Production Report for the fourth quarter ended 31 December 2013

Anglo American plc
Incorporated in the United Kingdom
(Registration number: 3564138)
Short name: Anglo
Share code: AGL
ISIN number: GB00B1XZS820
(the "Company")

Anglo American plc

Production Report for the fourth quarter ended 31 December 2013

Overview

•   Kumba Iron Ore production increased by 25% to 11.3 Mt following the strike in
    Q4 2012

•   Export metallurgical coal production increased by 3% to 4.7 Mt due to sustained
    longwall productivity improvements

•   Export thermal coal production increased by 8% to 7.9 Mt. Export thermal coal
    production from South Africa decreased by 1% to 4.6 Mt. Cerrejón production
    increased by 24% to 3.3 Mt, maintaining the strong recovery following the strike in
    Q1 2013

•   Copper production(1) increased by 24% to a record 214,400 tonnes, driven by
    continued strong performance at Los Bronces, and higher grades at Collahuasi

•   Nickel(2) production increased by 38% to 10,200 tonnes. Higher production at Barro
    Alto was driven by improved operational stability of the furnaces

•   Niobium production increased by 20% to 1,200 tonnes, reflecting operational
    improvements at the plants and higher grades

•   Fertiliser production increased 2% due to increased plant availability

•   Platinum equivalent refined production increased by 25% to 520,300 ounces as a
    result of an increase in production from Mogalakwena, and the normalisation of
    production at Rustenburg (Bathopele, Siphumelele and Thembelani), Amandelbult
    (Dishaba and Tumela) and Union mines that were impacted by the illegal industrial
    action in 2012
•       The restructuring of Platinum has commenced with baseline production of 2.2 - 2.4
        million ounces per annum, with 250,000 annualised low margin, high cost, and
        unprofitable ounces no longer in production

•       Diamond production increased by 13% to 9.1 million carats, primarily due to
        increased output from Jwaneng following the recovery after the slope failure in June
        2012, together with higher grades at Orapa and Venetia

The Production Report for the fourth quarter ended 31 December 2013 is
unaudited. Preliminary Results for the full year to 31 December 2013 will be announced
on 14 February 2014.
(1)       Copper production from the Copper business unit
(2)       Nickel production from the Nickel business unit

IRON ORE AND MANGANESE

                                                                    Q4 2013           Q4 2013                     FY 2013
                                                Q4           Q4                Q3                FY       FY
    Iron Ore and Manganese                                            vs.               vs.                         vs.
                                               2013         2012              2013              2013     2012
                                                                    Q4 2012           Q3 2013                     FY 2012
    Iron ore                      000 t       11,286        9,013      25%    9,475      19%    42,373   43,065     (2)%
    Manganese ore                 000 t          846          847       0%      788       8%     3,302    3,348     (1)%
    Manganese alloy               000 t           66           61       8%       55      21%       251      198      26%


Iron Ore – Production from Kumba Iron Ore increased by 25% to 11.3 Mt, owing to strike action
impacting production in Q4 2012.

Production at Sishen mine increased by 39% to 8.4 Mt as production recovered following the
impact of the unprotected strike in Q4 2012 and by 31% compared to the previous quarter owing
to the section 54 regulatory safety stoppages in August 2013. For the full year, production
decreased by 8% to 30.9 Mt. The Sishen pit remains constrained by waste material, which
reduces the availability of material supplied to the processing plants. A production recovery plan
to address the current pit constraints and a longer term operational optimisation strategy are
being implemented.

Production at Kolomela decreased marginally by 2% to 2.7 Mt, despite a five-day planned
maintenance stoppage in December. Production at Kolomela for the full year increased by 26%
to 10.8 Mt. Technical studies have confirmed the mine’s capacity to sustain production at 10
Mtpa for the life of mine, 1 Mtpa above its original design capacity.

Export sales volumes increased by 6% to 9.5 Mt, due to the strikes in 2012 impacting prior year
sales volumes. Finished product stockpile levels amounted to 2.8 Mt, a decrease of 24%.

Manganese Ore – Production was flat at 846,000 tonnes with improved performance at Hotazel
(South Africa) offsetting lower recoveries at GEMCO (Australia).

Manganese Alloy – Production increased by 8% to 66,200 tonnes due to the temporary
cessation of production at TEMCO in 2012.

METALLURGICAL COAL

                                                                    Q4 2013           Q4 2013                     FY 2013
                                               Q4            Q4                Q3                FY       FY
    Metallurgical Coal                                                vs.               vs.                         vs.
                                              2013          2012              2013              2013     2012
                                                                    Q4 2012           Q3 2013                     FY 2012

    Metallurgical – Export        000 t         4,733       4,580       3%    4,912     (4)%    18,656   17,664       6%
    Thermal – Export              000 t         1,585       1,689     (6)%    1,672     (5)%     6,264    6,046       4%
    Thermal – Domestic            000 t         1,689       2,025    (17)%    1,752     (4)%     6,239    6,925    (10)%



                                                                                                                            2
Metallurgical Coal – Export metallurgical coal production increased by 3% to 4.7 Mt, with a
record performance of 18.7 Mt for the full year. Full-year production records were achieved at
Moranbah and Foxleigh in Australia, and Peace River Coal in Canada.

Production at the underground operations increased by 5%, despite an additional planned
longwall move at Moranbah. Full year production increased by 30% to 7.3 Mt at the underground
operations following a significant improvement in longwall productivity over the past 18 months.

The strategic focus on premium priced products and underground operational improvements had
a favourable impact on the product mix, with the ratio of hard coking coal (HCC) to pulverised
coal injection (PCI) increasing by 3% to 70% in 2013.

Thermal coal production decreased as a result of the impact of floods in the first half of 2013,
most notably at Callide.




                                                                                              3
 THERMAL COAL

                                                     Q4 2013             Q4 2013                         FY 2013
                                  Q4        Q4                  Q3                    FY        FY
 Thermal Coal                                          vs.                 vs.                             vs.
                                 2013      2012                2013                  2013      2012
                                                     Q4 2012             Q3 2013                         FY 2012

South Africa
Thermal – Export     000 t       4,602     4,659      (1)%     4,505       2%        17,031    17,132     (1)%
Thermal – Domestic
(Eskom)              000 t       7,618     8,561      (11)%    9,053      (16)%      33,567    33,706       -
Thermal – Domestic
(Non-Eskom)          000 t       1,234     1,595      (23)%    1,665      (26)%      5,992     6,293      (5)%
Colombia
Thermal – Export     000 t       3,290     2,662      24%      3,185       3%        11,002    11,549     (5)%


Thermal Coal – Total export thermal coal production increased by 8% to 7.9 Mt.

Export production from South Africa decreased by 1% to 4.6 Mt. Domestic thermal coal
production for Eskom decreased by 11% to 7.6 Mt, due to wet weather interruptions, a longwall
stoppage at New Denmark and lower demand from Eskom from New Vaal. Other
domestic thermal coal production (non-Eskom) decreased by 23% to 1.2 Mt because of wet
weather interruptions at Isibonelo.

Cerrejón’s production increased by 24% to 3.3 Mt as production continued to ramp up,
recovering volumes lost as a result of the strike in Q1 2013.

COPPER

                                                     Q4 2013             Q4 2013                         FY 2013
                                   Q4        Q4                  Q3                     FY        FY
 Copper                                                vs.                 vs.                             vs.
                                  2013      2012                2013                   2013      2012
                                                     Q4 2012             Q3 2013                         FY 2012

 Copper                      t  214,400  172,900         24%  207,100         4%    774,700   659,700         17%


Copper – Copper production increased by 24% to a quarterly record of 214,400 tonnes.

Production at Los Bronces increased by 16% to 110,000 tonnes owing to continued strong
throughput performance. Reduced mine congestion and de-bottlenecking at the primary crushers
has improved continuity of ore supply and throughput at both processing plants. Improvements
implemented in the Confluencia milling and flotation processes have also resulted in higher
recoveries.

Production from Collahuasi doubled to 64,800 tonnes (attributable share). The significant
increase reflects the lower grades, a ball mill breakdown and SAG 3 mill underperformance in
2012. Following the SAG 3 stator motor replacement and repowering in Q2 2013, mill
throughput continues to increase, with performance for the quarter in line with expected capacity.
Production also benefited from higher than planned grades.

Production at El Soldado decreased by 17% to 12,600 tonnes, due to a lack of ore supply from
the mine. As previously advised, a major fault intersection has been encountered which has
impacted ore availability and the development of the next phase in the pit. The decrease in
production has been partially offset by the processing of slag from the nearby Chagres smelter
from October 2013.

At the end of 2013, Anglo American had 179,100 tonnes of copper provisionally priced at
326 c/lb. Provisional pricing of copper sales resulted in a negative operating profit adjustment of
$92 million for 2013, versus a positive operating profit adjustment of $47 million in the prior year.



                                                                                                                   4
NICKEL

                                                        Q4 2013               Q4 2013                            FY 2013
                                    Q4         Q4                     Q3                      FY         FY
 Nickel                                                   vs.                   vs.                                vs.
                                   2013       2012                   2013                    2013       2012
                                                        Q4 2012               Q3 2013                            FY 2012

 Nickel                     t     10,200       7,400       38%       9,500           7%     34,400     39,300      12%



Nickel – Production increased by 38% to 10,200 tonnes, reflecting progress at Barro Alto to
improve operational stability, despite the need for furnace rebuilds. Ore smelted averaged 82%
of nominal capacity during the quarter, compared to 49% in 2012. As previously announced, the
two Barro Alto furnaces are being rebuilt, the first starting in late 2014 and the second in late
2015. Design capacity is expected to be achieved in 2016.

Production at Codemin decreased by 2% as a result of a planned decline in grade.

NIOBIUM & PHOSPHATES

                                                     Q4 2013              Q4 2013                                FY 2013
                                 Q4         Q4                     Q3                      FY           FY
 Niobium & Phosphates                                  vs.                  vs.                                    vs.
                                2013       2012                   2013                    2013         2012
                                                     Q4 2012              Q3 2013                                FY 2012

 Niobium
 Production             t        1,200      1,000       20%       1,100        9%           4,500       4,400       2%

 Phosphates

 Concentrate            t   353,400       350,200        1%    355,000           -    1,406,300      1,357,100      4%

 Phosphoric Acid        t       78,000     82,100      (5)%     79,500        (2)%        317,100     299,800       6%

 Fertiliser             t   299,000       294,200        2%    326,300        (8)%    1,199,000      1,127,600      6%

 DCP                    t       38,700     38,200        1%     43,100       (10)%        159,600     150,000       6%


Niobium – Production increased by 20% due to operational improvements at Boa Vista mine
and its tailings plants and higher niobium pentoxide grade contained in phosphate mine tailings,
more than offsetting a decline in ore quality at the mine.

Phosphates – Fertiliser production increased by 2% due to increased plant availability, enabling
enhanced performance at the acidulation and granulation plants. Phosphoric acid production
decreased by 5% owing to the timing of the annual planned maintenance shutdown in Cubatão,
together with an unplanned maintenance stoppage in Catalão.




                                                                                                                       5
PLATINUM

                                                                           Q4 2013                      Q4 2013                                     FY 2013
                                                 Q4            Q4                            Q3                           FY             FY
 Platinum                                                                    vs.                          vs.                                         vs.
                                                2013          2012                          2013                         2013           2012
                                                                           Q4 2012                      Q3 2013                                     FY 2012
 Refined
 Platinum                        000 oz            692            704          (2)%             666            4%          2,380         2,379                 -
 Palladium                       000 oz            428            413             4%            369          16%           1,381         1,396           (1)%
 Rhodium                         000 oz              84             91         (8)%              85          (2)%            295            311          (5)%
 Copper(1) - Refined                     t       1,800          2,500         (28)%          2,600         (31)%           8,300        11,400          (27)%
 Copper(1) - Matte                       t       1,400                -              -          300         367%           5,800                -              -
 Nickel(1) - Refined                     t       5,200          3,900           33%          4,900             6%        16,800         17,700           (5)%
 Nickel(1) - Matte                       t         100                -              -          300          67%           5,800                -              -
 Gold                            000 oz              27             19          44%              34        (21)%             100            105          (5)%
 Equivalent(2)
 Platinum                        000 oz            520            416           25%             623        (16)%           2,320         2,219             5%

 (1)    Nickel and copper refined through third parties is shown as production of nickel matte and copper matte. Nickel and copper matte, per the table, reflects
        matte sold to a third party in Q4 2013 from 2012 and 2013 production stockpile
 (2)    Equivalent refined is the mines’ production and purchases of metal in concentrate, secondary metals and other metals converted to equivalent refined
        production using Anglo American Platinum Limited’s standard smelting and refining recoveries


Platinum – Equivalent refined platinum production increased by 25% to 520,300 ounces.
Production from own operations and the Western Limb Tailings Retreatment was 311,000
ounces, a 35% increase compared to 2012, mainly attributable to the illegal industrial action that
impacted Q4 2012. Production from joint ventures and associates, including both own mine and
purchased production, increased by 14% to 197,700 ounces.

Mogalakwena’s production increased by 24% as a result of higher throughput at the concentrator
and higher recoveries. In addition, material was processed on a toll basis in 2013 at a 3rd party
concentrator.

Rustenburg, Amandelbult and Union increased production in aggregate by 38% as they
recovered from the effect of illegal industrial action in Q4 2012. Further industrial action was
experienced at several Platinum operations in Q4 2013 (between 27 September 2013 and 10
October 2013); approximately 44,000 ounces of platinum production were lost as a result.

Production at Rustenburg decreased by 41% as a result of Khomanani mine, and Khuseleka 2
shaft having been put into long term care and maintenance since August 2013, in line with the
proposed restructuring plans. The resources from these mines have now been integrated into the
surrounding operations.

Production at the Tumela and Dishaba mines was adversely affected by shortages of production
crews and supervisors, resulting from the extended Section 189 restructuring process. The
redeployment of labour programme has been concluded and productivity improvements are
expected in 2014.

Refined platinum production was marginally lower at 692,100 ounces, with total production for
the year at 2.4 million ounces.

Palladium, Rhodium and Nickel – Refined production of palladium increased by 4% and
rhodium decreased by 8% as a result of a different source mix from operations as well as
different pipeline processing times for each metal. Nickel production saw a 33% increase as plant
capacity increased following the resolution of technical challenges in the new nickel tank house
and as ramp up continues.




                                                                                                                                                                6
DIAMONDS

                                              Q4 2013           Q4 2013                     FY 2013
                               Q4      Q4                Q3                FY       FY
 Diamonds                                       vs.               vs.                         vs.
                              2013    2012              2013              2013     2012
                                              Q4 2012           Q3 2013                     FY 2012

 Diamonds        000 carats   9,132   8,051     13%     7,732      18%    31,159   27,875      12%


Diamonds – Production increased by 13% to 9.1 million carats, mainly attributable to the
Debswana operations, with Jwaneng increasing production following the slope failure in 2012,
and higher grades at Orapa. Production also increased in South Africa and Canada, on account
of improved grades at Venetia and Snap Lake.

Production at Debswana increased by 17% compared to Q3 2013 with the return to operation of
the Orapa One plant following unplanned maintenance in Q3. Production at Venetia improved
significantly, up 57% on Q3, on account of higher volumes and grades following the recovery
from pit flooding earlier in the year. The Canadian operations also showed increased production
over Q3 2013, largely due to improved throughput and higher grade at Snap Lake.




EXPLORATION AND EVALUATION

Exploration and evaluation expenditure for Q4 2013 totalled $166 million, a decrease of 19%.
Total expenditure in 2013 totalled $533 million, a decrease of 27%.

Exploration expenditure in Q4 2013 was $63 million, a decrease of $7 million as a result of
reductions across most of the portfolio including, metallurgical coal, diamonds and iron ore. Total
expenditure in 2013 totalled $207 million, in line with 2012.

Evaluation expenditure for the quarter was $103 million, a decrease of 23%, driven by reductions
in copper and nickel and partially offset by increases in iron ore. Total expenditure in 2013 was
$326 million, a decrease of 38% driven by reductions in copper and nickel partially offset by an
increase in De Beers following the acquisition of additional interest in 2012.




                                                                                                  7
PRODUCTION SUMMARY
The figures below include the entire output of consolidated entities and the Group’s attributable
share of joint ventures, joint arrangements and associates where applicable, except for
Collahuasi in the Copper segment and De Beers’ joint ventures which are quoted on a 100%
basis.

                                                                                         Q4 2013       Q4 2013                            2013
                                                                                           vs.           vs.                               vs.
 Iron Ore (tonnes)           Q4 2013     Q3 2013     Q2 2013     Q1 2013     Q4 2012     Q3 2013       Q4 2012     2013        2012       2012
   Lump                      6,825,200   5,614,100   6,866,400   6,190,300   5,551,000       22%           23% 25,496,000 26,580,500        (4)%
   Fines                     4,460,500   3,860,500   4,411,400   4,144,700   3,461,500       16%           29% 16,877,100 16,484,600         2%
 Total Kumba
 production                 11,285,700   9,474,600 11,277,800 10,335,000     9,012,500       19%           25% 42,373,100 43,065,100        (2)%
   Sishen                    8,395,000   6,429,100   8,562,100   7,552,300   6,037,800       31%           39% 30,938,500 33,696,700        (8)%
   Kolomela                  2,739,500   2,806100    2,583,600   2,679,500   2,792,700       (2)%          (2)% 10,808,700    8,544,900     26%
   Thabazimbi                 151,200     239,400     132,100     103,200     182,000       (37)%         (17)%    625,900     823,500     (24)%
 Total Kumba
 production                 11,285,700   9,474,600 11,277,800 10,335,000     9,012,500       19%           25% 42,373,100 43,065,100        (2)%
 Kumba sales volumes
   RSA export iron ore       9,530,200   9,422,400 10,178,300    9,945,100   8,979,600        1%            6% 39,076,000 39,657,000        (1)%
   RSA domestic iron ore     1,305,700   1,312,200   1,131,500    882,000     833,100              -       57%    4,631,400   4,683,000     (1)%
 Samancor
   Manganese ore(1)           846,000     788,100     864,200     803,400     846,800         8%            0%    3,301,700   3,347,800     (1)%
   Manganese alloys(1)(2)      66,200      54,800      72,800      57,300      61,200        21%            8%     251,100     198,400      26%
 Samancor sales
 volumes
   Manganese ore              837,900     766,100     793,800     864,300     714,800         9%           17%    3,262,100   3,212,400      1%
   Manganese alloys            60,400      56,800      68,400      63,100      65,600         6%           (8)%    248,700     236,000       5%




                                                                                                                                                 8
                                                                                         Q4 2013       Q4 2013                                 2013
Metallurgical Coal                                                                         vs.           vs.                                    vs.
segment tonnes         Q4 2013     Q3 2013     Q2 2013       Q1 2013       Q4 2012       Q3 2013       Q4 2012        2013         2012        2012
Australia
  Metallurgical -
  Export coking coal   3,133,900   3,053,000   2,663,400     2,861,300     3,020,700          3%            4% 11,711,600 10,484,700             12%
  Metallurgical -
  Export PCI           1,241,900   1,444,700   1,283,800     1,289,800     1,193,000        (14)%           4%       5,260,200    5,802,700      (9)%
  Thermal -Export      1,584,700   1,672,400   1,513,100     1,493,800     1,689,400         (5)%          (6)%      6,264,000    6,045,900       4%
  Thermal -Domestic    1,688,800   1,752,300   1,725,300     1,073,000     2,025,300         (4)%         (17)%      6,239,400    6,924,600     (10)%
Total Australian
Metallurgical Coal
segment coal
production             7,649,300   7,922,400   7,185,600     6,717,900     7,928,400         (3)%          (4)% 29,475,200 29,257,900             1%
Canada
  Metallurgical –
  Export coking coal    339,300     412,500     448,500       463,500       366,300         (18)%          (7)%      1,663,800    1,376,900      21%
  Metallurgical -
  Export PCI             18,300       1,700              -             -             -             -             -     20,000              -          -
Total Metallurgical
Coal segment coal
production             8,006,900   8,336,600   7,634,100     7,181,400     8,294,700         (4)%          (3)% 31,159,000 30,634,800             2%
Australia
  Callide              1,688,800   1,752,300   1,725,300     1,151,400     2,148,800         (4)%         (21)%      6,317,800    7,464,000     (15)%
  Capcoal              1,578,800   1,606,000   1,461,100     1,415,500     1,387,200         (2)%          14%       6,061,400    6,022,400       1%
  Dawson               1,162,700    993,300    1,077,100      752,600      1,190,100         17%           (2)%      3,985,700    4,593,500     (13)%
  Drayton               976,400    1,055,900    785,000       893,400       955,200          (8)%           2%       3,710,700    3,663,300       1%
  Foxleigh              421,900     541,000     475,700       528,000       470,200         (22)%         (10)%      1,966,600    1,896,000       4%
  Jellinbah             755,900     673,400     610,000       477,200       584,900          12%           29%       2,516,500    2,073,200      21%
  Moranbah North       1,064,800   1,300,500   1,051,400     1,499,800     1,192,000        (18)%         (11)%      4,916,500    3,545,500      39%
Total Australian
Metallurgical
Segment coal
production             7,649,300   7,922,400   7,185,600     6,717,900     7,928,400         (3)%          (4)% 29,475,200 29,257,900             1%
Canada
  Peace River Coal      357,600     414,200     448,500       463,500       366,300         (14)%          (2)%      1,683,800    1,376,900      22%
Total Metallurgical
Coal segment coal
production             8,006,900   8,336,600   7,634,100     7,181,400     8,294,700         (4)%          (3)% 31,159,000 30,634,800             2%
Weighted average
achieved FOB prices
  Metallurgical –
  Export(3) US$/t           133         129         153           148           146           3%           (9)%           140          178      (21)%
  Thermal – Export
  US$/t                      78          82          84            90            83          (5)%          (6)%              84           96    (13)%
  Thermal – Domestic
  US$/t                      40          39          40            37            37           3%            8%               39           37      5%
  Sales volumes
  Metallurgical -
  Export(4)            5,182,200   4,859,000   4,667,100     4,336,200     4,714,000          7%           10% 19,044,500 17,413,000              9%
  Thermal – Export     1,881,800   1,477,900   1,505,300     1,506,600     1,518,800         27%           24%       6,371,600    6,042,600       5%
  Thermal – Domestic   1,632,000   1,684,300   1,700,000     1,109,100     1,920,800         (3)%         (15)%      6,125,400    6,920,900     (11)%




                                                                                                                                                      9
                                                                                             Q4 2013       Q4 2013                                   2013
Thermal Coal segment                                                                           vs.           vs.                                      vs.
tonnes                 Q4 2013       Q3 2013       Q2 2013       Q1 2013       Q4 2012       Q3 2013       Q4 2012         2013          2012        2012
South Africa
 Thermal – Export       4,602,000     4,504,900     4,015,200     3,909,200     4,659,100         2%           (1)%      17,031,300    17,132,100      (1)%
 Thermal – Domestic
 Eskom                  7,617,800     9,053,200     8,766,600     8,129,800     8,560,600       (16)%         (11)%      33,567,400    33,706,400           -
 Thermal – Domestic
 other                  1,234,100     1,665,300     1,573,800     1,518,800     1,594,500       (26)%         (23)%       5,992,000     6,219,100      (4)%
 Metallurgical –
 Domestic                        -             -             -             -             -             -             -             -      74,100     (100)%
Total South African
Thermal Coal coal
production             13,453,900    15,223,400    14,355,600    13,557,800    14,814,200       (12)%          (9)%      56,590,700    57,131,700      (1)%
Colombia
  Thermal – Export      3,290,300     3,184,900     3,014,300     1,512,000     2,661,700         3%           24%       11,001,500    11,548,800      (5)%
Total Thermal Coal
segment coal
production             16,744,200    18,408,300    17,369,900    15,069,800    17,475,900        (9)%          (4)%      67,592,200    68,680,500      (2)%
South Africa
  Goedehoop             1,228,300     1,194,600     1,143,200     1,114,700     1,230,100         3%                 -    4,680,800     4,859,900      (4)%
  Greenside              923,700       862,800       792,500       690,500       909,500          7%            2%        3,269,500     2,883,200      13%
  Isibonelo             1,139,700     1,421,700     1,259,500     1,245,900     1,316,000       (20)%         (13)%       5,066,800     5,399,200      (6)%
  Kleinkopje             935,600      1,106,900      973,800       980,900       950,000        (15)%          (2)%       3,997,200     3,765,500       6%
  Kriel                 1,962,500     2,189,900     2,056,200     1,894,100     2,068,200       (10)%          (5)%       8,102,700     8,096,900           -
  Landau                1,079,800     1,065,800      939,100       999,300      1,122,000         1%           (4)%       4,084,000     4,272,300      (4)%
  Mafube                 416,200       475,400       437,000       496,800       489,500        (12)%         (15)%       1,825,400     1,804,100       1%
  New Denmark            569,200       817,100      1,203,700      996,900       903,200        (30)%         (37)%       3,586,900     3,401,200       5%
  New Vaal              3,905,200     4,797,300     4,321,200     4,082,000     4,460,100       (19)%         (12)%      17,105,700    17,623,300      (3)%
  Zibulo                1,293,700     1,291,900     1,229,400     1,056,700     1,365,600            -         (5)%       4,871,700     5,026,100      (3)%

Total South African    13,453,900    15,223,400    14,355,600    13,557,800    14,814,200       (12)%          (9)%      56,590,700    57,131,700      (1)%
Thermal Coal coal
production
Colombia
  Carbones del          3,290,300     3,184,900     3,014,300     1,512,000     2,661,700         3%           24%       11,001,500    11,548,800      (5)%
  Cerrejón
Total Thermal Coal     16,744,200    18,408,300    17,369,900    15,069,800    17,475,900        (9)%          (4)%      67,592,200    68,680,500      (2)%
segment coal
production
Weighted average
achieved FOB prices
South Africa
  Thermal – Export            76            74            76            83            84          3%          (10)%               77            92    (16)%
  US$/t
  Thermal – Domestic          21            18            19            20            21         17%                 -            19            21    (10)%
  US$/t
Colombia
  Thermal – Export            72            70            75            77            84          3%          (14)%               73            89    (18)%
  US$/t
Sales volumes
South Africa
  Thermal - Export      4,660,200     4,877,600     4,049,100     3,914,900     4,511,000        (4)%           3%       17,501,800    17,150,600       2%
  Thermal - Domestic    8,805,800    10,429,100    10,243,400     9,565,800    10,192,500       (16)%         (14)%      39,044,100    40,018,000      (2)%
Colombia
  Thermal - Export      3,067,100     3,154,800     3,157,100     1,773,500     2,701,700        (3)%          14%       11,152,500    10,925,600       2%
Total Thermal Coal     16,533,100    18,461,500    17,449,600    15,254,200    17,405,200       (10)%          (5)%      67,698,400    68,094,200      (1)%
Sales




                                                                                                                                                       10
                                                                                                  Q4 2013       Q4 2013                                 2013
Copper segment tonnes
                                                                                                    vs.           vs.                                    vs.
unless stated otherwise(5)
                                Q4 2013       Q3 2013        Q2 2013     Q1 2013      Q4 2012     Q3 2013       Q4 2012         2013         2012       2012
Collahuasi 100% basis
(Anglo American share 44%)
  Ore mined                    23,120,000 19,421,500        19,526,000 18,888,000    28,348,800       19%          (18%) 80,955,500        74,647,600     9%
  Ore processed - Oxide         1,481,600     1,594,100      2,024,300   1,928,800    1,972,300       (7%)         (25%)       7,028,900    8,081,400   (13%)
  Ore processed - Sulphide     14,019,700 13,467,600         9,972,800 10,098,900    10,791,000        4%           30% 47,559,000         43,618,600     9%
  Ore grade process - Oxide
                                     0.71          0.75           0.89        0.86         0.86       (4%)         (17%)            0.81         0.88    (7%)
  (% ASCu)(6)
  Ore grade process -
                                     1.23          1.21           1.00        0.75         0.74        1%           66%             1.07         0.76    42%
  Sulphide (% TCu)(7)
  Production - Copper
                                   5,500         6,900          8,400       7,700        9,400       (20%)         (42%)         28,400       36,800    (23%)
  cathode
  Production - Copper in
                                 141,700       137,800         77,400      59,200       64,400         3%          120%         416,100      245,300     70%
  concentrate
Total copper production for
                                 147,100       144,700         85,800      66,900       73,800         2%          100%         444,500      282,100     58%
Collahuasi(6)
AA’s share of production for
                                  64,900        63,600         37,700      29,400       32,500         2%           99%         195,600      124,100     58%
Collahuasi(6)
Anglo American Sur
  Los Bronces mine(8)
  Ore mined                    14,502,400 13,243,600        14,991,700 14,200,500    13,057,900       10%           11% 56,938,200         49,766,500    14%
  Marginal ore mined            5,261,100     3,903,800      4,551,100   3,505,300    5,192,300       35%            1% 17,221,300         17,854,200    (4%)
  Ore processed                12,940,500 13,168,200        12,960,600 12,891,300    12,107,800       (2%)           7% 51,960,500         45,854,800    13%
  Ore grade processed
                                     0.87          0.83           0.81        0.80         0.84        4%            4%             0.83         0.84    (1%)
  Sulphide (% TCu)
  Production - Copper
                                   9,900         8,600          9,300      10,000        9,100        15%            9%          37,800       40,700     (7%)
  cathode
  Production - Copper in
                                          -             -         200         400          500              -             -         600        2,500    (76%)
  sulphate
  Production - Copper in
                                 100,000        97,900         92,200      88,000       85,500         2%           17%         378,000      322,000     17%
  concentrate
  Production total               109,900       106,400        101,700      98,300       95,100         3%           16%         416,300      365,200     14%
  El Soldado mine(8)
  Ore mined                     2,001,200     1,910,600      2,439,800   2,225,100    2,620,700        5%          (24%)       8,576,700    8,544,500          -
  Ore processed Sulphide        1,852,400     1,730,200      1,870,600   1,859,200    1,928,200        7%           (4%)       7,312,500    7,782,300    (6%)
  Ore grade processed
                                     0.90          0.65           0.91        1.03         0.94       39%           (5%)            0.88         0.83     5%
  Sulphide (% TCu)
  Production Copper cathode          300           200            300         400          400        50%          (25%)          1,200        2,000    (40%)
  Production Copper in
                                  12,300         9,200         13,600      15,200       14,800        34%          (17%)         50,400       51,900     (3%)
  concentrate
  Production total                12,600         9,400         13,900      15,600       15,200        34%          (17%)         51,500       53,900     (5%)
  Chagres Smelter(8)
  Ore smelted                     39,900        38,100         35,800      36,000       29,300         5%           36%         149,800      142,900      5%
  Production                      38,700        36,800         34,900      34,800       28,400         5%           36%         145,200      138,700      5%
Total copper production for      122,500       115,800        115,600     113,900      110,300         6%           11%         467,800      419,100     12%
Anglo American Sur
Anglo American Norte
  Mantos Blancos mine
  Ore processed Sulphide        1,099,500     1,073,300      1,059,400   1,097,400    1,147,400        2%           (4%)       4,329,600    4,393,200    (1%)
  Ore grade processed
                                     0.69          0.69           0.69        0.54         0.59             -       18%             0.65         0.64     2%
  Sulphide (% ICu)(9)
  Production Copper cathode        6,700         7,500          8,000       7,300        7,700       (11%)         (13%)         29,500       29,200      1%
  Production Copper in
                                   6,700         6,100          7,200       5,100        6,200        10%            8%          25,100       25,100           -
  concentrate
  Production total                13,500        13,500         15,200      12,400       13,900        (1%)          (4%)         54,600       54,200      1%
  Mantoverde mine
  Ore processed Oxide           2,473,500     2,708,500      2,544,800   2,658,500    2,670,000       (9%)          (7%)      10,385,200   10,460,400    (1%)
  Ore processed Marginal ore    1,729,100     2,179,000      2,235,800   2,136,400    2,902,300      (21%)         (40%)       8,280,400    8,671,700    (5%)
  Ore grade processed Oxide
                                     0.52          0.55           0.58        0.61         0.63       (6%)         (18%)            0.57         0.63   (11%)
  (% ASCu ) (10)
  Ore grade processed
                                     0.23          0.24           0.26        0.26         0.25       (6%)          (9%)            0.25         0.25    (1%)
  Marginal ore (% ASCu )
  Production Copper cathode       13,600        14,100         14,400      14,700       16,200        (4%)         (16%)         56,800       62,200     (9%)
Total copper production for
                                  27,000        27,600         29,600      27,100       30,100        (2%)         (10%)        111,300      116,500     (5%)
Anglo American Norte
Total Copper segment
                                 296,800       288,100        230,900     207,900      214,200         3%           39%        1,023,700     817,700     25%
copper production
Attributable copper
                                 214,400       207,100        182,900     170,400      172,900         4%           24%         774,700      659,700     17%
production(11)
Attributable sales volumes       214,500       216,700        176,700     160,300      177,900        (1%)          21%         768,200      643,600     19%




                                                                                                                                                        11
                                                                                                               Q4 2013           Q4 2013                                         2013
Nickel segment tonnes                                                                                            vs.               vs.                                            vs.
unless stated otherwise          Q4 2013       Q3 2013       Q2 2013       Q1 2013           Q4 2012           Q3 2013           Q4 2012            2013         2012            2012
Barro Alto
  Ore mined                       321,300       885,200       510,300       282,200           238,500             (64)%              35%           1,999,000    1,844,400          8%
  Ore processed                   487,800       444,400       412,700       271,400           310,800              10%               57%           1,616,300    1,422,100         14%
  Ore grade processed %Ni            1.82          1.87          1.74          1.84              1.87              (3)%              (3)%               1.82         1.94         (6)%
  Production                        7,800         7,100         6,100         4,100             4,900              10%               59%             25,100       21,600          16%
Codemin
  Ore mined                                -             -      6,800                -                 -                 -                 -          6,800              -              -
  Ore processed                   151,700       157,000       157,900       135,800           154,200              (3)%              (2)%           602,400      581,100           4%
  Ore grade processed %Ni            1.72          1.70          1.68          1.72              1.80               1%               (4)%               1.71         1.81         (6)%
  Production                        2,400         2,400         2,400         2,100             2,500                    -           (4)%             9,300        9,600          (3)%
Loma de Níquel
  Ore mined                                -             -             -             -                 -                 -                 -                -    432,900                -
  Ore processed                            -             -             -             -                 -                 -                 -                -    767,400                -
  Ore grade processed %Ni                  -             -             -             -                 -                 -                 -                -        1.40               -
  Production                               -             -             -             -                 -                 -                 -                -      8,100                -
Total Nickel segment nickel        10,200         9,500         8,500         6,200             7,400               7%               38%             34,400       39,300         (12)%
production(12)
Sales volumes                      11,200         9,200         6,300         7,100             9,000              22%               24%             33,800       40,000         (16)%


Niobium and Phosphates                                                                                         Q4 2013           Q4 2013                                         2013
segment tonnes unless                                                                                            vs.               vs.                                            vs.
otherwise stated                 Q4 2013       Q3 2013       Q2 2013       Q1 2013           Q4 2012           Q3 2013           Q4 2012             2013         2012           2012
Niobium (Catalão)
   Ore mined                       457,128       407,528       314,497        49,656           252,933             12%               81%           1,228,809      933,203          32%
   Ore processed                   224,391       239,924       249,666       249,137           246,252             (6)%              (9)%            963,118      973,484          (1)%
   Ore grade processed                1.16          1.19          1.11          1.22              1.27             (3)%              (9)%               1.16         1.21          (4)%
   Production                        1,160         1,129         1,125         1,068             1,038              3%               12%               4,482        4,439           1%
 Phosphates (Copebrás)
   Concentrate                     353,400       355,000       349,900       348,000           350,200                       -        1%           1,406,300    1,357,100           4%
   Phosphoric acid                  78,000        79,500        82,144        77,509            82,100             (2)%              (5)%            317,153      299,800           6%
   Fertiliser(13)                  299,000       326,300       300,500       273,200           294,200             (8)%               2%           1,199,000    1,127,600           6%
   DCP                              38,700        43,100        39,500        38,300            38,200            (10)%               1%             159,600      150,000           6%


                                                                                                               Q4 2013           Q4 2013                                         2013
                                                                                                                 vs.               vs.                                            vs.
Platinum segment                 Q4 2013       Q3 2013       Q2 2013       Q1 2013           Q4 2012           Q3 2013           Q4 2012             2013         2012           2012
Refined production
   Platinum (troy oz)             692,100        666,400       581,800       439,200           703,800               4%              (2)%           2,379,500    2,378,600                  -
   Palladium (troy oz)            428,200        369,300       319,700       263,600           413,300              16%                4%           1,380,800    1,395,900         (1)%
   Rhodium (troy oz)                83,500        84,900        69,800        56,500            91,200             (2)%              (8)%            294,700      310,700          (5)%
   Copper refined (tonnes)(14)       1,800         2,600         1,900         2,000             2,500            (31)%             (28)%              8,300       11,400         (27%)
   Copper matte (tonnes)(14)         1,400          300          4,100                   -                 -       367%                        -       5,800                 -              -
   Nickel refined (tonnes)(14)       5,200         4,900         3,400         3,300             3,900               6%               33%             16,800       17,700          (5)%
   Nickel matte (tonnes)(14)          100           300          5,400                   -                 -      (67%)                        -       5,800                 -              -
   Gold (troy oz)                   26,700        33,700        16,300        23,300            18,600            (21)%               44%            100,000      105,200          (5)%
Equivalent refined
Platinum (troy oz)                520,300        622,600       594,500       583,000           416,000            (16)%               25%           2,320,400    2,219,100          5%
4E built-up head grade
(g/tonne milled)(15)                  3.19          3.36          3.24          3.22              3.22             (5)%              (1)%                3.26         3.20          2%


                                                                                                               Q4 2013           Q4 2013                                         2013
                                                                                                                 vs.               vs.                                            vs.
Diamonds segment                 Q4 2013       Q3 2013       Q2 2013       Q1 2013           Q4 2012           Q3 2013           Q4 2012             2013         2012           2012
Carats recovered
100% basis
   Debswana                      6,357,000     5,446,000     6,369,000     4,535,000         5,537,000              17%               15% 22,707,000 20,216,000                    12%
   Namdeb Holdings                465,000        445,000       423,000       429,000           470,000               4%              (1)%          1,762,000    1,667,000           6%
   De Beers Consolidated
   Mines                         1,728,000     1,355,000       639,000     1,002,000         1,547,000              28%               12%          4,724,000    4,432,000           7%
   De Beers Canada                582,000        486,000       500,000       398,000           497,000              20%               17%          1,966,000    1,560,000          26%
Total carats recovered           9,132,000     7,732,000     7,931,000     6,364,000         8,051,000              18%               13% 31,159,000 27,875,000                    12%




                                                                                                                                                                                  12
(1)    Saleable production
(2)    Production includes medium carbon ferro-manganese
(3)    Within export coking and export PCI coals there are different grades of coal with different weighted average prices compared to benchmark
(4)    Includes both hard coking coal and PCI sales volumes
(5)    Excludes Anglo American Platinum’s copper production
(6)    ASCu = acid soluble copper
(7)    TCu = total copper
(8)    Anglo American’s share of Collahuasi production is 44%
(9)    Anglo American previously held 74.5% of Anglo American Sur; as from 24 August 2012, it held 50.1%. Production is stated at 100% as Anglo American
       continues to consolidate Anglo American Sur
(10)   ICu = insoluble copper (total copper less acid soluble copper)
(11)   Difference between total copper production and attributable copper production arises from Anglo American’s 44% interest in Collahuasi
(12)   Excludes Anglo American Platinum’s nickel production
(13)   2012 fertiliser production restated to reflect the change in production quantification methodology in the acidulation plant at Cubatão
(14)   Nickel and copper refined through third parties is now shown as production of nickel matte and copper matte. Nickel and copper matte, per the table,
       reflect matte sold to a third party in Q4 2013 from 2012 and 2013 production stockpiles
(15)   Equivalent refined is the mines’ production and purchases of metal in concentrate, secondary metals and other metals converted to equivalent refined
       production using Anglo American Platinum Limited’s standard smelting and refining recoveries
(16)   4E: the grade measured as the combined content of the four most valuable precious metals: platinum, palladium, rhodium and gold.



Note: Production figures are sometimes more precise than the rounded numbers shown in the
commentary of this report. The percentage change reflects the percentage change using the
production figures shown in the Production Summary of this report.

Forward-looking statements: This release contains certain forward looking statements which
involve risk and uncertainty because they relate to events and depend on circumstances that
occur in the future. There are a number of factors that could cause actual results or
developments to differ materially from those expressed or implied by these forward looking
statements.

29 January 2014
Sponsor: UBS South Africa (Pty) Ltd

For further information, please contact:

  Media                                                                                          Investors
  UK                                                                                             UK
  James Wyatt-Tilby                                                                              Paul Galloway
  Tel: +44 (0)20 7968 8759                                                                       Tel: +44 (0)20 7968 8718

  Emily Blyth                                                                                    Caroline Crampton
  Tel: +44 (0)20 7968 8481                                                                       Tel: +44 (0)20 7968 2192

  South Africa                                                                                   Sarah McNally
  Pranill Ramchander                                                                             Tel: +44 (0)20 7968 8747
  Tel: +27 (0)11 638 2592

  Notes to editors:
  Anglo American is one of the world’s largest mining companies, is headquartered in the UK and
  listed on the London and Johannesburg stock exchanges. Our portfolio of mining businesses
  meets our customers’ changing needs and spans bulk commodities – iron ore and manganese,
  metallurgical coal and thermal coal; base metals and minerals – copper, nickel, niobium and
  phosphates; and precious metals and minerals – in which we are a global leader in both
  platinum and diamonds. At Anglo American, we are committed to working together with our
  stakeholders – our investors, our partners and our employees – to create sustainable value that
  makes a real difference, while upholding the highest standards of safety and responsibility
  across all our businesses and geographies. The company’s mining operations, pipeline of
  growth projects and exploration activities span southern Africa, South America, Australia, North
  America, Asia and Europe.
  www.angloamerican.com


                                                                                                                                                      13
14

Date: 29/01/2014 09:13:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.