   of shares   amount
                                $m    millions      cents         $m     millions    cents          $m    millions    cents
Basic (LPS) / EPS            (202)       569.5     (35.5)         66       495.1      13.3         166       532.1     31.2
Share option schemes             -           -          -          -         1.2         -           -         2.1    (0.1)
Diluted (LPS) / EPS          (202)       569.5     (35.5)         66       496.3      13.3         166       534.2     31.1

                              6 months to 31 March 2014          6 months to 31 March 2013        Year ended 30 September 2013

                            Profit                            Profit                   Per      Profit                  Per
                           for the      Number  Per share    for the       Number    share     for the      Number    share
                            period   of shares     amount     period    of shares   amount        year   of shares   amount
                                $m    millions      cents         $m     millions    cents          $m    millions    cents
Underlying EPS                  20       569.5        3.5         61        495.1     12.3         109       532.1     20.5
Share option schemes             -           -          -          -          1.2        -           -         2.1    (0.1)
Diluted underlying EPS          20       569.5        3.5         61        496.3     12.3         109       534.2     20.4

Underlying earnings per share have been presented as the Directors consider it important to present the underlying results of
the business. Underlying earnings per share are based on the earnings attributable to equity shareholders adjusted to
exclude special items (as defined in note 3) as follows:

                             6 months to 31 March 2014           6 months to 31 March 2013        Year ended 30 September 2013

                            Profit                            Profit                   Per      Profit      Number      Per
                           for the      Number  Per share    for the       Number    share     for the          of    share
                            period   of shares     amount     period    of shares   amount        year      shares   amount
                                $m    millions      cents         $m     millions    cents          $m    millions    cents
Basic (LPS) / EPS            (202)       569.5     (35.5)         66        495.1     13.3         166       532.1     31.2
Special items (note 3)         222           -       39.0        (5)           -     (1.0)        (57)           -   (10.7)
Underlying EPS                  20       569.5        3.5         61        495.1     12.3         109       532.1     20.5

Headline (loss) / earnings and the resultant headline (loss) / earnings per share are specific disclosures defined and required
by the Johannesburg Stock Exchange.

These are calculated as follows:

                                                                         6 months to  6 months to      Year ended
                                                                            31 March     31 March    30 September
                                                                                2014         2013            2013
                                                                                  $m           $m              $m
(Loss) / earnings attributable to ordinary shareholders (under IAS 33)         (202)           66             166
Add back loss on disposal of property, plant and equipment                         -            -               5
Add back impairment of assets (note 3)                                             -            -               2
Tax related to the above items                                                     -            -             (1)
Non-controlling interests                                                          -            -             (1)
Headline (loss) / earnings                                                     (202)           66             171

                                                                                                Year ended 30 September
                                 6 months to 31 March 2014       6 months to 31 March 2013               2013

                                 Loss                     Per  Profit                    Per   Profit    Number       Per
                              for the      Number       share for the      Number      share  for the        of     share
                               period   of shares      amount  period   of shares     amount     year    shares    amount
                                   $m    millions       cents      $m    millions      cents       $m  millions     cents
Headline (LPS) / EPS            (202)       569.5      (35.5)      66       495.1       13.3      171     532.1      32.1
Share option schemes                -           -           -       -         1.2          -        -       2.1     (0.1)
Diluted headline (LPS) / EPS    (202)       569.5      (35.5)      66       496.3       13.3      171     534.2      32.0

7   Dividends

No dividends were declared during the period (6 months to 31 March 2013 and year ended 30 September 2013 - $nil).

8   Other financial assets

                              Restricted   Available for        HDSA
                                    cash            sale   receivable   Total
                                      $m              $m           $m      $m
At 1 October 2013                     14              17          399     430
Interest accrued                       -               -            9       9
Movement in fair value                 -             (1)            -     (1)
Foreign exchange differences         (1)               -           12      11
Impairment loss                        -               -        (160)   (160)
At 31 March 2014                      13              16          260     289

                              Restricted       Available         HDSA
                                    cash        for sale   receivable   Total
                                      $m              $m           $m      $m
At 1 April 2013                       16              17          366     399
Interest accrued                       1               -            9      10
Movement in fair value                 -               2            -       2
Foreign exchange differences         (3)               -           24      21
Impairment loss                        -             (2)            -     (2)
At 30 September 2013                  14              17          399     430

                              Restricted       Available         HDSA
                                    cash        for sale   receivable   Total
                                      $m              $m           $m      $m
At 1 October 2012                     18              19          381     418
Interest accrued                       -               -            8       8
Movement in fair value                 -             (2)            -     (2)
Foreign exchange differences         (2)               -         (23)    (25)
At 31 March 2013                      16              17          366     399

Restricted cash deposits are in respect of rehabilitation obligations.

Available for sale financial assets include listed investments of $12 million (31 March 2013 - $13 million and 30 September
2013 - $13 million) held at fair value using the market price on 31 March 2014.

On 8 July 2010, Lonmin Plc entered into an agreement to provide financing of £200 million to Lexshell 806 Investments
(Proprietary) Limited, a subsidiary of Shanduka Resources (Proprietary) Limited, to facilitate the acquisition, at fair value, of
50.03% of shares in Incwala Resources (Proprietary) Limited (Incwala) from the original HDSA shareholders. The terms of
the financing provided by Lonmin Plc to the Shanduka subsidiary include the accrual of interest on the HDSA receivable at
fixed rates based on a principal value of £200 million which is repayable after 5 years including accrued interest, or earlier at
the Shanduka subsidiary’s discretion.

This HDSA receivable is secured on shares in the Shanduka subsidiary, whose only asset of value is its holding in Incwala.
As Incwala’s principal assets are investments in Western Platinum Limited (WPL), Eastern Platinum Limited (EPL) and
Akanani Mining (Proprietary) Limited, all subsidiaries of Lonmin Plc, the value in use models for the Marikana and Akanani
CGU’s (refer to note 10) are applied to determine the value of Incwala and in turn, the value of the Shanduka subsidiary’s
shareholding in Incwala (the security). The value of the security is $260 million at 31 March 2014. The carrying amount of the
HDSA receivable has been impaired by $160 million to bring it down to its recoverable amount. The impairment loss is largely
driven by a downward revision in PGM price assumptions applied to the valuation models. Any further changes in the key
assumptions would affect the value of the security which would lead to a further impairment or reversal of recognised
impairment as follows:

                                                    (Impairment) / write up of
Assumption                 Movement in assumption                   receivable

Metal prices                               +/- 5%              $60 m / ($60 m)
ZAR:USD exchange rate                      +/- 5%              $43 m / ($47 m)
Discount rates               +/- 100 basis points              ($44 m) / $54 m

9   Analysis of net cash (i)
                                                                                        Transfer of
                                                                                       unmortised
                                         As at                Foreign exchange       bank fees to        As at
                                     1 October                    and non-cash              other     31 March
                                          2013    Cash flow          movements        receivables         2014
                                            $m           $m                 $m                 $m           $m
Cash and cash equivalents                  201          456                  3                  -          660
Current borrowings                           -        (277)                  -                  -        (277)
Non-current borrowings                       -        (312)                  -                  -        (312)
                                 
Net cash as defined by the Group (i)       201        (133)                  3                  -           71

                                                                                      Transfer of
                                         As at                Foreign exchange    unmortised bank     As at 30
                                       1 April                    and non-cash      fees to other    September
                                          2013    Cash flow          movements        receivables         2013
                                            $m           $m                 $m                 $m           $m
Cash and cash equivalents                  196            1                  4                  -          201
Current borrowings                         (2)            3                (1)                  -            -
Unamortised bank fees (ii)                   -          (6)                  6                  -            -
Net cash as defined by the Group (i)       194          (2)                  9                  -          201

                                                                                      Transfer of
                                         As at                Foreign exchange    unmortised bank        As at
                                     1 October                    and non-cash      fees to other     31 March
                                          2012    Cash flow          movements        receivables         2013
                                            $m           $m                 $m                 $m           $m
Cash and cash equivalents                  315        (128)                  9                  -          196
Current borrowings                       (123)          120                  1                  -          (2)
Non-current borrowings                   (619)          619                  -                  -            -
                       
Unamortised bank fees (ii)                   6            3                (4)                (5)            -
Net (debt) / cash as defined by the
Group (i)                                (421)          614                  6                (5)          194

Footnotes:
(i)  Net cash / (debt) as defined by the Group comprises cash and cash equivalents, bank overdrafts repayable on demand and interest bearing loans and borrowings less
     unamortised bank fees, unless the unamortised bank fees relate to undrawn facilities in which case they are treated as other receivables.
(ii) As at 31 March 2014 unamortised bank fees of $4 million relating to undrawn facilities were treated as other receivables (31 March 2013 - $5 million and 30 September 2013
     - $5 million).

Borrowings consist of a $400 million syndicated revolving credit US Dollar facility and three South African Rand bilateral
facilities of R660 million each.

The main features of the $400 million syndicated facility which is supported by BNP Paribas S.A., Citigroup Global Markets
Limited, HSBC Bank Plc, J.P. Morgan Limited, Lloyds TSB Bank Plc, The Royal Bank of Scotland N.V. and Standard
Chartered Bank are as follows:

     -    a $400 million five-year committed revolving credit facility that matures in May 2016; and
     -    the margin on the facility is in the range 300bps to 375bps.

The three R660 million bilateral facilities are at the Western Platinum Limited level, an operating company. These facilities are
supported by FirstRand Bank Limited, Investec Bank Limited and The Standard Bank of South Africa Limited. The main
features of these facilities are as follows:

    -   each facility is of a revolving credit nature and consists of a R330 million five year committed component that matures
        in June 2016 and a R330 million one year committed component that can be rolled annually at the discretion of the
        bank (subsequent to 31 March 2014, the one year committed component has been rolled over to June 2015); and
    -   the margins on these facilities vary from facility to facility and bank to bank.

The following financial covenants apply to these facilities:

    -   consolidated tangible net worth will not be less than $2,250 million; 
    -   consolidated net debt will not exceed 25% of consolidated tangible net worth; and 
    -   if: 
        - in respect of the US Dollar Facilities Agreement, the aggregate amount of outstanding loans exceeds $75 million
             at any time during the last six months of any test period; or
        - in respect of both the US Dollar Facilities Agreement and the Rand Facilities Agreements, consolidated net debt
             exceeds $300 million as of the last day of any test period,

        the capital expenditure of the Group must not exceed the limits set out in the table below, provided that, if 110% of
        budgeted capital expenditure for any test period ending on or after 30 September 2013 is lower than the capital
        expenditure limit set out in the table below for that test period, then the capital expenditure limit for that test period
        shall be equal to 110% of such budgeted capital expenditure.

Test Period                                       Capital expenditure   
                                                          limit (ZAR)   
1 October 2012 to 31 March 2013 (inclusive)               800 000 000   
1 October 2012 to 30 September 2013 (inclusive)         1 600 000 000   
1 April 2013 to 31 March 2014 (inclusive)               1 800 000 000   
1 October 2013 to 30 September 2014 (inclusive)         2 000 000 000   
1 April 2014 to 31 March 2015 (inclusive)               3 000 000 000   
1 October 2014 to 30 September 2015 (inclusive)         4 000 000 000   
1 April 2015 to 31 March 2016 (inclusive)               4 000 000 000   
1 October 2015 to 30 September 2016 (inclusive)         4 000 000 000   


As at 31 March 2014, Lonmin had net cash of $71 million, comprising of cash and cash equivalents of $660 million and
borrowings of $589 million (31 March 2013 - net cash of $194 million and 30 September 2013 - net cash of $201 million).
The facilities were fully drawn at 31 March 2014 (undrawn facilities at 31 March 2013 amounted to $600 million and on
30 September 2013 they amounted to $598 million).

The Group’s principal non-financial assets (excluding inventories and deferred tax assets) are property, plant and equipment,
intangibles and goodwill associated with mining and processing activities. For the purpose of assessing impairment, these
assets are grouped into cash generating units (CGUs). The Group’s two key CGU’s are:

-   Marikana, which includes Western Platinum Limited (WPL) and Eastern Platinum Limited (EPL). The Marikana CGU
    mines and processes substantially all of the ore produced by the Group; and
-   Akanani Mining (Proprietary) Limited, an exploration and evaluation asset located on the Northern Limb of the Bushveld
    Complex in South Africa.

Goodwill and intangible assets with an indefinite useful life are tested for impairment annually regardless of whether an
indication of impairment exists.

Items of property, plant and equipment that are not in use are reviewed annually for impairment on a fair value less costs to
sell basis.

Under IFRS 6 exploration and evaluation assets are assessed for impairment when facts and circumstances suggest that the
carrying amount of the assets may exceed their recoverable amount.

At each financial reporting date, the Group assesses whether there is any indication that assets are impaired. If any such
indication exists, the recoverable amount of the assets is estimated. Recoverable amount is the higher of "fair value less
costs to sell" and "value in use". If the recoverable amount of an asset (or CGU) is estimated to be less than its carrying
amount, the carrying amount of the asset (or CGU) is reduced to its recoverable amount. Any impairment is recognised
immediately as an expense. Impairment losses within a CGU are allocated first to goodwill and then to reduce the carrying
amounts of other assets in the unit on a pro-rata basis.

Due to the weaker PGM price outlook and the possible impact of the ongoing strike, there is an indication that there may be
an impairment of the non-financial assets. Therefore the key CGU’s were tested for impairment as at 31 March 2014.

Fair value less costs to sell
Fair value less costs to sell is determined by reference to the best information available to reflect the amount that the Group
could receive for the CGU in an arm’s length transaction.

When comparable market transactions or public valuations of similar assets exist these are used as a source of evidence.
However, the Group believes that mining CGUs tend to be unique and have their value determined largely by the nature of
the underlying ore body. The fair value therefore is typically determined by calculating the value of the CGU using an
appropriate valuation methodology such as calculating the post-tax net present value using a discounted cash flow forecast
(as described in value in use).

Value in use
In assessing value in use, the estimated future cash flows, based on the most up to date business forecasts or studies for
exploration and evaluation assets, are discounted to their present value using a pre-tax discount rate that reflects current
market assessments of the time value of money and the risks specific to the assets for which estimates of future cash flows
have not been adjusted.

The key assumptions contained within the business forecasts or studies for exploration and evaluation assets, and
management’s approach to determine appropriate values are set out below:

Key Assumption                      Management Approach
PGM prices                          Projections are determined through a combination of the views of the Directors,
                                    market estimates and forecasts and other sector information. The Platinum price is
                                    projected to be in the range of $1,416 to $2,072 (September 2013: $1,600 to $2,100)
                                    per ounce in real terms over the life of the mines. Palladium and Rhodium prices are
                                    expected to range between $732 and $1,299 (September 2013: $750 to $1,200) and
                                    $1,045 and $1,570 (September 2013: $1,000 to $2,000) respectively per ounce in real
                                    terms over the same period.
Production volume                   Projections are based on the capacity and expected operational capabilities of the
                                    mines, the grade of the ore, and the efficiencies of processing and refining operations.
Production costs                    Projections are based on current costs adjusted for expected cost changes as well as
                                    giving consideration to specific issues such as the difficulty in mining particular
                                    sections of the reef and the mining method employed.
Capital expenditure requirements    Projections are based on the operational plan, which sets out the long-term plan of
                                    the business and is approved by the Board.
Foreign currency exchange rates     Spot rates as at the end of the reporting period are applied.
Reserves and resources of the CGU   Projections are determined through surveys performed by Competent Persons and
                                    the views of the Directors of the Company.

Management uses past experience and assessment of future conditions, together with external sources of information in
order to assign values to the key assumptions.

Management has projected cash flows over the life of the relevant mining operation which is significantly greater than 5 years.
For the Marikana CGU a life of mine spanning until 2056 was applied. For the Akanani CGU the life of mine spans until 2049.
Projecting cash flows over a period longer than 5 years is in line with industry practice and is supported by the Group’s history
of the resources expected to be found being proven to exist. Management does not apply a growth rate because a detailed
life of mine plan is used to forecast future production volumes.

For each CGU a risk-adjusted pre-tax discount rate is used for impairment testing. The key factors affecting the risk premium
applied are the relevant stage of the development of the asset in the CGU (extensions to existing operations having
significantly lower risk than evaluation projects for example), the level of knowledge and consistency of the ore body and
sovereign risk. The rate applied in the Marikana CGU for the 6 months to March 2014 was 11.8% pre-tax real (September
2013 – 11.8% real). The rate applied for the exploration and evaluation asset in the Akanani CGU for the 6 months to March
2014 was 15.4% pre-tax nominal (September 2013 – 14.8% nominal).

Marikana CGU
For the Marikana CGU the value in use calculated based on the assumptions above exceeded the unit’s carrying amount and
therefore no impairment is required at 31 March 2014. In preparing the financial statements, management has considered
whether a reasonably possible change in the key assumptions on which management has based its determination of the
recoverable amount of the Marikana CGU would cause the unit’s carrying amount to exceed its recoverable amount.
Management believe that a reasonably possible change in pricing and foreign exchange rate assumptions would lead to
impairment. The approximate effects on the carrying amount of the Marikana CGU of movements in three key assumptions
would be as follows:

                                                    Approximate impact on
Assumption               Movement in assumption           carrying amount

Metal prices                                -5%                  ($154 m)
ZAR:USD exchange rate                       -5%                   ($14 m)
Discount rates                +100 basis points                         -

Akanani CGU
The Akanani CGU is currently at prefeasibility study level and value in use calculations for the CGU are calculated using cash
flows derived from the results of the latest study. Given the Akanani CGU is at the exploration and evaluation stage it is
reasonably possible that the completion of that stage will result in changes to indicated and inferred reserves of PGM ounces
and a further refinement of capital and operating expenses. In addition the quantity of resources is also sensitive to the long-
term metal prices. Adverse changes in reserves and resources, capital and operating expenses, and long-term metal prices
might cause the recoverable amount to fall below the carrying amount of the CGU.

The Akanani CGU was impaired in 2012, and no further impairment is required at 31 March 2014. In preparing the financial
statements, management has considered whether a reasonably possible change in the key assumptions on which
management has based its determination of the recoverable amount of the Akanani CGU would impact the carrying amount.
Management believe that a reasonably possible change in any of the key assumptions would lead to impairment or reversal
of a previous impairment. The approximate effects on the carrying amount of the Akanani CGU of movements in three key
assumptions would be as follows:

                                                     Approximate impact on
Assumption              Movement in assumption             carrying amount

Metal prices                            +/- 5%             $35 m / ($34 m)
ZAR:USD exchange rate                   +/- 5%             $28 m / ($31 m)
Discount rate             +/- 100 basis points             ($58 m) / $73 m
 



Date: 12/05/2014 08:01:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.