To view the PDF file, sign up for a MySharenet subscription.

FIRESTONE ENERGY LIMITED - Independent Competent Persons Resource Statement - October 2013

Release Date: 24/10/2013 07:55
Code(s): FSE FSEO1     PDF:  
Wrap Text
Independent Competent Persons Resource Statement - October 2013

FIRESTONE ENERGY LIMITED                                                                     About Firestone Energy
(Incorporated in Australia)
(Registration number ABN 058 436 794)                                                        Firestone Energy Limited is an
Share code on the JSE Limited: FSE                                                           independent, Australian exploration and
                                                                                             development company listed on the
Share code on the ASX: FSE
                                                                                             Australian Stock Exchange Ltd (ASX) and
ISIN: AU000000FSE6
                                                                                             the Johannesburg Stock Exchange (JSE).
(SA company registration number 2008/023973/10)                                              Firestone Energy has entered into a Joint
                                                                                             Venture with Sekoko Resources (Pty) Ltd
("FSE" or "the Company"                                                                      through which Firestone Energy has
                                                                                             acquired the right to 60% participation
24 October 2013
                                                                                             interests in the Waterberg Coal Project
                                                                                             located in Lephalale area, Limpopo Province,
Independent Competent Persons Resource Statement -                                           South Africa.

October 2013                                                                                 The first stage of the project is to develop the
                                                                                             Smitspan mine which has a substantial
As previously advised to the market, The Waterberg Coal Joint Venture Partners               measured thermal coal resource and to
commissioned a definitive feasibility study (DFS) in June 2012 for the proposed              develop the Vetleegte mine which is a
development of The Waterberg Coal Project predicated on the then insitu coal resource        substantial metallurgical coal deposit.
and the Memorandum of Understanding (MOU) entered into with Eskom for an off-take
of 10 million tonnes per annum (mtpa).                                                       Firestone Energy is committed to becoming a
                                                                                             profitable independent coal and energy
Firestone Energy Limited (FSE) is pleased to report the results of the updated Resource      producer at its projects in South Africa,
Statement for the Waterberg Coal Project Properties, prepared on behalf of the               thereby making a substantial contribution to
                                                                        1
Waterberg Coal Project Joint Venture Partners by Gemecs (Pty) Limited in their capacity      the social and economic development of the
as Independent Competent Persons.                                                            Lephalale area and South Africa.

The updated Resource Statement reflects the considerably increased borehole database         Corporate Details
following the completion of the 2013 drilling program and associated sample analysis on                                           ASX: FSE
                                                                                                                                  JSE: FSE
the Waterberg Coal Project Properties.
                                                                                                                             Issued Capital:
The Resource Statement covers the properties of the four farms under Mining Right in the                      3,549 million ordinary shares
Waterberg (Smitspan, Massenberg, Hooikraal and Minnasvlakte), and the two farms held
                                                                                                                    Major Shareholders:
under Prospecting Permit (Vetleegte and Swanepoelpan).                                                  The Waterberg Coal Company Ltd

1.   The Coal Resource for the four farms held under the Mining Right is 3.149 billion                             Directors and Officers
     tonnes, of which 2.053 billion tonnes is a Measured Resource, 575.6 million tonnes is
                                                                                                                Non Executive Directors:
     Indicated, and 519.5 million tonnes is Inferred (Table 1).                                                   Tim Tebeila (Chairman)
                                                                                                                          Dr Pius Kasolo
                                                                                                                         Ben Mphahlele
 Table 1 – Coal Resource on the four Waterberg Coal Project Properties held under                                        Brian McMaster
 Mining Right                                                                                                                 David Knox
                     Coal       Ash %     IM %       Vol %    CV (Mj/kg)    TS %                                              Officers:
     Resource
                  Resource ¹     (ad)      (ad)       (ad)       (ad)       (ad)                    Mr Stephen Miller CEO and Executive
 Classification
                    (Mt)                                                                                                       Director
    Measured           2053.9      57.9       2.2        17.6       10.49     0.96                            Ms Amanda Matthee CFO
     Indicated          575.6      58.0       2.2        17.5       10.56     0.99
      Inferred          519.5      58.8       1.9        17.6       10.51     1.03
          Total                                                                                                                  Contact:
                       3149.0      58.1       2.2        17.6       10.51     0.98                  Level1, 330 Churchill Avenue Subiaco
    Resources                                                                                                     Western Australia 6008
 Coal Resource ¹ based on minimum thickness cut-off of 0,5m                                                      Tel: +61 (08) 9200 4465
                                                                                                                  Fax:+61(08) 9200 4469
The coal qualities, reflected in the Resource Statement, are those for Raw Coal and do not             Web: www.firestoneenergy.com.au
represent washed coal qualities.

Indicative washed qualities for the coal using a float of 2.0 gm/cm2 are shown in Table 2
below.


 Table 2 – Typical air-dried washed quality values for Coal Resource on the Waterberg
                                                                                                The
                                                                                               2.          Coal
 Coal Project Properties held under Mining Right
                                                                                                Resource     for
                 Ash % (ad)      IM % (ad) Vol % (ad) CV (Mj/kg) (ad)         TS % (ad)
                                                                                                the two farms
                        35.3           2.6          23.9              19.12        0.87
                                                                                                held under the
 Values based on Primary Product at Wash density of 2.0 gm/cm2
                                                                                                     Prospecting
      Permit is 734 million tonnes, of which 16.4 million tonnes is a Measured Resource, 280.7 million tonnes is
      Indicated, and 437.2 million tonnes is Inferred (Table 3).


     Table 3 – Coal Resource on the two Waterberg Coal Project Properties under Prospecting Permit

                                               Coal Resource
              Resource Classification                  ¹            Ash %     IM %    Vol %    CV (Mj/kg)     TS %
                                                    (Mt)
                     Measured                        16.4           53.23     1.63    19.18         12.38     1.18
                      Indicated                     280.7           62.16     2.52    16.75         8.74      1.02
                       Inferred                     437.2           58.97     2.46    17.32         9.96      1.03
                 Total Resources                    734.3           60.1      2.5     17.1          9.55      1.03
     Coal Resource ¹ based on minimum thickness cut-off of 0,5m

3.     The total Coal Resource on all six of the properties held under both the Mining Right and Prospecting Permit,
       is 3.883 billion tonnes, of which 2,070 billion tonnes is a Measured Resource (Table 4).

     Table 4 – Coal Resource on all six Waterberg Coal Project Properties under both Prospecting Permit and
     Mining Right
                                               Coal Resource
                                                                    Ash %     IM %    Vol %    CV (Mj/kg)     TS %
              Resource Classification                  ¹
                                                                     (ad)      (ad)    (ad)       (ad)        (ad)
                                                    (Mt)
                     Measured                  2070.3                57.9      2.2     17.6         10.51     0.96
                      Indicated                856.3                 59.4      2.3     17.2         9.96      1.00
                       Inferred                956.7                 58.9      2.2     17.5         10.26     1.03
                 Total Resources               3883.3                58.5      2.2     17.5         10.33     0.99
     Coal Resource ¹ based on minimum thickness cut-off of 0,5m

The updated Resource Statement represents a significant increase in the coal resource of the Waterberg Coal
Project Properties. SRK Consulting (Pty) Limited (December 2012) declared a Coal Resource of 1.183 billion
tonnes on the two farms Smitspan and Massenberg only, of which 1.004 billion tonnes was in the Measured
category (as part of the DFS process).

The doubling of the Measured Resource to 2.0 billion tonnes gives the project technical team the flexibility to
optimise the SRK Bankable Feasibility Study mine plan, currently set up to supply 10 million tonnes of coal
product per annum to Eskom. Optimisation of the mine plan could have a favourable impact on yields, operating
costs, and annual tonnes mined.

Additional Drilling
The joint venture partners have advised that there is an intention to carry out further and additional drilling on
the properties to further increase the minable resources so that the project partners have additional flexibility in
planning for the proposed start-up of the project.

The Eskom MOU
The Waterberg Coal Joint Venture partners (through Sekoko Coal) have executed an MOU with Eskom for the
supply of 10 million tonnes of coal product per annum; commencing mid-2015. Currently, the joint venture
partners are in the process of working through a formal Coal Supply Agreement (CSA) to reflect the salient terms
and conditions for the supply of the coal.


                                                                                                             2
The Bankable Feasibility Study
The project partners in the Waterberg Coal Project advise that the technical work on the Bankable Feasibility
Study (BFS) has now been completed. The project partners expect to publish the findings to the market in the
next 2 weeks following compilation of the final outstanding reports.

Yours sincerely
Stephen Miller
Chief Executive Officer

www.firestoneenergy.com.au


Note 1: Competent Person Statement

Gemecs (Pty) Limited was commissioned by Firestone Energy Limited "FSE", to undertake an Updated
Independent Persons Geological Report for the Sekoko Waterberg Coal Project.

The Coal Resources were estimated in accordance with the South African code for the Reporting of
Exploration Results, Mineral Resources and Mineral Reserves (“SAMREC Code”), Australasian Code for
Reporting of Exploration Results. Mineral Resources and Ore Reserves (“the JORC Code”) and South
African National Standard (SANS 10320:2004) guidelines.

The information in this announcement that relates to Exploration Results, Mineral Resources or Ore
Reserves is based on information compiled by Mr Coenraad D van Niekerk, Pr.Sci.Nat (Reg. No
400066/98), M.Sc Hons (Geology), MDP, an employee of Gemecs (Pty) Limited, who is a Fellow of the
Geological Society of South Africa. Mr Niekerk is a mining geologist with 38 years’ experience in the
mining industry, sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Niekerk consents to the inclusion in the announcement of the matters based on
this information in the form and context in which it appears.

24 October 2013

Johannesburg



Sponsor

River Group




                                                                                                      3

Date: 24/10/2013 07:55:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story