To view the PDF file, sign up for a MySharenet subscription.

FIRESTONE ENERGY LIMITED - Interim resource statement, project timeline and BFS update

Release Date: 28/05/2013 10:15
Code(s): FSE FSEO1     PDF:  
Wrap Text
Interim resource statement, project timeline and BFS update

 
FIRESTONE ENERGY LIMITED 
(Incorporated in Australia) 
(Registration number ABN 058 436 794) 
Share code on the JSE Limited: FSE   
Share code on the ASX: FSE 
ISIN: AU000000FSE6 
(SA company registration number 2008/023973/10) 
("FSE" or "the Company")

                                                                       About Firestone Energy

                                                                        Firestone Energy Limited is an
                                                                        independent, Australian exploration and
                                                                        development company listed on the
                                                                        Australian Stock Exchange Ltd (ASX) and
                                                                        the Johannesburg Stock Exchange (JSE).
INTERIM RESOURCE STATEMENT, PROJECT TIMELINE and                        Firestone Energy has entered into a Joint

                   BFS UPDATE                                           Venture with Sekoko Resources (Pty) Ltd
                                                                        through which Firestone Energy has
                                                                        acquired the right to 60% participation
Firestone Energy Limited (ASX/JSE: FSE) (“Firestone” or the             interests in the Waterberg Coal Project
“Company”), wishes to advise that following a period of extensive       located in Lephalale area, Limpopo Province,
drilling activity, the Company is pleased to report the results of an   South Africa.
interim Resource Statement as prepared by SRK Consulting.
                                                                        The first stage of the project is to develop the
                                                                        Smitspan mine which has a substantial
Interim Resource Statement                                              measured thermal coal resource and to
                                                                        develop the Vetleegte mine which is a
The interim Resource Statement covers only two properties of the        substantial metallurgical coal deposit.

four farms held by Sekoko Coal (a subsidiary of Sekoko Resources
                                                                        Firestone Energy is committed to becoming a
(Pty) Ltd) under a Mining Licence in the Waterberg being,               profitable independent coal and energy
Smitspan and Massenberg, and states the resource tonnage as             producer at its projects in South Africa,
equal to 1,090.88 Mt at Measured Status, 69.04 Mt at Indicated          thereby making a substantial contribution to
Status, and 23.27 Mt at inferred Status.                                the social and economic development of the
                                                                        Lephalale area and South Africa.
The balance of the resources on the farms held under Mining
                                                                        Corporate Details
Licence and Prospecting Licences are not included in this                                                    ASX: FSE
estimate and reflect further potential.                                                                      JSE: FSE

Table 1: Smitspan and Massenberg Coal Resource Statement as                                             Issued Capital:
                                                                                         3,549 million ordinary shares
at 31 December 2012
                                                                                                Major Shareholders:
                                                                                           Waterberg Coal Company
            Million   Ash     CV        IM    TS    VM      TYL                           Sekoko Resources (Pty) Ltd
                                                                                                    Linc Energy Ltd
            tons      (%)     (MJ/kg) (%)     (%)   (%)     (%)                               BBY Nominees Pty Ltd
Measured                                                                                      Directors and Officers
Resource 1,090.88 52.27          12.91 2.39 1.29 19.52 48.03
                                                                                          Non Executive Directors:
Indicated                                                                                 Mr Tim Tebeila (Chairman)
Resource    69.04 51.72          13.38 2.58 1.35 19.23 49.70                        David Perkins (Deputy Chairman)
                                                                                                      Dr Pius Kasolo
Inferred                                                                                             Ben Mphahlele
Resource    23.27 59.13          14.19 2.74 1.59 20.84 52.21                                       Kobus Terblanche
                                                                                                         Oren Zohar
Total                                                                                                    Jack James
Resource 1,183.19 52.36          12.96 2.41 1.30 19.53 48.20
                                                                                                         Officers:
                                                                                               Mr David Knox CEO
The coal qualities, reflected in the Resource Statement, are those                         Ms Amanda Matthee CFO
for Raw Insitu Coal and do not represent the washed coal                         Mr Jerry Monzu Company Secretary
qualities. The beneficiated tonnages will be reported in the
completed BFS.                                                                                               Contact:
                                                                                         Suite B9, 431 Roberts Road
                                                                                     Subiaco, Western Australia 6008
                                                                                             Tel: +61 (08) 9287 4600
Project Timeline and BFS Update

The Technical Team have confirmed that the Bankable Feasibility Study ("BFS") is
currently scheduled to be completed by the end of June 2013. The delivery of the
BFS is one of the key Conditions Precedent ("CP") in the process of converting the
current Eskom MoU, to supply 10 million tonnes per annum, to a Coal Supply
Agreement ("CSA").

The finalising of a CSA would include several CP's to be met, including that;

1. Eskom are satisfied with the quality of the coal; and

2. An agreement is finalised on the price of the coal to be supplied and
   purchased. The coal price negotiations are expected to commence during
   2nd Half 2013 and Eskom have indicated that they may embark on a bulk
   sample burn test to confirm the coal qualities, the results of which may be
   available in 1st half 2014.

Based on the current timetable, production is expected to commence during 2nd
Half 2015, between 12 to 18 months after the completion of the CSA and the
confirmed drawdown of project financing facilities.

Yours sincerely,




David Knox
Chief Executive Officer
www.firestoneenergy.com.au
Tel:   Australia (+61 08 9287 4600)
       South Africa (+27 11 706 3548)



Competent Persons Statement

Information in this announcement that relates to exploration results, coal resources or reserves on the properties
Smitspan 306LQ and Massenburg 305LQ is based on information compiled by Mr Sello Nzama. Mr Nzama who is
employed by SRK Consulting (Pty) Ltd is a member of the South African Council for Natural Scientific Professions.
Mr Nzama has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004
Edition of the “Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves”
(The JORC Code). Mr Nzama consents to the inclusion in the announcement of the matters based on his
information in the form and context in which it appears.




About Sekoko Resources

Sekoko Resources (Pty) Ltd is a South African-based black-owned energy and minerals company
developing the coal, magnetite iron ore and PGMs Projects in the Limpopo Province of South Africa.
This includes a significant exploration program and development of the Waterberg Coal Joint Venture
Project based on significant Coal Zone Resources. Sekoko is targeting to commence operations in 2012,
thus forming the basis for developing a global coal business.

Johannesburg
28 May 2013

Sponsor
River Group
                                                                                                           2

Date: 28/05/2013 10:15:00 Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.

Share This Story